← Back
Miscellaneous warehouse
902 MEEKER AVENUE
BROOKLYN · BIN 3069689
💬 Discuss this project
1960Year Built
1Stories
E9Building Class
M3-1Zoning
14,400 sfGross Floor Area
1Units
Miscellaneous warehouse · Owner of record: PEERLESS EQUITIES LLC · 14,550 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof6p · 1 filing · 20 docs
Floor 11p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVARGA CONSTRUCTION704/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1203/21/2026
JME BUILDING CONSULTING403/21/2026
UNITED SAFETY CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVARGA CONSTRUCTION CORPGeneral Contractor404/09/2026
BUCKMILLER AUTO.SPKLR.CORFire Protection107/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor104/09/2026
NY PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WAVIC ENGINEERING PLLC1733207/23/2025
RYAN SPECIAL ENGINEERING2018603/28/2024
AMKA & ASSOCIATES LLC8239207/27/2022
Building Lifecycle
All (76)Filed (16)Permit Issued (7)Signed Off (4)Inspection (8)Objection (22)Special Inspection (19)
10/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2025
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
07/23/2025
Filed — Alteration
INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS
B01134020-P1
07/23/2025
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
04/28/2025
Permit issued — Plumbing
B01134020-I1-EW-SP
03/14/2025
Signed off — Alteration
Exterior brick stucco facade probes and repairs. Repair and replace any deteriorating construction elements uncovered by the probes and repairs Filing to resolve ECB #039045051M.
B00593957-I1
12/17/2024
Filed — Alteration
INSTALL FIRE SPRINKLER SYSTEM AS PER PLANS
B01134020-I1
08/26/2024
Signed off — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00863550-I1
04/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
03/28/2024
Filed — Alteration
FILING TO INSTALL (4) GAS HEATERS AND ASSOCIATED PIPING.
B00939576-P4
03/22/2024
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00940742-I1
03/22/2024
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00940742-S1
02/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/25/2024
Filed — Alteration
FILING TO INSTALL (4) GAS HEATERS AND ASSOCIATED PIPING.
B00939576-P3
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
01/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
01/22/2024
Special inspection requirement — Mechanical Systems
William Ryan
01/22/2024
Special inspection requirement — Energy Code Compliance Inspections
01/22/2024
Special inspection requirement — Final
Richard Palandrani
01/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/16/2024
Filed — Alteration
FILING TO INSTALL (4) GAS HEATERS AND ASSOCIATED PIPING.
B00939576-P2
01/09/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/03/2024
Filed — Alteration
FILING TO INSTALL (4) GAS HEATERS AND ASSOCIATED PIPING.
B00939576-P1
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
12/07/2023
Permit issued — Plumbing
B00939576-S1-PL
11/14/2023
Objection resolved — Addressed
11/13/2023
Objection resolved — Addressed
10/31/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/26/2023
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00863550-P2
10/17/2023
Objection resolved — Addressed
10/16/2023
Objection raised — Other
10/16/2023
Objection raised — Inspections
10/16/2023
Objection raised — Inspections
10/16/2023
Objection raised — Admin
10/16/2023
Objection raised — Scope
10/16/2023
Objection raised — Admin
10/12/2023
Filed — Alteration
FILING TO INSTALL (4) GAS HEATERS AND ASSOCIATED PIPING.
B00939576-S1
10/12/2023
Filed — Alteration
FILING TO INSTALL (4) GAS HEATERS AND ASSOCIATED PIPING.
