907 5TH AVENUE
MANHATTAN · BIN 1041378
💬 Discuss this project
1915Year Built
12Stories
D4Building Class
R10Zoning
147,257 sfGross Floor Area
74Units
LL97 CoveredRent Stabilized6 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 907 Corporation C/O Brown Harris Stevens · 14,375 sf lot · 10.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSwing stage scaffolding1p · 1 filing · 10 docs
Floor 12Unit 12WUnder Construction8p · 1 filing · 16 docs
Floor 11
Floor 10Unit 10B11p · 1 filing · 20 docs
Floor 9
Floor 8
Floor 7
Floor 6Unit 6B, Unit 6AD, Unit 6ADC35p · 5 filings · 20 docs
Floor 5Unit 5E23p · 1 filing · 20 docs
Floor 4Unit 4B39p · 4 filings · 20 docs
Floor 3Unit 3A, Unit 3F, Unit 3AF22p · 3 filings · 20 docs
Floor 2
Floor 1
Site & exteriorSidewalk shed installation21p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
907 Associates7003/22/2026
907 Fifth Ave1103/21/2026
907 Corp-Brown Harris Stevens1010/13/2026
LZ Trust503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ndkazalas Architecture1303/21/2026
Mike Warshaw Architect303/21/2026
Anthony Morali Architect1603/21/2026
A+ Expediting803/21/2026
Synergy Building Consultants203/21/2026
Rigid Structural Design303/21/2026
Oculus Consulting Group303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dutchman ContractingGeneral Contractor907/02/2026
West New York Restoration of CTScaffold607/08/2026
NY Construction & StoneGeneral Contractor603/21/2026
V. Disalvo Contracting CoGeneral Contractor607/08/2026
John Petrocelli ConstructionGeneral Contractor307/08/2026
Premier Flow Plumbing and HeatingPlumbing207/08/2026
M Construction NYCGeneral Contractor206/28/2026
Renovation by MY HomeGeneral Contractor207/08/2026
West New York Restoration of CTspecialty_contractor206/28/2026
Aqueduct MechanicalPlumbing207/08/2026
G.P. MechanicalPlumbing207/08/2026
Impact PlumbingPlumbing207/08/2026
Eco Electrical ServcsElectrical103/21/2026
BK Plumbing & Heating CoPlumbing107/08/2026
Budget Plumbing & HeatingPlumbing106/28/2026
M Construction NYGeneral Contractor107/08/2026
Five Star P and H CoPlumbing107/08/2026
Highline Construction GRGeneral Contractor109/13/2026
Forte Express P & HPlumbing109/19/2026
Empire Lic Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Integrity Consulting Service666209/04/2026
Jock Deboer, AIA - Sia7008207/16/2026
Bendix Engineering4293607/16/2026
Concrete Solutions Lab Co5344401/09/2026
Charles G Michel Engineering2871210/15/2025
Anthony Morali Architect4810807/31/2025
KZ Engineering4665204/29/2025
Seth P Roye Architect8554104/17/2024
Sag Engineering & Consulting608104/17/2024
Nicholas A Cichanowski AR8516301/24/2024
Mike Warshaw Architect PL6360112/13/2022
Christian L. Martos Engineering5965112/13/2022
Ryan Special Engineering2018203/09/2021
Quality Testing7344308/26/2020
Building Lifecycle
All (270)Filed (42)Permit Issued (42)Signed Off (19)Facade (FISP) (15)Violation (60)Inspection (16)Objection (46)Special Inspection (30)
09/29/2026
Signed off — Alteration
Formally filing plumbing work associated with alteration type II for interior renovation to Apt. 4B. No change in Use, Occupancy, or Egress under this application.
M01054589-I1
09/29/2026
Signed off — Alteration
Formally filing plumbing work associated with alteration type II for interior renovation to Apt. 4B. No change in Use, Occupancy, or Egress under this application.
M01054589-S2
09/29/2026
Signed off — Alteration
Formally filing plumbing work associated with alteration type II for interior renovation to Apt. 4B. No change in Use, Occupancy, or Egress under this application.
M01054589-S1
09/18/2026
Permit issued — Plumbing
M01397473-S1-PL
09/09/2026
Filed — Alteration
Minor interior renovation of the 12th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use egress or occupancy.
