← Back
BuildNYC
Condo, residential unit in elevator building
Samson Mgt. 220 W. 93 St Condominium
905 WEST END AVENUE · BIN 1057215
💬 Discuss this project
1916Year Built
13Stories
R4Building Class
R8Zoning
101,838 sfGross Floor Area
53Units
LL97 CoveredRent Stabilized83 Active Violations ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: 905 West End Ave Associates · 11,606 sf lot · 8.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects1 filing
RoofFacade brick replacementUnder Construction1p · 2 filings · 14 docs
Floor 5Unit 524p · 4 filings
Floor 4
Floor 3
Floor 2Unit 22Under Construction2p · 3 filings · 15 docs
Floor 1Unit 1142p · 1 filing
Site & exteriorInterior Masters Group of NYUnder Construction4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
905 West End Ave Associates5003/21/2026
Mike1607/08/2026
John B. Lovett & Associates1407/08/2026
905 West End Avenue Condminium1403/21/2026
Samson Management 220 W 93 St Condo1003/21/2026
905 Wea Condominium103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CES Engineering208/01/2025
Erik Schultz Architecture107/31/2025
Costa Arch & Engineering1207/16/2025
Lawless & Mangione105/28/2025
Jack Green Associates503/25/2025
Rigid Structural Design109/09/2024
Ozaeta Engineering204/27/2022
Baileys Engineering101/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Costa2803/21/2026
AM Expediting503/21/2026
Rigid Structural Design203/21/2026
Rizzo Group303/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Euro Group Design GroupGeneral Contractor607/08/2026
Millenium RestorationScaffold509/09/2026
Pepaj ConstructionGeneral Contractor404/09/2026
Intersystems Installation S&SScaffold303/21/2026
Millenium Restorationspecialty_contractor304/09/2026
George BassolinoPlumbing303/21/2026
Master Tech PlumbingPlumbing209/15/2026
Bayside Refrigerationspecialty_contractor203/21/2026
Powers Bridging & ScaffoldingScaffold203/21/2026
G.bassolino PlumbingPlumbing207/08/2026
Impact PlumbingPlumbing207/08/2026
Glendale Electl ContngElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423308/01/2025
Costa Architects & Engineering13211007/16/2025
United Engineering of NY9157107/14/2025
Special Testing & Consulting1688205/28/2025
Jack Green Associates422303/25/2025
Delta Testing Labs687204/27/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2026
Permit renewed — Plumbing
Renewed without changes
M01235404-I1-PL
09/08/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M01253859-I1-SH
07/15/2026
Boiler inspection report filed
Initial · no defects · Accepted
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMaster Tech Plumbing09/14/2026
DOB NOWSidewalk ShedPermit IssuedMillenium Restoration09/08/2026
DOB NOWSidewalk ShedPermit IssuedMillenium Restoration05/21/2026
DOB NOWGeneral ConstructionPermit IssuedPepaj Construction03/25/2026
DOB NOWMechanical SystemsPermit IssuedPepaj Construction03/25/2026
DOB NOWSidewalk ShedPermit IssuedMillenium Restoration02/24/2026
DOB NOWGeneral ConstructionPermit IssuedMillenium Restoration02/24/2026
DOB NOWSidewalk ShedPermit IssuedMillenium Restoration02/13/2026
DOB NOWSuspended ScaffoldPermit IssuedMillenium Restoration01/20/2026
DOB NOWGeneral ConstructionPermit IssuedMillenium Restoration01/12/2026
DOB NOWPlumbingSigned-offG.bassolino Plumbing10/24/2025
DOB NOWPlumbingPermit IssuedMaster Tech Plumbing10/10/2025
DOB NOWMechanical SystemsPermit IssuedPepaj Construction10/08/2025
DOB NOWGeneral ConstructionPermit IssuedPepaj Construction10/07/2025
DOB NOWSuspended ScaffoldPermit IssuedMillenium Restoration08/08/2025
DOB NOWGeneral ConstructionPermit IssuedMillenium Restoration08/08/2025
DOB NOWSidewalk ShedPermit IssuedMillenium Restoration08/07/2025
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group02/10/2025
