2010Year Built
2Stories
Y9Building Class
M1-1Zoning
107,680 sfGross Floor Area
1Units
LL97 Covered4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Department of Environmental Protection · Owner of record: NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION · 104,570 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
Civil
Floor 21p · 1 filing · 20 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIRO ENGINEERS, INC.308/14/2023
WALTER T. GORMAN, P.E., P.C.208/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P WOLFE CONSULTANTS603/21/2026
WALTER T GORMAN PE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEMSTAR CONSTRUCTION CORP.General Contractor207/08/2026
FRANK MERESHENSKYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106508/14/2023
Building Lifecycle
All (23)Filed (5)Permit Issued (2)Signed Off (2)Special Inspection (14)
02/15/2024
Signed off — Alteration
EMPTY, PURGE, CLEAN, REMOVE & CLOSE IN-PLACE (1)4000-GAL GASOLINE & (1)4,000-GAL BIO DIESEL UST'S. INSTALL (1)2000-GAL DOUBLE-WALL FIBERGLASS GASOLINE, (1)6,000-GAL DIESEL DOUBLE-WALL FIBERGLASS UST'S,FUEL DISPENSERS,DISPENSING ISLAND & ASSOCIATED PIPING
B00620194-I1
10/16/2023
Signed off — Alteration
Propose to file for support of excavation. No change in use, egress or occupancy.
B00898202-I1
08/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
08/21/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/21/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/21/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/21/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
08/21/2023
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
08/21/2023
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
08/14/2023
Filed — Alteration
EMPTY, PURGE, CLEAN, REMOVE & CLOSE IN-PLACE (1)4000-GAL GASOLINE & (1)4,000-GAL BIO DIESEL UST'S. INSTALL (1)2000-GAL DOUBLE-WALL FIBERGLASS GASOLINE, (1)6,000-GAL DIESEL DOUBLE-WALL FIBERGLASS UST'S,FUEL DISPENSERS,DISPENSING ISLAND & ASSOCIATED PIPING
B00620194-P2
08/04/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/04/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
08/04/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/04/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/04/2023
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
08/04/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
08/04/2023
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
08/03/2023
Filed — Alteration
Propose to file for support of excavation. No change in use, egress or occupancy.
B00898202-P1
07/17/2023
Permit issued — Support of Excavation
B00898202-I1-SE
07/12/2023
Filed — Alteration
Propose to file for support of excavation. No change in use, egress or occupancy.
B00898202-I1
07/10/2023
Filed — Alteration
EMPTY, PURGE, CLEAN, REMOVE & CLOSE IN-PLACE (1)4000-GAL GASOLINE & (1)4,000-GAL BIO DIESEL UST'S. INSTALL (1)2000-GAL DOUBLE-WALL FIBERGLASS GASOLINE, (1)6,000-GAL DIESEL DOUBLE-WALL FIBERGLASS UST'S,FUEL DISPENSERS,DISPENSING ISLAND & ASSOCIATED PIPING
B00620194-P1
07/06/2023
Permit issued — Structural
B00620194-I1-GC-CX
11/01/2021
Filed — Alteration
EMPTY, PURGE, CLEAN, REMOVE & CLOSE IN-PLACE (1)4000-GAL GASOLINE & (1)4,000-GAL BIO DIESEL UST'S. INSTALL (1)2000-GAL DOUBLE-WALL FIBERGLASS GASOLINE, (1)6,000-GAL DIESEL DOUBLE-WALL FIBERGLASS UST'S,FUEL DISPENSERS,DISPENSING ISLAND & ASSOCIATED PIPING
B00620194-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offGEMSTAR CONSTRUCTION CORP.07/17/2023
DOB NOWStructuralSigned-offGEMSTAR CONSTRUCTION CORP.07/06/2023
1 project · most recent 07/25/2023
General Wiring
FiledStatusContractorScope
07/25/2023CompleteP & M ELECT'L CONTR. CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/21/2023Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
08/21/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/21/2023Subgrade InspectionsGEORGE GHEBRYALspecial
08/21/2023Post-installed AnchorsGEORGE GHEBRYALspecial
08/21/2023FinalGEORGE GHEBRYALprogress
08/21/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
08/21/2023Maintenance informationGEORGE GHEBRYALenergy_progress
08/04/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/04/2023Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
08/04/2023Post-installed AnchorsGEORGE GHEBRYALspecial
08/04/2023Subgrade InspectionsGEORGE GHEBRYALspecial
08/04/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
08/04/2023FinalGEORGE GHEBRYALprogress
08/04/2023Maintenance informationGEORGE GHEBRYALenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Dep Brooklyn Repair YardOther—
Project B00898202 Alteration · LOC Issued · 07/12/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00620194-I1Request digital key ↗
08/31/2026B00620194-P2Request digital key ↗
08/31/2026B00620194-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00620194-I1Open ↗
08/31/2026B00620194-P2Open ↗
08/31/2026B00620194-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026B00620194-P2Open ↗
08/24/2026B00620194-P2Open ↗
08/23/2026B00620194-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B00620194-P2Open ↗
08/23/2026B00620194-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00620194-P2Open ↗
08/31/2026B00620194-P1Open ↗
08/31/2026B00620194-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00620194-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/31/2026B00620194-I1Open ↗
08/31/2026B00620194-P2Open ↗
08/31/2026B00620194-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00620194-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00898202-I1Open ↗