M01397473-S1
09/04/2026
Filed — Alteration
Minor interior renovation of the 12th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use egress or occupancy.
M01397473-P1
09/03/2026
Signed off — Alteration
Mechanical filing in conjunction with I1 for construction
M01038750-I1
09/03/2026
Signed off — Alteration
Mechanical filing in conjunction with I1 for construction
M01038750-S2
09/03/2026
Signed off — Alteration
Mechanical filing in conjunction with I1 for construction
M01038750-S1
09/01/2026
Permit issued — General Construction
M01397473-I1-GC
08/31/2026
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
08/31/2026
Special inspection requirement — Final
DANIEL ROMUALDEZ
07/16/2026
Filed — Alteration
Mechanical filing in conjunction with I1 for construction
M01038750-P4
07/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Matthew Bendix
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
07/14/2026
Special inspection requirement — Lighting in dwelling units
Matthew Bendix
07/14/2026
Special inspection requirement — Insulation placement and R values
Jock deBoer
07/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Bendix
07/14/2026
Special inspection requirement — Lighting controls
Matthew Bendix
07/14/2026
Special inspection requirement — Post-installed Anchors
Jock deBoer
07/14/2026
Special inspection requirement — Final
Matthew Bendix
07/09/2026
Objection resolved — Addressed
07/08/2026
Objection raised — Scope
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Bendix
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Matthew Bendix
06/30/2026
Permit issued — General Construction
M01054589-I1-GC
06/25/2026
Filed — Alteration
Mechanical filing in conjunction with I1 for construction
M01038750-P3
06/03/2026
Filed — Alteration
Minor interior renovation of the 12th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use egress or occupancy.
M01397473-I1
05/11/2026
Permit issued — General Construction
M01245297-I1-GC
05/11/2026
Permit issued — Mechanical Systems
M01245297-S2-MS
05/07/2026
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
05/05/2026
Special inspection requirement — Final
DANIEL ROMUALDEZ
03/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Scope
01/21/2026
Permit issued — Mechanical Systems
M01054589-S2-MS
01/15/2026
Permit issued — Mechanical Systems
M01054589-S2-MS
01/14/2026
Permit issued — General Construction
M01054589-I1-GC
01/09/2026
Filed — Alteration
Formally filing plumbing work associated with alteration type II for interior renovation to Apt. 4B. No change in Use, Occupancy, or Egress under this application.
M01054589-P2
01/09/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
01/09/2026
Special inspection requirement — Fenestration areas
MINA HANNA
01/09/2026
Special inspection requirement — Interior lighting power
MINA HANNA
01/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
01/09/2026
Special inspection requirement — Final
MINA HANNA
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
01/09/2026
Special inspection requirement — Lighting controls
MINA HANNA
12/08/2025
Signed off — Alteration
Plumbing fixture work at existing residential unit 6ADC. No change to use egress or occupancy under this filing.
M01070404-S1
12/08/2025
Signed off — Alteration
M01034280-I1
12/08/2025
Signed off — Alteration
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01034416-I1
12/08/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01034398-I1
12/05/2025
Signed off — Alteration
Plumbing fixture work at existing residential unit 6ADC. No change to use egress or occupancy under this filing.
M01070404-I1
11/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/15/2025
Filed — Alteration
Interior renovation to install new air conditioning systems to serve the residence and revision to the existing steam radiators. No change to egress, occupancy, or use.
M01245297-S1
10/15/2025
Filed — Alteration
Interior renovation to install new air conditioning systems to serve the residence and revision to the existing steam radiators. No change to egress, occupancy, or use.
