One story retail building
920 60 STREET
BROOKLYN · BIN 3141179
💬 Discuss this project
1964Year Built
1Stories
K1Building Class
M1-1Zoning
18,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 90060 AMG LLC · 18,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 1Under Construction19p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UB CONTRACTING3407/08/2026
90060 AMG LLC103/22/2026
900 60 ST CP103/22/2026
900 60TH STREET REALTY603/22/2026
CABLEVISION SYSTEMS403/21/2026
1047 E 46TH STREET603/21/2026
CABLEVISION SYSTEMS NYC503/21/2026
900 60TH STREET103/21/2026
CABLEVISION SYSTEMS NEW YORK CIT503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/19/2016$9.3M—900 60TH STREET REALTY CORP. → WJ & C INVESTMENT LLC$515/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GC ENG & ASSOCIATES, PC1106/15/2026
J&R DESIGN AND INSPECTION CORP.106/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338803/21/2026
R I EXPEDITING SERVICES1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
U B CONTRACTING INCGeneral Contractor407/08/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
M & J BUILD INCGeneral Contractor303/21/2026
KALE CONSTRUCTION INCGeneral Contractor207/08/2026
KJK ELECTRIC INCElectrical103/22/2026
WHITESTONE PLUMBING CORPPlumbing107/08/2026
WHITESTONE PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GC ENG & ASSOCIATES PC1796306/15/2026
CENTURY TESTING & CONSULT4081406/12/2025
J&R DESIGN AND INSPECTION6637203/03/2025
Building Lifecycle
All (89)Filed (12)Permit Issued (8)Signed Off (3)Violation (9)Inspection (14)Objection (13)Special Inspection (30)
06/15/2026
Filed — Alteration CO
NEW RATED PARTITION AS NEEDED TO CHANGE USE FROM UG 17 (APPAREL MANUFACTURING) TO UG VIII (FAMILY RECREATION & ACTIVITY SPACE), UG IIIB (COMMUNITY FACILITY AMBULATORY HEALTH FACILITY) AND UG IV(B) COMMUNICATION INFRASTRUCTURE. CHANGE OCCUPANCY AS SHOWN
B01092395-P3
03/30/2026
Special inspection requirement — Mechanical Systems
Gene Eng
03/30/2026
Special inspection requirement — Permanent certificate
Gene Eng
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Gene Eng
03/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
Gene Eng
03/30/2026
Special inspection requirement — Final
Peter Kanakos
03/30/2026
Special inspection requirement — Ventilation and air distribution system
Gene Eng
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Gene Eng
03/30/2026
Special inspection requirement — Maintenance information
Gene Eng
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Gene Eng
01/30/2026
Signed off — Alteration CO
NEW RATED PARTITION AS NEEDED TO CHANGE USE FROM UG 17 (APPAREL MANUFACTURING) TO UG VIII (FAMILY RECREATION & ACTIVITY SPACE), UG IIIB (COMMUNITY FACILITY AMBULATORY HEALTH FACILITY) AND UG IV(B) COMMUNICATION INFRASTRUCTURE. CHANGE OCCUPANCY AS SHOWN
B01092395-S3
10/18/2025
Violation issued (FDNY_NOV, closed)
07/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/20/2025
Objection raised — Zoning
06/12/2025
Filed — Alteration CO
NEW RATED PARTITION AS NEEDED TO CHANGE USE FROM UG 17 (APPAREL MANUFACTURING) TO UG VIII (FAMILY RECREATION & ACTIVITY SPACE), UG IIIB (COMMUNITY FACILITY AMBULATORY HEALTH FACILITY) AND UG IV(B) COMMUNICATION INFRASTRUCTURE. CHANGE OCCUPANCY AS SHOWN
B01092395-P2
06/11/2025
Violation issued (ECB, closed)
Construction
06/11/2025
Special inspection requirement — Lighting controls
ALDO BRAVO
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
06/11/2025
Special inspection requirement — Interior lighting power
ALDO BRAVO
06/10/2025
Signed off — Alteration
RENOVATION OF EXIST. COMMERCIAL SPACE WITH, REMOVE AWNING, ROLLING GATE, WALL, STOREFRONT, DOOR, PARTITION, CEILING, FLOOR TILE, REPAIR/REPLACE/NEW PARTITION, FLOOR, STOREFRONT, DOOR, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00747399-I1
06/06/2025
Violation issued (FDNY_NOV, closed)
06/06/2025
Violation issued (FDNY_ORDER, closed)
04/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/07/2025
Filed — Alteration CO
