← Back
BuildNYC
Elevator cooperative
901 LEXINGTON AVENUE
MANHATTAN · BIN 1042469
💬 Discuss this project
1907Year Built
11Stories
D4Building Class
R9XZoning
59,928 sfGross Floor Area
19Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 901 Lexington Ave · 5,925 sf lot · 10.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRoof terrace repairs and paver addition8p · 1 filing · 12 docs
Floor 11Unit 10S, Unit 11NUnder Construction19p · 3 filings · 20 docs
Floor 10
Floor 9
Floor 8Unit 8N7p · 1 filing · 6 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
901 Lexington Ave3803/22/2026
Sixty Sutton610/04/2026
901 Lexing303/21/2026
Gimbel103/21/2026
Brown Harris Stevens103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Moore Associates109/09/2026
Conlon Engineering409/26/2025
A2 Architect103/31/2025
CES Engineering505/31/2022
Douglas C Wright Architects403/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting203/21/2026
Agouti Construction Consulting903/21/2026
DHD Architecture803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rusk ApartmentGeneral Contractor707/08/2026
Flower Lab NYGeneral Contractor204/09/2026
R. GunzerElectrical103/21/2026
Schorr's Electric CoElectrical103/21/2026
Warren Ostroff ElectricElectrical103/21/2026
Attic to Basement HomeGeneral Contractor104/08/2026
Panorama Windowsspecialty_contractor109/24/2026
C.Q. Electr'l ContractingElectrical103/21/2026
Donato PlumbingPlumbing107/08/2026
JSP Electl CNTNGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 Architect2504103/31/2025
EP Inspections and Commis7079209/03/2024
CES Engineering1277203/30/2022
Integrity Consulting Service666603/30/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/23/2026
Permit issued — General Construction
M01445770-I1-GC
09/09/2026
Filed — Alteration
REPLACEMENT OF TWO EXISTING LOT LINE WINDOWS WITHIN EXISTING MASONRY OPENINGS AT APT #10S ON THE 11TH FLOOR. ALL AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.
M01445770-I1
08/14/2026
Special inspection requirement — Fenestration areas
Miguel Armijos
08/14/2026
Special inspection requirement — Fenestration air leakage
Miguel Armijos
146 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPanorama Windows09/23/2026
DOB NOWGeneral ConstructionPermit IssuedFlower Lab NY11/18/2025
DOB NOWStructuralPermit IssuedFlower Lab NY11/18/2025
DOB NOWGeneral ConstructionSigned-offAttic to Basement Home04/30/2025
DOB NOWGeneral ConstructionSigned-offRusk Apartment11/04/2021
DOB NOWPlumbingSigned-offDonato Plumbing09/30/2021
DOB NOWMechanical SystemsSigned-offRusk Apartment09/21/2021
DOB NOWGeneral ConstructionSigned-offRusk Apartment09/17/2021
BISPLISSUEDSparaco's P&H08/09/2021
BISOTISSUEDPofi Construction06/26/2018
BISOTISSUEDPofi Construction04/30/2018
BISOTISSUEDAdriatic Plumbing & Heating04/24/2018
BISPLISSUEDAdriatic Plumbing & Heating04/24/2018
BISPLISSUEDLiquid Plumbing & Heating SCS07/21/2016
BISOTISSUEDSyo Interiors11/20/2015
BISPLISSUEDRRP Plumbing06/26/2015
BISEQISSUEDH Interior Design Construction06/25/2015
BISOTISSUEDH Interior Design Construction06/25/2015
BISPLISSUEDFive Star P and H Co01/23/2015
BISOTISSUEDPali Building Restoration04/08/2014
BISPLISSUEDM Burton P & H03/05/2014
BISOTISSUEDThe Renovated Home 102/04/2014
BISOTISSUEDDesign Development NYC01/22/2014
BISPLISSUEDCLP Plumbing11/15/2013
BISPLISSUEDDonato07/23/2013
BISOTISSUEDDesign Development NYC07/08/2013
BISEQISSUEDEverest Scaffolding03/28/2013
BISOTISSUEDPali Building Restoration09/25/2012
BISPLISSUEDNew York Plumbing & Heating09/06/2012
BISOTISSUEDArbe Construction08/30/2012
BISOTISSUEDArbe Construction08/30/2012
BISOTISSUEDPali Building Restoration04/16/2012
BISEQISSUEDEverest Scaffolding04/11/2012
BISEQISSUEDEverest Scaffolding04/10/2012
BISPLISSUEDGolds Plumbing04/15/2009
BISOTISSUEDS. Donadic01/14/2009
BISMHISSUEDExpert Finest Co05/22/2008
BISOTISSUEDExpert Finest Co01/15/2008
BISPLISSUEDIsogon Plumbing02/04/2005
BISOTISSUEDIsogon Interum02/04/2005
+ 18 more permits on file
6 projects · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026CompleteAccurate Electrical ContractorsGeneral Wiring
04/03/2025CompleteHigh Impact ElectricGeneral Wiring
03/19/2025CompleteAccurate ElectricalGeneral Wiring
08/19/2022CompleteEis Electric Corp DbaGeneral Wiring
07/25/2022CompleteBNH ElectricalGeneral Wiring
09/25/2021Permit IssuedRobert Chimenti—
1 project · most recent 09/26/2025
FiledStatusContractorScope
09/26/2025Permit IssuedFlower Lab NY—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
08/14/2026Fenestration areasMiguel Armijosenergy_progress
08/14/2026Fenestration air leakageMiguel Armijosenergy_progress
08/14/2026Air barrier - visual inspectionMiguel Armijosenergy_progress
08/14/2026Energy Code Compliance InspectionsMiguel Armijosprogress
08/14/2026Fenestration and door U-factor and product ratingsMiguel Armijosenergy_progress
08/13/2026FinalMiguel Armijosprogress
10/20/2025FinalDavid Howellprogress
10/20/2025Tenant Protection Plan ComplianceMOLLY GLENNspecial
09/25/2025FinalDavid Howellprogress
09/25/2025Tenant Protection Plan Compliance—special
03/31/2025Lighting in dwelling unitsAnn Macklinenergy_progress
03/31/2025HVAC-R and service water heating equipmentAnn Macklinenergy_progress
03/31/2025Air barrier - visual inspectionAnn Macklinenergy_progress
03/31/2025HVAC-R and service water heating system controlsAnn Macklinenergy_progress
03/31/2025Energy Code Compliance InspectionsAnn Macklinprogress
02/03/2025Mechanical SystemsAnn Macklinspecial
02/03/2025FinalAnn Macklinprogress
10/25/2024Tenant Protection Plan Compliance—special
10/24/2024FinalDavid Howellprogress
08/13/2024Tenant Protection Plan ComplianceMOLLY GLENNspecial
04/01/2024FinalDavid Howellprogress
04/11/2022Duct leakage testing, insulation and designDelbert Smithenergy_progress
04/11/2022Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
04/11/2022Mechanical SystemsDelbert Smithspecial
04/11/2022Energy Code Compliance InspectionsDelbert Smithprogress
Latest 25 of 47.
349 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account