← Back
Walk-up apt, over six families with stores
908 COLUMBUS AVENUE
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1055921
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R8BZoning
20,818 sfGross Floor Area
18Units
Rent Stabilized66 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: HK BROWNSTONES LLC · 5,250 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Floor 514p · 2 filings · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 314p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST SIDE MANAGEMENT3007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGG ROTHSTEIN ARCHITECT1404/25/2025
ALBERT MONTOYA ARCHITECT106/18/2020
CONSULTING ENGINEERS COLLABORATIVE,104/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREGG ROTHSTEIN ARCHITECT303/21/2026
CSMR DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRUSCO CONTRACTING CORPGeneral Contractor2007/08/2026
OSSO PLUMBING & HEATINGPlumbing307/08/2026
APOLLO ELECTRIC NYG, INCElectrical103/22/2026
MKU ELECTRIC CORPElectrical103/22/2026
MACK SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING20181304/25/2025
GREGG ROTHSTEIN ARCHITECT195305/02/2022
Building Lifecycle
All (148)Filed (16)Permit Issued (16)Signed Off (10)Violation (60)Inspection (14)Objection (2)Special Inspection (30)
09/02/2026
Violation issued (HPD, open)
B
03/21/2026
Violation issued (HPD, closed)
B
03/21/2026
Violation issued (HPD, closed)
C
08/14/2025
Signed off — Alteration CO
Sever connection between southerly portion of cellar and southerly first floor store. Incorporate the severed portion of southerly cellar to northerly first floor and cellar store. New CO will be obtained.
M00708717-I1
06/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
05/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
05/06/2025
Special inspection requirement — Interior lighting power
William Ryan
05/06/2025
Special inspection requirement — Final
William Ryan
05/06/2025
Special inspection requirement — Structural Steel - Details
William Ryan
05/06/2025
Special inspection requirement — Concrete - Cast-In-Place
William Ryan
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
04/25/2025
Filed — Alteration CO
Sever connection between southerly portion of cellar and southerly first floor store. Incorporate the severed portion of southerly cellar to northerly first floor and cellar store. New CO will be obtained.
M00708717-A2
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
04/24/2025
Special inspection requirement — Interior lighting power
William Ryan
04/24/2025
Special inspection requirement — Final
William Ryan
04/24/2025
Special inspection requirement — Structural Steel - Details
William Ryan
04/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Ryan
04/24/2025
Special inspection requirement — Concrete - Cast-In-Place
William Ryan
01/28/2025
Signed off — Alteration
Alteration in Apt 3B on the 4th floor to remedy violation # 022094CNEDR02. No change in use, egress or occupancy.
M01114394-I1
01/12/2025
Violation issued (HPD, closed)
C
01/12/2025
Violation issued (HPD, open)
C
01/10/2025
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH REMOVE STAIR FROM HARDWARE STORE TO CELLAR AND CREATE EXAM ROOMS CONNECTED TO THE EXISTING MEDICAL OFFICES IN THE CELLAR.
M00711139-S1
12/20/2024
Signed off — Alteration
M00357924-I1
11/25/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/21/2024
Signed off — Alteration
REFILE BIS JOB # 104894937 REMODEL APTS 2A & 2C ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00715512-I1
11/21/2024
Signed off — Alteration
REFILE BIS JOB # 104894937 REMODEL APTS 2A & 2C ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00715512-S1
11/19/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/07/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/27/2024
Permit issued — General Construction
M01114394-I1-GC
09/23/2024
Filed — Alteration
Alteration in Apt 3B on the 4th floor to remedy violation # 022094CNEDR02. No change in use, egress or occupancy.
M01114394-I1
08/01/2024
Permit issued — General Construction
M00715512-I1-MS
07/31/2024
Permit issued — General Construction
M00715512-I1-GC
07/30/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH REMOVE STAIR FROM HARDWARE STORE TO CELLAR AND CREATE EXAM ROOMS CONNECTED TO THE EXISTING MEDICAL OFFICES IN THE CELLAR.
M00711139-I1
07/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2024
Violation issued (HPD, open)
A
05/09/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, closed)
C
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
B
02/28/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2024
Violation issued (HPD, closed)
B
01/17/2024
Violation issued (HPD, closed)
B
01/08/2024
Violation issued (HPD, closed)
B
01/08/2024
Violation issued (HPD, closed)
B
01/04/2024
Permit issued — Plumbing
M00715512-S1-PL
01/03/2024
Filed — Alteration CO
Sever connection between southerly portion of cellar and southerly first floor store. Incorporate the severed portion of southerly cellar to northerly first floor and cellar store. New CO will be obtained.