B00939576-I1
09/29/2023
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00863550-P1
09/28/2023
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00940742-I1
09/28/2023
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00940742-S1
09/28/2023
Permit issued — Protection and Mechanical Methods
B00940742-I1-PMM
09/28/2023
Permit issued — Supported Scaffold
B00940742-S1-SF
08/04/2023
Permit issued — Structural
B00772237-I1-GC-CX
07/18/2023
Special inspection requirement — Post-installed Anchors
AHMAD KHANZADA
07/18/2023
Special inspection requirement — Structural Steel - High Strength Bolting
AHMAD KHANZADA
07/18/2023
Special inspection requirement — Structural Steel - Welding
AHMAD KHANZADA
07/18/2023
Special inspection requirement — Masonry
AHMAD KHANZADA
07/18/2023
Special inspection requirement — Structural Steel - Details
AHMAD KHANZADA
07/18/2023
Special inspection requirement — Final
DIEGO ERAS
07/11/2023
Filed — Alteration
EXTERIOR BRICK STUCCO FACADE REPAIRS. REPAIR AND REPLACE ANY DETERIORATING CONSTRUCTION ELEMENTS UNCOVERED BY THE PROBES AND REPAIRS
B00772237-P1
06/28/2023
Permit issued — General Construction
B00593957-I1-GC
04/24/2023
Filed — Alteration
Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00863550-I1
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBUCKMILLER AUTO.SPKLR.COR04/28/2025
DOB NOWPlumbingSigned-offNY PLUMBING & HEATING COR12/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offAVARGA CONSTRUCTION CORP09/28/2023
DOB NOWSupported ScaffoldSigned-offAVARGA CONSTRUCTION CORP09/28/2023
DOB NOWStructuralPermit IssuedAVARGA CONSTRUCTION CORP08/04/2023
DOB NOWGeneral ConstructionSigned-offAVARGA CONSTRUCTION CORP06/28/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC04/24/2023
1 project · most recent 03/28/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/28/2024——Heating Systems
Heating
Modine MODINE MODHD75AS01-11 75,000 BTU ×8
1 project · most recent 07/23/2025
FiledStatusContractorScope
07/23/2025Signed-offBUCKMILLER AUTO.SPKLR.COR394 heads
2 projects · most recent 07/23/2025
Water/Sanitary Gas
FiledStatusContractorScope
07/23/2025——Water/Sanitary
03/28/2024Signed-offNY PLUMBING & HEATING CORGas
1 project · most recent 04/24/2023
FiledStatusContractorScope
04/24/2023Permit IssuedTOP SHELF ELECTRIC CORP—
1 project · most recent 07/11/2023
Steel Masonry
FiledStatusContractorScope
07/11/2023Permit IssuedAVARGA CONSTRUCTION CORPSteel, Masonry
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/24/2025Sprinkler SystemsDARIUSZ LUCZAKspecial
07/23/2025Sprinkler SystemsDARIUSZ LUCZAKspecial
04/04/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/24/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/22/2024HVAC-R and service water heating equipment—energy_progress
01/22/2024HVAC-R and service water heating system controls—energy_progress
01/22/2024Mechanical SystemsWilliam Ryanspecial
01/22/2024Energy Code Compliance Inspections—progress
01/22/2024FinalRichard Palandraniprogress
01/02/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
07/18/2023Post-installed AnchorsAHMAD KHANZADAspecial
07/18/2023Structural Steel - High Strength BoltingAHMAD KHANZADAspecial
07/18/2023Structural Steel - WeldingAHMAD KHANZADAspecial
07/18/2023MasonryAHMAD KHANZADAspecial
07/18/2023Structural Steel - DetailsAHMAD KHANZADAspecial
07/18/2023FinalDIEGO ERASprogress
05/05/2022MasonryAHMAD KHANZADAspecial
10/13/2021Fire-Resistant Penetrations and JointsAHMAD KHANZADAspecial
09/14/2021FinalRichard Palandraniprogress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/01/2026B00593957-I1Request digital key ↗
08/27/2026B00863550-P2Request digital key ↗
08/27/2026B00863550-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026B00863550-P2Open ↗
08/27/2026B00863550-P1Open ↗
08/27/2026B00863550-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/18/2026B00939576-P1Open ↗
09/01/2026B00939576-S1Open ↗
09/01/2026B00772237-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00772237-I1Open ↗
08/26/2026B00593957-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026B00772237-P1Open ↗
08/27/2026B00772237-I1Open ↗
08/26/2026B00939576-S1Open ↗
Showing 3 of 11 on file for this type