Miscellaneous warehouse
902 MEEKER AVENUE
BROOKLYN · BIN 3069688
💬 Discuss this project
1960Year Built
1Stories
E9Building Class
M3-1Zoning
14,400 sfGross Floor Area
1Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Miscellaneous warehouse · Owner of record: PEERLESS EQUITIES LLC · 14,550 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof3p · 2 filings · 20 docs
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVARGA CONSTRUCTION607/08/2026
SPRING SCAFFOLDING LLC903/22/2026
PEERLESS EQUITIES1203/22/2026
PEERLESS EQUITY603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1203/21/2026
JME BUILDING CONSULTING203/21/2026
UNITED SAFETY CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVARGA CONSTRUCTION CORPGeneral Contractor307/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
BUCKMILLER AUTO.SPKLR.CORFire Protection107/08/2026
NY PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WAVIC ENGINEERING PLLC1733112/17/2024
RYAN SPECIAL ENGINEERING2018603/28/2024
AMKA & ASSOCIATES LLC8239207/27/2022
Building Lifecycle
All (91)Filed (14)Permit Issued (6)Signed Off (3)Violation (11)Inspection (5)Objection (22)Special Inspection (30)
09/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Permit issued — Plumbing
B01134003-I1-EW-SP
03/14/2025
Signed off — Alteration
EXTERIOR BRICK STUCCO FACADE REPAIRS. REPAIR AND REPLACE ANY DETERIORATING CONSTRUCTION ELEMENTS UNCOVERED BY THE PROBES AND REPAIRS. All structural work filed separately under B00772236
B00605947-I1
02/05/2025
Violation issued (ECB, closed)
Construction
12/17/2024
Filed — Alteration
INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS
B01134003-I1
10/29/2024
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
08/26/2024
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy
B00863511-I1
04/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
03/28/2024
Filed — Alteration
FILING TO INSTALL (10) TEN GAS HEATERS.
B00939568-P4
03/22/2024
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD ON SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00940768-I1
03/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
02/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
01/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
01/30/2024
Special inspection requirement — Mechanical Systems
William Ryan
01/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/30/2024
Special inspection requirement — Final
Richard Palandrani
01/25/2024
Filed — Alteration
FILING TO INSTALL (10) TEN GAS HEATERS.
B00939568-P3
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/16/2024
Filed — Alteration
FILING TO INSTALL (10) TEN GAS HEATERS.
B00939568-P2
01/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Filed — Alteration
FILING TO INSTALL (10) TEN GAS HEATERS.
B00939568-P1
01/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
01/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
01/03/2024
Special inspection requirement — Mechanical Systems
William Ryan
01/03/2024
Special inspection requirement — Final
Richard Palandrani
01/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
12/07/2023
Permit issued — Plumbing
B00939568-S1-PL
10/31/2023
Objection resolved — Addressed
10/31/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/27/2023
Objection resolved — Addressed
10/27/2023
Objection resolved — Addressed
10/27/2023
Objection resolved — Addressed
10/26/2023
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy
B00863511-P2
10/17/2023
Objection raised — Scope
10/17/2023
Objection raised — Scope
10/17/2023
Objection raised — Scope
10/17/2023
Objection raised — Mechanical
10/17/2023
Objection raised — Other
10/17/2023
Objection raised — Scope
10/12/2023
Filed — Alteration
FILING TO INSTALL (10) TEN GAS HEATERS.
B00939568-S1
10/12/2023
Filed — Alteration
FILING TO INSTALL (10) TEN GAS HEATERS.