M00708717-A1
09/11/2023
Violation issued (HPD, open)
B
09/11/2023
Violation issued (HPD, open)
A
09/11/2023
Violation issued (HPD, open)
A
09/05/2023
Violation issued (HPD, open)
B
09/05/2023
Violation issued (HPD, open)
A
09/05/2023
Violation issued (HPD, open)
B
09/05/2023
Violation issued (HPD, open)
A
09/04/2023
Violation issued (HPD, open)
B
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBRUSCO CONTRACTING CORP09/27/2024
DOB NOWGeneral ConstructionSigned-offBRUSCO CONTRACTING CORP08/01/2024
DOB NOWGeneral ConstructionSigned-offBRUSCO CONTRACTING CORP07/31/2024
DOB NOWPlumbingSigned-offOSSO PLUMBING & HEATING01/04/2024
DOB NOWMechanical SystemsSigned-offBRUSCO CONTRACTING CORP07/08/2022
DOB NOWStructuralSigned-offBRUSCO CONTRACTING CORP07/08/2022
DOB NOWGeneral ConstructionPermit IssuedBRUSCO CONTRACTING CORP07/08/2022
DOB NOWPlumbingSigned-offOSSO PLUMBING & HEATING05/17/2022
DOB NOWMechanical SystemsSigned-offBRUSCO CONTRACTING CORP04/18/2022
DOB NOWPlumbingSigned-offOSSO PLUMBING & HEATING04/13/2022
DOB NOWGeneral ConstructionSigned-offBRUSCO CONTRACTING CORP04/11/2022
DOB NOWGeneral ConstructionPermit IssuedBRUSCO CONTRACTING CORP04/11/2022
DOB NOWSignSigned-offMACK SIGNS & AWNINGS INC07/30/2020
DOB NOWMechanical SystemsSigned-offBRUSCO CONTRACTING CORP04/21/2020
DOB NOWStructuralSigned-offBRUSCO CONTRACTING CORP04/21/2020
DOB NOWConstruction FenceSigned-offBRUSCO CONTRACTING CORP04/20/2020
BISOTISSUEDBRUSCO CONTRACTING CORP04/24/2024
BISMHISSUEDBRUSCO CONTRACTING CORP04/24/2024
BISOTISSUEDBRUSCO CONTRACTING CORP05/05/2020
BISPLISSUEDOSSO PLUMBING & HEATING01/27/2020
BISOTISSUEDBRUSCO CONTRACTING CORP10/04/2019
BISOTISSUEDBRUSCO CONTRACTING CORP05/30/2019
BISFPISSUEDFIRE COMMAND CO, INC08/18/2014
BISMHISSUEDBRUSCO CONTRACTING CORP05/08/2008
BISPLISSUEDCOD PLUMBING CORP04/24/2008
BISOTISSUEDBRUSCO CONTRACTING CORP01/18/2008
BISPLISSUEDCOD PLUMBING CORP01/15/2008
BISOTISSUEDBRUSCO CONTRACTING CORP09/26/2007
BISPLISSUEDEMPIRE STATE PLBG & HTG C02/03/2005
BISBLISSUEDJACK PICCINI, INC02/03/2005
BISPLISSUEDPF PLUMB HEAT.04/23/2004
BISOTISSUEDBRUSCO CONTRACTING CORP03/22/2004
BISOTISSUEDBRUSCO CONTRACTING CORP01/28/2004
BISFPISSUEDFIRE FOE SYSTEM CORP07/18/2003
BISOTRE-ISSUEDBRUSCO CONTRACTING CORP03/19/2002
BISPLISSUEDJOE PARZIALE PLUMBING CO07/09/2001
BISOTISSUEDBSM ENTER INC.06/20/2001
11 projects · most recent 04/26/2024
General Wiring
FiledStatusContractorScope
04/26/2024CompleteMKU ELECTRIC CORPGeneral Wiring
04/15/2024CompleteMKU ELECTRIC CORPGeneral Wiring
04/14/2024CompleteMKU ELECTRIC CORPGeneral Wiring
04/14/2024CompleteMKU ELECTRIC CORPGeneral Wiring
02/26/2024CompleteMKU ELECTRIC CORPGeneral Wiring
04/20/2022CompleteMKU ELECTRIC CORPGeneral Wiring
12/21/2021CompleteMKU ELECTRIC CORPGeneral Wiring
05/19/2020CompleteR.C.M. ELECTRIC CORP.—
03/13/2020CompleteAPOLLO ELECTRIC NYG, INCGeneral Wiring
01/23/2020CompleteTIMOTHY COLEMAN LICENSED—
11/04/2019CompleteSEABRAVE ELECTRIC CORP10 meters
1 project · most recent 04/25/2025
Steel Concrete
FiledStatusContractorScope
04/25/2025Permit IssuedBRUSCO CONTRACTING CORPSteel, Concrete
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
06/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/25/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/19/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
06/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
05/06/2025Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
05/06/2025Interior lighting powerWilliam Ryanenergy_progress
05/06/2025FinalWilliam Ryanprogress
05/06/2025Structural Steel - DetailsWilliam Ryanspecial
05/06/2025Concrete - Cast-In-PlaceWilliam Ryanspecial
05/06/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
04/24/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
04/24/2025Interior lighting powerWilliam Ryanenergy_progress
04/24/2025FinalWilliam Ryanprogress
04/24/2025Structural Steel - DetailsWilliam Ryanspecial
04/24/2025Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
04/24/2025Concrete - Cast-In-PlaceWilliam Ryanspecial
08/11/2022Interior lighting powerWilliam Ryanenergy_progress
08/11/2022Concrete - Cast-In-PlaceWilliam Ryanspecial
08/11/2022Fire-Resistant Penetrations and JointsWilliam Ryanspecial
08/11/2022Structural Stability – Alterations of existing buildingsWilliam Ryanspecial
08/11/2022Structural Steel - DetailsWilliam Ryanspecial
08/11/2022FinalWilliam Ryanprogress
05/02/2022Fire-Resistant Penetrations and JointsGregg Rothsteinspecial
04/08/2022Fire-Resistant Penetrations and JointsGregg Rothsteinspecial
04/08/2022FinalGregg Rothsteinprogress
04/08/2022Mechanical SystemsGregg Rothsteinspecial
04/05/2022HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
04/05/2022HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
04/05/2022Mechanical SystemsWilliam Ryanspecial
Latest 25 of 37.