DOB NOWPlumbingSigned-offImpact Plumbing02/07/2025
DOB NOWPlumbingSigned-offG.bassolino Plumbing09/23/2024
DOB NOWSuspended ScaffoldPermit IssuedJepol Construction09/16/2024
DOB NOWSidewalk ShedSigned-offIntersystems Installation S&S09/10/2024
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group11/29/2022
DOB NOWStructuralPermit IssuedEuro Group Design Group04/29/2022
DOB NOWMechanical SystemsSigned-offBayside Refrigeration02/22/2022
DOB NOWPlumbingSigned-offImpact Plumbing01/13/2022
DOB NOWGeneral ConstructionSigned-offEuro Group Design Group01/03/2022
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol01/09/2019
BIS—ISSUEDJepol Construction11/27/2018
BISPLISSUEDOrbit Plumbing & Heating08/02/2018
BISMHISSUEDInterior Masters Group07/24/2018
BISOTISSUEDJepol Construction02/01/2018
BISOTISSUEDJepol Construction05/02/2017
BISOTISSUEDJepol Construction01/30/2017
BISEQISSUEDIntersystem S&S01/17/2017
BISEQISSUEDShallu Construction01/11/2017
BISOTISSUEDEuro Group Design Group11/23/2016
BISPLISSUEDAbr Plumbing & Heating Contracting10/24/2016
BISOTISSUEDEuro Group Design Group10/18/2016
BISOTISSUEDJepol Construction02/01/2016
+ 38 more permits on file
9 projects · most recent 10/09/2025
General Wiring Lighting
FiledStatusContractorScope
10/09/2025Permit IssuedGramercy ElectricGeneral Wiring
08/26/2025Permit IssuedBorowide Elect'l Contractors—
02/10/2025CompleteVlashava Electric Contracting—
09/10/2024CompleteAurora Electrical Contg—
01/11/2022CompleteVlashava Electric Contracting—
11/23/2021CompleteMidland ElectricalGeneral Wiring
10/04/2021CompleteDenmar ElectricGeneral Wiring
02/26/2019CompleteGlendale Electl ContngGeneral Wiring, Lighting
01/07/2019CompleteOptimal Electric—
1 project · most recent 11/13/2025
Sidewalk Shed
FiledStatusContractorScope
11/13/2025Permit IssuedMillenium RestorationSidewalk Shed
1 project · most recent 07/14/2025
Suspended Scaffold
FiledStatusContractorScope
07/14/2025Permit IssuedMillenium RestorationSuspended Scaffold
1 project · most recent 07/14/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/14/2025Permit IssuedMillenium RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
07/31/2025Lighting controlsYoung Suhenergy_progress
07/31/2025Lighting in dwelling unitsYoung Suhenergy_progress
07/16/2025FinalANGELO COSTAprogress
07/16/2025Fire-Resistant Penetrations and JointsANGELO COSTAspecial
07/16/2025Energy Code Compliance InspectionsANGELO COSTAprogress
07/11/2025Alternative Materials - OTCR Buildings Bulletin NumberVIVEK PATELspecial
07/11/2025Post-installed AnchorsVIVEK PATELspecial
06/03/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
06/03/2025FinalERIK SCHULTZprogress
05/21/2025Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
05/21/2025FinalWilliam Struthprogress
05/21/2025Energy Code Compliance InspectionsWilliam Struthprogress
05/21/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
05/21/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
05/21/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
01/29/2025Tenant Protection Plan Compliance—special
01/29/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
11/04/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
11/04/2024Tenant Protection Plan Compliance—special
02/02/2023FinalPaul Antonioprogress
02/02/2023Fire-Resistant Penetrations and JointsPaul Antoniospecial
02/02/2023Mechanical SystemsPaul Antoniospecial
01/30/2023FinalPaul Antonioprogress
01/30/2023FinalANGELO COSTAprogress
01/30/2023Fire-Resistance Rated ConstructionANGELO COSTAprogress
Latest 25 of 46.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Interior Masters Group of NYOther—
Project M00115639 Alteration · LOC Issued · 01/08/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
1,086 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account