B00939568-I1
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/29/2023
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy
B00863511-P1
09/28/2023
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD ON SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00940768-I1
09/28/2023
Permit issued — Supported Scaffold
B00940768-I1-SF
09/26/2023
Violation issued (ECB, closed)
Construction
09/26/2023
Violation issued (ECB, closed)
Construction
08/04/2023
Permit issued — General Construction
B00772236-I1-GC-CX
07/17/2023
Special inspection requirement — Structural Steel - Welding
AHMAD KHANZADA
07/17/2023
Special inspection requirement — Post-installed Anchors
AHMAD KHANZADA
07/17/2023
Special inspection requirement — Final
DIEGO ERAS
07/17/2023
Special inspection requirement — Structural Steel - Details
AHMAD KHANZADA
07/17/2023
Special inspection requirement — Structural Steel - High Strength Bolting
AHMAD KHANZADA
07/17/2023
Special inspection requirement — Masonry
AHMAD KHANZADA
07/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBUCKMILLER AUTO.SPKLR.COR04/28/2025
DOB NOWPlumbingSigned-offNY PLUMBING & HEATING COR12/07/2023
DOB NOWSupported ScaffoldSigned-offAVARGA CONSTRUCTION CORP09/28/2023
DOB NOWGeneral ConstructionPermit IssuedAVARGA CONSTRUCTION CORP08/04/2023
DOB NOWGeneral ConstructionSigned-offAVARGA CONSTRUCTION CORP06/26/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/26/2023
BISOTISSUED3 L. BROS. CORP01/10/2019
BISOTISSUED3 L. BROS. CORP01/08/2019
BISOTISSUEDOBAR SYSTEMS, INC07/11/2018
BISOTISSUEDOBAR SYSTEMS, INC07/11/2018
1 project · most recent 03/28/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/28/2024——Heating Systems
Heating
Modine MODINE MODPDP150AN 150,000 BTU ×10
MODINE MODPDP200AN 200,000 BTU ×6
MODINE MODHD75AS01-11 75,000 BTU ×4
1 project · most recent 12/17/2024
FiledStatusContractorScope
12/17/2024Signed-offBUCKMILLER AUTO.SPKLR.COR—
2 projects · most recent 12/17/2024
Water/Sanitary Gas
FiledStatusContractorScope
12/17/2024——Water/Sanitary
03/28/2024Signed-offNY PLUMBING & HEATING CORGas
3 projects · most recent 04/24/2023
General Wiring
FiledStatusContractorScope
04/24/2023Permit IssuedTOP SHELF ELECTRIC CORP—
09/04/2018Permit IssuedFSM ELECTRICAL CORPORATIOGeneral Wiring
07/23/2018Permit IssuedFSM ELECTRICAL CORPORATIOGeneral Wiring
1 project · most recent 07/11/2023
Steel Masonry
FiledStatusContractorScope
07/11/2023Permit IssuedAVARGA CONSTRUCTION CORPSteel, Masonry
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
10/29/2024Sprinkler SystemsDARIUSZ LUCZAKspecial
03/29/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
03/18/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/30/2024HVAC-R and service water heating system controls—energy_progress
01/30/2024HVAC-R and service water heating equipment—energy_progress
01/30/2024Mechanical SystemsWilliam Ryanspecial
01/30/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/30/2024FinalRichard Palandraniprogress
01/24/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/03/2024HVAC-R and service water heating equipment—energy_progress
01/03/2024HVAC-R and service water heating system controls—energy_progress
01/03/2024Mechanical SystemsWilliam Ryanspecial
01/03/2024FinalRichard Palandraniprogress
01/03/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/02/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
07/17/2023Structural Steel - WeldingAHMAD KHANZADAspecial
07/17/2023Post-installed AnchorsAHMAD KHANZADAspecial
07/17/2023FinalDIEGO ERASprogress
07/17/2023Structural Steel - DetailsAHMAD KHANZADAspecial
07/17/2023Structural Steel - High Strength BoltingAHMAD KHANZADAspecial
07/17/2023MasonryAHMAD KHANZADAspecial
07/17/2023Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
07/06/2023Post-installed Anchors—special
07/06/2023Structural Steel - Details—special
07/06/2023Structural Steel - High Strength Bolting—special
Latest 25 of 32.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/27/2026B00863511-P2Request digital key ↗
08/27/2026B00863511-I1Request digital key ↗
08/27/2026B00863511-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
01/10/2019321904436Open ↗
01/09/2019321904445Open ↗
07/12/2018321802411Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
01/11/2019321904445Open ↗
01/11/2019321904436Open ↗
07/12/2018321802411Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWSpecial Inspector Seal & Signature15
09/28/2026B00939568-P2Open ↗
09/01/2026B01134003-I1Open ↗
09/01/2026B00939568-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026B00863511-I1Open ↗
08/27/2026B00772236-I1Open ↗
08/27/2026B00772236-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
01/11/2019321904445Open ↗
01/11/2019321904436Open ↗
01/10/2019321904436Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/10/2019321904436Open ↗
01/09/2019321904445Open ↗
07/12/2018321802411Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/28/2026B00939568-P2Open ↗
08/27/2026B00772236-I1Open ↗
08/27/2026B00605947-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/09/2019321904445Open ↗
07/12/2018321802411Open ↗
07/12/2018321802402Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00772236-I1Open ↗
08/27/2026B00772236-P1Open ↗
08/26/2026B00939568-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/10/2019321904436Open ↗
01/09/2019321904445Open ↗
07/12/2018321802411Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/10/2019321904436Open ↗
01/09/2019321904445Open ↗
10/18/2018321802402Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/05/2018321802402Open ↗
11/05/2018321802411Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/07/2018321802411Open ↗
11/05/2018321802402Open ↗
11/05/2018321802411Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
01/10/2019321904436Open ↗
01/09/2019321904445Open ↗
10/18/2018321802402Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM4
11/07/2018321802411Open ↗
11/05/2018321802402Open ↗
11/05/2018321802411Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
01/03/2019321904436Open ↗
01/03/2019321904445Open ↗
07/12/2018321802411Open ↗
Showing 3 of 4 on file for this type