▾Documents — 254 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
09/03/2026M00653940-S1Request digital key ↗
09/02/2026M00711139-S1Request digital key ↗
09/02/2026M00711139-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00357924-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00309535-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00309535-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00309535-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION28
12/20/2024104894937Open ↗
08/29/2024103513217Open ↗
08/29/2024122007327Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION17
04/24/2024110057820Open ↗
04/24/2024110057820Open ↗
05/08/2020123897685Open ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026M00708717-I1Open ↗
08/13/2026M00708717-A2Open ↗
08/13/2026M00708717-A1Open ↗
▸Seals & Professional Certifications66
▸DOB NOWSpecial Inspector Seal & Signature19
09/30/2026M00708717-I1Open ↗
09/30/2026M00708717-I1Open ↗
09/30/2026M00708717-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/30/2026M00708717-I1Open ↗
09/30/2026M00708717-I1Open ↗
09/29/2026M00715512-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00309535-S2Open ↗
09/05/2026M00309535-S1Open ↗
09/05/2026M00309535-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
04/24/2024110057820Open ↗
05/08/2020123897685Open ↗
04/29/2020104894937Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/16/2019140849009Open ↗
05/16/2014122007327Open ↗
▸BISPC FULL REPORT1
01/04/2008110057820Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/16/2014122007327Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/16/2019140849009Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/16/2019140849009Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/29/2020104894937Open ↗
03/25/2020104894937Open ↗
02/19/2020140849009Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
12/09/2008110057820Open ↗
11/14/2008110057820Open ↗
07/07/2008110057820Open ↗
▸BISSCHEDULE B - PLUMBING2
05/16/2019140849009Open ↗
04/26/2012121048785Open ↗
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist5
08/13/2026M00708717-P4Open ↗
08/13/2026M00708717-I1Open ↗
08/13/2026M00708717-A1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00309535-I1Open ↗
09/05/2026M00309535-S2Open ↗
09/05/2026M00309535-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
03/21/2024110057820Open ↗
05/16/2019140849009Open ↗
03/27/2020123897685Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00708717-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00708717-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/05/2026M00309535-S2Open ↗
09/05/2026M00309535-S1Open ↗
09/03/2026M00653940-S1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/24/2020123897685Open ↗
02/19/2020140849009Open ↗
05/16/2019140849009Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/26/2012121048785Open ↗
01/04/2008110057820Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/24/2024110057820Open ↗
05/08/2020123897685Open ↗
04/29/2020123897685Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/26/2024110057820Open ↗
01/26/2021140849009Open ↗
01/26/2021123897685Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/26/2024110057820Open ↗
07/26/2024110057820Open ↗
01/26/2021140849009Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
07/26/2024110057820Open ↗
07/26/2024110057820Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/26/2024110057820Open ↗
07/26/2024110057820Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00711139-S1Open ↗
08/13/2026M00708717-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/16/2019140849009Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/26/2012121048785Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/26/2024110057820Open ↗
01/26/2021140849009Open ↗
01/26/2021123897685Open ↗
Showing 3 of 5 on file for this type
▸BISMECHANICAL SYSTEMS2
07/26/2024110057820Open ↗
07/26/2024110057820Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/26/2024110057820Open ↗
07/26/2024110057820Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
07/29/2024110057820Open ↗
05/11/2022104025001Open ↗
05/11/2022104025001Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE2
05/18/2012121048785Open ↗
04/26/2012121048785Open ↗
▸BISFINAL2
07/26/2024110057820Open ↗
07/26/2024110057820Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/24/2024110057820Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/26/2012121048785Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
07/26/2024110057820Open ↗
05/05/2022104025001Open ↗
01/26/2021140849009Open ↗
Showing 3 of 15 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
05/30/2019140849009Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION7
04/20/2020104894937Open ↗
04/20/2020104894937Open ↗
04/20/2020104894937Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM7
05/27/2020140849009Open ↗
05/04/2020123897685Open ↗
04/29/2020104894937Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
02/24/2020123897685Open ↗
05/16/2014122007327Open ↗
04/26/2012121048785Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/16/2019140849009Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification5
08/24/2026M00708717-A2Open ↗
08/24/2026M00708717-A1Open ↗
08/24/2026M00708717-P1Open ↗
Showing 3 of 5 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
07/24/2024110057820Open ↗