M01245297-S2
Latest 60 of 270 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedForte Express P & H09/18/2026
DOB NOWGeneral ConstructionPermit IssuedHighline Construction GR09/01/2026
DOB NOWGeneral ConstructionSigned-offDutchman Contracting06/30/2026
DOB NOWGeneral ConstructionPermit IssuedM Construction NYC05/11/2026
DOB NOWMechanical SystemsPermit IssuedM Construction NYC05/11/2026
DOB NOWMechanical SystemsSigned-offDutchman Contracting01/21/2026
DOB NOWMechanical SystemsSigned-offDutchman Contracting01/15/2026
DOB NOWGeneral ConstructionSigned-offDutchman Contracting01/14/2026
DOB NOWMechanical SystemsSigned-offRenovation by MY Home07/28/2025
DOB NOWGeneral ConstructionSigned-offRenovation by MY Home07/28/2025
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction07/23/2025
DOB NOWPlumbingSigned-offBudget Plumbing & Heating07/22/2025
DOB NOWProtection and Mechanical MethodsSigned-offA. Peter Luger Construction07/21/2025
DOB NOWSupported ScaffoldSigned-offA. Peter Luger Construction07/21/2025
DOB NOWGeneral ConstructionPermit IssuedA. Peter Luger Construction07/18/2025
DOB NOWPlumbingSigned-offAqueduct Mechanical05/06/2025
DOB NOWSuspended ScaffoldPermit IssuedWest New York Restoration05/05/2025
DOB NOWMechanical SystemsSigned-offDutchman Contracting05/05/2025
DOB NOWPlumbingSigned-offFive Star P and H Co04/30/2025
DOB NOWGeneral ConstructionSigned-offJohn Petrocelli Construction04/21/2025
DOB NOWGeneral ConstructionSigned-offDutchman Contracting04/15/2025
DOB NOWGeneral ConstructionSigned-offDutchman Contracting04/14/2025
DOB NOWGeneral ConstructionPermit IssuedA. Peter Luger Construction08/12/2024
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction08/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offA. Peter Luger Construction08/02/2024
DOB NOWSupported ScaffoldSigned-offA. Peter Luger Construction08/02/2024
DOB NOWSuspended ScaffoldPermit IssuedWest New York Restoration05/10/2024
DOB NOWPlumbingSigned-offG.P. Mechanical07/28/2023
DOB NOWPlumbingSigned-offG.P. Mechanical03/31/2023
DOB NOWGeneral ConstructionSigned-offNY Construction & Stone03/13/2023
DOB NOWGeneral ConstructionSigned-offNY Construction & Stone03/11/2023
DOB NOWPlumbingSigned-offBK Plumbing & Heating Co04/07/2022
DOB NOWPlumbingSigned-offAqueduct Mechanical03/03/2022
DOB NOWGeneral ConstructionSigned-offJohn Petrocelli Construction02/08/2022
DOB NOWPlumbingSigned-offImpact Plumbing07/16/2021
DOB NOWMechanical SystemsSigned-offM Construction NY07/08/2021
DOB NOWMechanical SystemsSigned-offV. Disalvo Contracting Co06/21/2021
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating04/06/2021
DOB NOWMechanical SystemsSigned-offV. Disalvo Contracting Co02/24/2021
DOB NOWMechanical SystemsSigned-offV. Disalvo Contracting Co11/16/2020
+ 52 more permits on file
3 projects · most recent 07/16/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2026Signed-offRenovation by MY HomeHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ephoca ADP10R4L2 14,000 BTU · Heat Pump Outdoor ×3
Ventilation
Ephoca NA 100 CFM · Erv ×3
01/09/2026Signed-offDutchman ContractingAir Conditioning Systems
Cooling
Task TGC021TWEC-25K-3619-A 24,000 BTU · Condensing Unit ×1
TGC021TWEC-30K-3619-A 30,000 BTU · Condensing Unit ×1
10/15/2025Permit IssuedM Construction NYCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Friedrich WALLMASTER WCT10A30A 10,000 BTU · Ptac ×1
Heat / Cool
Islandaire EZ09A1RMG1N15AA 9,200 BTU · Ptac ×1
EZNY07A1GBF47AA 7,500 BTU · Ptac ×1
EZNY12A1GBF47AA 12,000 BTU · Ptac ×1
EZNY16A2GBF47AA 14,300 BTU · Ptac ×1
4 projects · most recent 09/09/2026
Water/Sanitary
FiledStatusContractorScope
09/09/2026Permit IssuedForte Express P & HWater/Sanitary
07/16/2026Signed-offBudget Plumbing & HeatingWater/Sanitary
01/09/2026Signed-offFive Star P and H CoWater/Sanitary
10/15/2025——Water/Sanitary
19 projects · most recent 07/22/2026
General Wiring Lighting
FiledStatusContractorScope
07/22/2026Permit IssuedArma ElectricGeneral Wiring
07/07/2026CompleteEmpire Lic Electrical ContractorsGeneral Wiring
04/30/2026CompleteOptimal Electric—
02/03/2026CompleteJumper ElectricGeneral Wiring
01/23/2026Permit IssuedEco Electrical ServcsGeneral Wiring, Lighting
11/03/2025CompleteOptimal Electric—