NEW RATED PARTITION AS NEEDED TO CHANGE USE FROM UG 17 (APPAREL MANUFACTURING) TO UG VIII (FAMILY RECREATION & ACTIVITY SPACE), UG IIIB (COMMUNITY FACILITY AMBULATORY HEALTH FACILITY) AND UG IV(B) COMMUNICATION INFRASTRUCTURE. CHANGE OCCUPANCY AS SHOWN
B01092395-P1
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
04/01/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
04/01/2025
Special inspection requirement — Lighting controls
ALDO BRAVO
04/01/2025
Special inspection requirement — Interior lighting power
ALDO BRAVO
03/28/2025
Permit issued — Mechanical Systems
B01092395-S4-MS
03/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/20/2025
Permit issued — General Construction
B00747399-I1-GC
03/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/05/2025
Special inspection requirement — Fenestration areas
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Masonry
ALDO BRAVO
03/05/2025
Special inspection requirement — Air barrier - visual inspection
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Fenestration air leakage
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
03/05/2025
Special inspection requirement — Final
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
03/03/2025
Filed — Alteration
RENOVATION OF EXIST. COMMERCIAL SPACE WITH, REMOVE AWNING, ROLLING GATE, WALL, STOREFRONT, DOOR, PARTITION, CEILING, FLOOR TILE, REPAIR/REPLACE/NEW PARTITION, FLOOR, STOREFRONT, DOOR, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00747399-P2
02/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
02/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
02/23/2025
Special inspection requirement — Masonry
Robert Truskosky
02/23/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
02/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/22/2025
Permit issued — General Construction
B01092395-I1-GC
01/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/21/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/08/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/02/2025
Objection resolved — Addressed
12/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Signed off — Alteration
B00747760-I1
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedM & J BUILD INC03/28/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC03/20/2025
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC01/22/2025
DOB NOWSprinklersSigned-offTEMPERINI MECHANICAL INC11/22/2024
DOB NOWPlumbingSigned-offWHITESTONE PLUMBING CORP11/12/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC09/06/2024
DOB NOWGeneral ConstructionSigned-offU B CONTRACTING INC01/03/2024
DOB NOWConstruction FenceSigned-offU B CONTRACTING INC01/03/2024
BISSPISSUEDALLSTATE SPRINKLER LLC05/01/2018
BISOTISSUEDTHE MARTIN GROUP NEW YORK04/27/2018
BISOTISSUEDTHE MARTIN GROUP NEW YORK04/26/2018
BISOTISSUEDPARR CONSTRUCTION INC04/22/2010
BISFPISSUEDALL FIRE SYSTEMS06/06/2005
BISFPISSUEDALL FIRE SYSTEMS09/05/2003
BISOTISSUEDJAMES WOERNER INC07/24/2003
BISSPISSUEDABCO-PEERLESS SPRKLR CORP02/06/2003
BIS—ISSUEDCABLEVISION SYSTEMS NYC CORP12/13/2002
BIS—ISSUEDHSU & ASSOC INC09/12/2002
BISMHISSUEDNUCOR CONSTRUCTION CORP07/31/2002
BISPLISSUEDLAB PLBG & HTG CO INC06/13/2002
BISOTISSUEDNUCOR CONSTRUCTION CORP05/20/2002
BISOTISSUEDNUCOR CONSTRUCTION CORP04/25/2002
BISPLISSUEDMAJOR PLUMBING & HEATING09/11/1996
BIS—ISSUEDLST CONSTRUCTION INC09/11/1996
BISSPISSUEDDEPENDABLE SPR.CORP09/09/1996
BISPLISSUEDWASOFF PLBG & UTILITY CO01/04/1996
1 project · most recent 06/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/15/2026Permit IssuedM & J BUILD INCHeating and Air Conditioning Systems
Heat / Cool
York DM120N15N2AAA2B 10 tons · Rooftop Unit ×2
DM240N24N2AAA2B 20 tons · Rooftop Unit ×2
3 projects · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024CompleteKJK ELECTRIC INCGeneral Wiring
09/25/2024CompleteHV ELECTRIC CORPGeneral Wiring
07/16/2018CompleteC.M. RICHEY ELEC'L CONTRGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/08/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/30/2026Mechanical SystemsGene Engspecial
03/30/2026Permanent certificateGene Engenergy_progress
