← Back
BROOKLYN
903 EAST 93 STREET
BROOKLYN · Canarsie · BIN 3429064
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 2 docs
Attic83p · 2 filings · 20 docs
Floor 2Under Construction96p · 4 filings · 20 docs
Floor 1Under Construction95p · 5 filings · 20 docs
CellarUnder Construction85p · 4 filings · 20 docs
Site & exteriorUnder Construction5p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
73 AVE4209/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME ZONE BUILDING CONSULTING406/16/2026
L & C ASSOCIATES603/30/2026
L&C ASSOCIATES108/07/2023
YAN ENGINEERING PLLC206/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W.JAKE CONSTRUCTION CORPGeneral Contractor1607/08/2026
ARKENSTONE BUILDERS INCGeneral Contractor207/08/2026
PLBG P & H INCPlumbing207/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252606/16/2026
M. INT'L ENGINEERING PLLC3129311/12/2024
Building Lifecycle
All (94)Filed (13)Permit Issued (15)Signed Off (6)Violation (2)Inspection (7)Objection (21)Special Inspection (30)
07/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/01/2026
Permit issued — Sprinklers
B01417933-I1-EW-SP
06/16/2026
Filed — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT 2-FAMILY 2-STORY WITH CELLAR & ATTIC RESIDENTIAL BUILDING, IN CONJUNCTION WITH NB JOB# B00656077
B01417933-I1
06/16/2026
Special inspection requirement — Sprinkler Systems
INDARDEO PARBHUNATH
04/17/2026
Signed off — Alteration
PROPOSED ONE 7'-0" CURB CUT WITH TWO 1'-6" SPLAYS (TOTAL OF 10 FEET), LOCATED ON THE EAST SIDE OF EAST 93RD STREET, THE DISTANCE IS 454.50' SOUTH OF THE CORNER FORMED BY AVENUE D & EAST 93RD STREET.
B00895214-I1
04/17/2026
Objection raised — Fire_Protection
04/16/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/01/2026
Permit issued — Curb Cut
B00895214-I1-CC
03/30/2026
Filed — New Building
ERECT NEW 2-STORY, TWO (2) FAMILY RESIDENTIAL BUILDING WITH CELLAR & ATTIC. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00656077-P5
02/20/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #B00656077-I1 TO ERECT NEW TWO (2) STORY, TWO (2) FAMILY RESIDENTIAL BUILDING WITH CELLAR & ATTIC.
B00683732-I1
02/17/2026
Signed off — Alteration
PROPOSED MECHANICAL SYSTEMS FOR THE PROPOSAL OF A NEW TWO-STORY WITH ATTIC RESIDENTIAL BUILDING
B08046022-I1
12/29/2025
Signed off — New Building
ERECT NEW 2-STORY, TWO (2) FAMILY RESIDENTIAL BUILDING WITH CELLAR & ATTIC. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00656077-S2
12/29/2025
Signed off — New Building
ERECT NEW 2-STORY, TWO (2) FAMILY RESIDENTIAL BUILDING WITH CELLAR & ATTIC. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00656077-S1
12/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2025
Permit issued — General Construction
B00656077-I1-GC
09/25/2025
Objection resolved — Addressed
04/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2025
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
01/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
01/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
01/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
01/22/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #B00656077-I1 TO ERECT NEW TWO (2) STORY, TWO (2) FAMILY RESIDENTIAL BUILDING WITH CELLAR & ATTIC.
B00683732-P1
01/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
01/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
01/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
12/09/2024
Permit issued — Plumbing
B00683732-I1-PL
12/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2024
Objection raised — Energy
11/12/2024
Filed — New Building
ERECT NEW 2-STORY, TWO (2) FAMILY RESIDENTIAL BUILDING WITH CELLAR & ATTIC. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00656077-P4
10/28/2024
Signed off — Alteration
B07995017-I1
10/24/2024
Permit issued — Earth Work
B00656077-S1-FO-EA
08/23/2024
Permit issued — Structural
B00656077-S2-ST
08/23/2024
Permit issued — General Construction
B00656077-I1-GC
08/23/2024
Permit issued — Construction Fence
B07995017-I1-FN
07/10/2024
Permit issued — Mechanical Systems
B08046022-I1-MS
06/05/2024
Permit issued — Structural
B00656077-S2-ST
03/08/2024
Permit issued — General Construction
B00656077-I1-GC
01/31/2024
Permit issued — Construction Fence
B07995017-I1-FN
01/30/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/11/2023
Filed — New Building
ERECT NEW 2-STORY, TWO (2) FAMILY RESIDENTIAL BUILDING WITH CELLAR & ATTIC. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B00656077-P2
12/11/2023
Special inspection requirement — Fenestration areas
NANIK MASSAND
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
12/11/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
NANIK MASSAND
12/11/2023
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
12/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
NANIK MASSAND
12/11/2023
Special inspection requirement — Air barrier - visual inspection
NANIK MASSAND
12/11/2023
Special inspection requirement — Lighting in dwelling units
NANIK MASSAND
12/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
12/11/2023
Special inspection requirement — Lighting controls
NANIK MASSAND
12/11/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
NANIK MASSAND
12/11/2023
Special inspection requirement — Exterior lighting power
NANIK MASSAND
12/11/2023
Special inspection requirement — Interior lighting power
NANIK MASSAND
12/11/2023
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
12/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
12/11/2023
Special inspection requirement — Maintenance information
NANIK MASSAND
12/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
12/11/2023
Special inspection requirement — Metering
NANIK MASSAND
12/11/2023
Special inspection requirement — Electric vehicle service equipment requirements
NANIK MASSAND
12/11/2023
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedBRUCHE MECHANICAL NY LLC07/01/2026
DOB NOWCurb CutSigned-offARKENSTONE BUILDERS INC04/01/2026
DOB NOWGeneral ConstructionPermit IssuedARKENSTONE BUILDERS INC09/30/2025