05/12/2025CompleteCresco ElectricalGeneral Wiring
04/25/2025CompleteGlendale Electl ContngGeneral Wiring
02/14/2025CompleteEmpire Lic Electrical ContractorsGeneral Wiring
01/27/2025CompleteGlendale Electl Contng—
04/30/2024CompleteNash Electric Services—
03/22/2023CompleteCSM Electric—
01/05/2023CompleteGanly ElectricalGeneral Wiring
07/07/2022CompleteE & M Electrical NYGeneral Wiring
12/07/2021CompleteR-2 ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
03/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 133
DateRequirementInspectorRole
08/31/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
08/31/2026Post-installed AnchorsALEKSANDR LEVINspecial
08/31/2026FinalDANIEL ROMUALDEZprogress
07/14/2026Lighting controlsMatthew Bendixenergy_progress
07/14/2026Lighting in dwelling unitsMatthew Bendixenergy_progress
07/14/2026Insulation placement and R valuesJock deBoerenergy_progress
07/14/2026Post-installed AnchorsJock deBoerspecial
07/14/2026Energy Code Compliance InspectionsMatthew Bendixprogress
07/14/2026Fire-Resistant Penetrations and JointsMatthew Bendixspecial
07/14/2026FinalMatthew Bendixprogress
07/14/2026Fire-Resistance Rated ConstructionMatthew Bendixprogress
07/02/2026Fire-Resistant Penetrations and JointsMatthew Bendixspecial
07/02/2026Energy Code Compliance InspectionsMatthew Bendixprogress
07/02/2026HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
05/07/2026Post-installed AnchorsALEKSANDR LEVINspecial
05/07/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
05/05/2026FinalDANIEL ROMUALDEZprogress
01/09/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
01/09/2026Fenestration air leakageMINA HANNAenergy_progress
01/09/2026Fenestration areasMINA HANNAenergy_progress
01/09/2026Interior lighting powerMINA HANNAenergy_progress
01/09/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
01/09/2026Energy Code Compliance InspectionsMINA HANNAprogress
01/09/2026FinalMINA HANNAprogress
01/09/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
Latest 25 of 133.
▾Documents — 1,190 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch35
09/04/2026M00478210-I1Request digital key ↗
09/04/2026M00478259-I1Request digital key ↗
09/03/2026M00625979-P3Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00290202-I1Request digital key ↗
08/15/2026M00290202-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00290270-I1Request digital key ↗
▸Applications & Permits218
▸BISPLAN / WORK APPROVAL APPLICATION94
08/18/2022123846035Open ↗
07/25/2022123846035Open ↗
02/13/2022123387968Open ↗
Showing 3 of 94 on file for this type
▸BISWORK PERMIT APPLICATION88
07/07/2021140984068Open ↗
03/25/2021140973613Open ↗
08/24/2020123846035Open ↗
Showing 3 of 88 on file for this type
▸DOB NOWLPC Approval/Permit35
09/15/2026M01397473-S1Open ↗
09/15/2026M01397473-P1Open ↗
09/04/2026M00478259-I1Open ↗
Showing 3 of 35 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications249
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION89
01/17/2020123846035Open ↗
10/30/2019123010589Open ↗
07/29/2019123103211Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWProgress Inspector Seal & Signature54
09/23/2026M01397473-P1Open ↗
09/23/2026M01245297-S2Open ↗
09/23/2026M01245297-S2Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/15/2026M01397473-S1Open ↗
09/05/2026M00290270-I1Open ↗
09/04/2026M00478259-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
10/08/2026M00626086-I1Open ↗
09/23/2026M01397473-P1Open ↗
09/23/2026M01245297-S2Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/02/2020140973613Open ↗
Showing 1 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
12/01/2020140984068Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/02/2020140973613Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/02/2020140973613Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment83
▸BISSELF-CERT PLUMBING NOTICE33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSCHEDULE B - PLUMBING27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
06/01/2018123364581Open ↗
03/22/2018123387968Open ↗
12/19/2017123203899Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION2
03/15/2019121059610Open ↗
Showing 1 of 2 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection75