03/30/2026HVAC-R and service water heating equipmentGene Engenergy_progress
03/30/2026Duct leakage testing, insulation and designGene Engenergy_progress
03/30/2026FinalPeter Kanakosprogress
03/30/2026Ventilation and air distribution systemGene Engenergy_progress
03/30/2026HVAC-R and service water heating system controlsGene Engenergy_progress
03/30/2026Maintenance informationGene Engenergy_progress
03/30/2026HVAC-R and service water piping design and insulationGene Engenergy_progress
06/11/2025Lighting controlsALDO BRAVOenergy_progress
06/11/2025Fire-Resistant Penetrations and JointsALDO BRAVOspecial
06/11/2025Energy Code Compliance InspectionsALDO BRAVOprogress
06/11/2025Interior lighting powerALDO BRAVOenergy_progress
04/01/2025Fire-Resistant Penetrations and JointsALDO BRAVOspecial
04/01/2025Energy Code Compliance InspectionsALDO BRAVOprogress
04/01/2025Lighting controlsALDO BRAVOenergy_progress
04/01/2025Interior lighting powerALDO BRAVOenergy_progress
03/05/2025Fenestration areasFRANZ SEBORGAenergy_progress
03/05/2025Fenestration and door U-factor and product ratingsFRANZ SEBORGAenergy_progress
03/05/2025MasonryALDO BRAVOspecial
03/05/2025Air barrier - visual inspectionFRANZ SEBORGAenergy_progress
03/05/2025Fenestration air leakageFRANZ SEBORGAenergy_progress
03/05/2025Energy Code Compliance InspectionsALDO BRAVOprogress
03/05/2025FinalFRANZ SEBORGAprogress
03/05/2025Fire-Resistance Rated ConstructionALDO BRAVOprogress
Latest 25 of 38.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/29/2026B00747760-I1Request digital key ↗
08/29/2026B00747399-P2Request digital key ↗
08/29/2026B00747399-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION11
01/09/2019321768832Open ↗
08/24/2018321807256Open ↗
07/23/2018321807256Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION4
05/02/2018321747749Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01092395-P2Open ↗
08/13/2026B01092395-P1Open ↗
08/13/2026B01092395-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026B01092395-P2Open ↗
09/23/2026B01092395-P2Open ↗
09/23/2026B01092395-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026B00747760-I1Open ↗
08/29/2026B00747399-P2Open ↗
08/29/2026B00747399-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B01092395-P2Open ↗
09/10/2026B01092395-P1Open ↗
09/01/2026B00747399-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
11/23/2018321747749Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/21/2010320144492Open ↗
▸Trade Schedules & Equipment5
▸BISFA - FDNY APPROVAL : FD-FAA3
09/05/2019321807256Open ↗
08/12/2019321807256Open ↗
06/26/2019321807256Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/27/2018321747749Open ↗
04/26/2018321747749Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B01092395-P2Open ↗
08/13/2026B01092395-P1Open ↗
08/13/2026B01092395-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/29/2026B00747399-P2Open ↗
08/29/2026B00747399-P1Open ↗
08/29/2026B00747399-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/23/2018321807256Open ↗
06/05/2018321768832Open ↗
04/27/2018321747749Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/21/2010320144492Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/27/2018321747749Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/23/2018321747749Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00747399-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
09/05/2019321807256Open ↗
08/12/2019321807256Open ↗
03/13/2019321747749Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
04/21/2010320144492Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/16/2010320144492Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
08/12/2019321807256Open ↗
11/23/2018321747749Open ↗
11/23/2018321747749Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET8
06/05/2018321768832Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
09/05/2019321807256Open ↗
08/12/2019321807256Open ↗
03/13/2019321747749Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/13/2026B01092395-P2Open ↗
08/13/2026B01092395-P1Open ↗
08/13/2026B01092395-I1Open ↗