DOB NOWPlumbingSigned-offPLBG P & H INC12/09/2024
DOB NOWEarth WorkSigned-offW.JAKE CONSTRUCTION CORP10/24/2024
DOB NOWStructuralSigned-offW.JAKE CONSTRUCTION CORP08/23/2024
DOB NOWGeneral ConstructionPermit IssuedW.JAKE CONSTRUCTION CORP08/23/2024
DOB NOWConstruction FenceSigned-offW.JAKE CONSTRUCTION CORP08/23/2024
DOB NOWMechanical SystemsSigned-offW.JAKE CONSTRUCTION CORP07/10/2024
DOB NOWStructuralSigned-offW.JAKE CONSTRUCTION CORP06/05/2024
DOB NOWGeneral ConstructionPermit IssuedW.JAKE CONSTRUCTION CORP03/08/2024
DOB NOWConstruction FenceSigned-offW.JAKE CONSTRUCTION CORP01/31/2024
DOB NOWPlumbingSigned-offPLBG P & H INC04/05/2023
DOB NOWGeneral ConstructionPermit IssuedW.JAKE CONSTRUCTION CORP03/17/2023
DOB NOWConstruction FenceSigned-offW.JAKE CONSTRUCTION CORP02/22/2023
1 project · most recent 06/16/2026
FiledStatusContractorScope
06/16/2026Permit IssuedPLBG P & H INC45 heads
1 project · most recent 03/05/2024
General Wiring Lighting
FiledStatusContractorScope
03/05/2024CompleteBDS ELECTRIC CORP.General Wiring, Lighting
1 project · most recent 03/30/2026
Steel
FiledStatusContractorScope
03/30/2026Permit IssuedARKENSTONE BUILDERS INCSteel
1 project · most recent 03/30/2026
Earthwork
FiledStatusContractorScope
03/30/2026Permit IssuedARKENSTONE BUILDERS INCEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2024Pass-Final PL - UndergroundPassView ↗
11/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
06/16/2026Sprinkler SystemsINDARDEO PARBHUNATHspecial
01/23/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
01/23/2025HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
01/23/2025HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
01/23/2025HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
01/13/2025HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
01/13/2025HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
01/13/2025HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
01/13/2025Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
12/11/2023Fenestration areasNANIK MASSANDenergy_progress
12/11/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
12/11/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNANIK MASSANDspecial
12/11/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
12/11/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
12/11/2023Air barrier - visual inspectionNANIK MASSANDenergy_progress
12/11/2023Lighting in dwelling unitsNANIK MASSANDenergy_progress
12/11/2023HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
12/11/2023Lighting controlsNANIK MASSANDenergy_progress
12/11/2023Fenestration and door U-factor and product ratingsNANIK MASSANDenergy_progress
12/11/2023Exterior lighting powerNANIK MASSANDenergy_progress
12/11/2023Interior lighting powerNANIK MASSANDenergy_progress
12/11/2023Insulation placement and R valuesNANIK MASSANDenergy_progress
12/11/2023HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
12/11/2023Maintenance informationNANIK MASSANDenergy_progress
12/11/2023HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
Latest 25 of 55.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/29/2026B00683732-I1Request digital key ↗
08/29/2026B00683732-P1Request digital key ↗
08/28/2026B07995017-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
08/28/2023340842093Open ↗
07/22/2022340842093Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/22/2022340842093Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/15/2026B00656077-P5Open ↗
08/13/2026B00656077-P4Open ↗
08/13/2026B00656077-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/15/2026B00656077-P5Open ↗
08/13/2026B00656077-P2Open ↗
08/13/2026B00656077-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00656077-I1Open ↗
▸Seals & Professional Certifications64
▸DOB NOWProgress Inspector Seal & Signature41
09/01/2026B00656077-S1Open ↗
09/01/2026B00656077-S1Open ↗
08/31/2026B00656077-P1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026B00683732-I1Open ↗
08/29/2026B00683732-P1Open ↗
08/28/2026B07995017-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00656077-S1Open ↗
09/01/2026B00656077-S1Open ↗
08/31/2026B00656077-P1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/22/2022340842093Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/22/2022340842093Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00656077-P2Open ↗
08/13/2026B00656077-P1Open ↗
08/13/2026B00656077-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/17/2026B00656077-P2Open ↗
08/15/2026B00656077-P5Open ↗
08/15/2026B00656077-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
06/16/2023340842093Open ↗
07/22/2022340842093Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/16/2023340842093Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00656077-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00656077-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00656077-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/29/2026B00683732-I1Open ↗
08/13/2026B00656077-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00656077-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00656077-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00656077-S1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
08/28/2023340842093Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/22/2022340842093Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/22/2022340842093Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial5
08/15/2026B00656077-P5Open ↗
08/13/2026B00656077-P4Open ↗
08/13/2026B00656077-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/15/2026B00656077-P5Open ↗
08/13/2026B00656077-P1Open ↗
08/13/2026B00656077-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/17/2026B00656077-P2Open ↗
08/15/2026B00656077-P5Open ↗
08/15/2026B00656077-P1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
06/16/2023340842093Open ↗
04/13/2023340842093Open ↗
04/13/2023340842093Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00656077-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00656077-S1Open ↗