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist36
09/15/2026M01397473-P1Open ↗
09/15/2026M01397473-S1Open ↗
09/04/2026M00478259-I1Open ↗
Showing 3 of 36 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST20
12/01/2020140984068Open ↗
11/02/2020140973613Open ↗
06/25/2018123364581Open ↗
Showing 3 of 20 on file for this type
▸BISTenant Protection Plan and Notes11
05/05/2020123846035Open ↗
06/01/2018123364581Open ↗
03/22/2018123387968Open ↗
Showing 3 of 11 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT3
05/05/2020123846035Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWTenant Protection Plan3
08/15/2026M00290270-I1Open ↗
Showing 1 of 3 on file for this type
▸BISHPD: CERTIFICATE OF NO HARASSMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos78
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/15/2026M01397473-P1Open ↗
09/15/2026M01397473-S1Open ↗
09/03/2026M00625979-P3Open ↗
Showing 3 of 26 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)23
11/02/2020140973613Open ↗
05/15/2020123846035Open ↗
05/05/2020123846035Open ↗
Showing 3 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/04/2026M00478259-I1Open ↗
08/21/2026M01245297-S2Open ↗
08/21/2026M01245297-S1Open ↗
Showing 3 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
07/05/2021140984068Open ↗
03/07/2018123203899Open ↗
▸Energy Compliance76
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS34
01/17/2020123846035Open ↗
07/26/2019122916354Open ↗
07/23/2018123203899Open ↗
Showing 3 of 34 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
01/19/2022140973613Open ↗
07/26/2019122916354Open ↗
07/23/2018123203899Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
01/19/2022140973613Open ↗
07/07/2021140984068Open ↗
03/25/2021140973613Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/20/2022123846035Open ↗
09/07/2022140984068Open ↗
▸BISLIGHTING CONTROLS2
09/20/2022123846035Open ↗
09/07/2022140984068Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/04/2026M00478259-I1Open ↗
08/15/2026M00625979-I1Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
06/01/2018123364581Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY10
01/19/2022140973613Open ↗
07/05/2021140984068Open ↗
03/15/2021140973613Open ↗
Showing 3 of 10 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
09/20/2022123846035Open ↗
09/07/2022140984068Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/07/2022140984068Open ↗
▸Approvals, Objections & Sign-offs135
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST55
09/26/2022123846035Open ↗
09/14/2022140984068Open ↗
01/20/2022140973613Open ↗
Showing 3 of 55 on file for this type
▸BISLANDMARKS APPROVAL40
03/10/2021140984068Open ↗
11/02/2020140973613Open ↗
05/05/2020123846035Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISLANDMARKS SIGNOFF3
09/21/2022123846035Open ↗
09/08/2022140984068Open ↗
01/20/2022140973613Open ↗
▸BISFINAL2
09/20/2022123846035Open ↗
09/13/2022140984068Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMaster Plumber Seal Temporary Approval Letter1
10/12/2018123364581Open ↗
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership73
▸BISCOST AFFIDAVIT68
08/08/2022123846035Open ↗
07/28/2022123846035Open ↗
07/25/2022123846035Open ↗
Showing 3 of 68 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/20/2022123846035Open ↗
09/13/2022140984068Open ↗
▸Filing & Intake Forms118
▸BISEFILING COVER SHEET43
05/05/2020123846035Open ↗
01/17/2020123846035Open ↗
06/01/2018123364581Open ↗
Showing 3 of 43 on file for this type
▸BISADDITIONAL INFORMATION39
03/15/2021140984068Open ↗
03/10/2021140984068Open ↗
05/15/2020123846035Open ↗
Showing 3 of 39 on file for this type
▸BISBOROUGH INTAKE FORM22
08/24/2020123846035Open ↗
08/24/2020123846035Open ↗
10/30/2019123010589Open ↗
Showing 3 of 22 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/01/2020140984068Open ↗
11/02/2020140973613Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00625979-P3Open ↗
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
08/24/2020123846035Open ↗
02/12/2019123364581Open ↗
Showing 2 of 7 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
09/28/2018123364581Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type