Two family brick
909 59 STREET
BROOKLYN · Sunset Park (East)-Borough Park (West) · BIN 3140609
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
3,078 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: 909 59TH STREET BROOKLYN INC · 2,304 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof1p · 1 filing · 20 docs
Penthouse9p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 11p · 1 filing · 5 docs
Cellar8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
909 59TH STREET BROOKLYN INC4607/08/2026
SAFE-SHIELD ENTERPRISES INC503/22/2026
A7 CONSTRUCTION SERVICE L203/22/2026
HC 215 MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A PLUS DESIGN INC704/19/2024
REVAP CONSULTING ENGINEERS LLC304/16/2024
ASHRAF CORP104/06/2022
CITY BUILDING NY ARCHITECT P.C.104/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A PLUS DESIGN INC.2003/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A7 CONSTRUCTION SERVICE LGeneral Contractor707/08/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing307/08/2026
CASE PLUMBING LLCFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519604/19/2024
RENANT ANTREN CORP4307202/23/2023
Building Lifecycle
All (84)Filed (12)Permit Issued (11)Signed Off (8)Violation (3)Inspection (8)Objection (14)Special Inspection (28)
10/25/2024
Signed off — Alteration
B01036885-I1
10/24/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/05/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/22/2024
Signed off — Alteration
INSTALL NEW WET SPRINKLER SYSTEM COMPLYING TO NFPA-13, 2007 (AS MODIFIED BY APPENDIX Q OF NYC BUILDING CODE) REQUIREMENTS ON ALL FLOORS THROUGHOUT THE BUILDING. FILING IS IN CONJUNCTION WITH ALT1 JOB 321593487.
B00695700-S2
04/19/2024
Filed — Alteration
INSTALL NEW WET SPRINKLER SYSTEM COMPLYING TO NFPA-13, 2007 (AS MODIFIED BY APPENDIX Q OF NYC BUILDING CODE) REQUIREMENTS ON ALL FLOORS THROUGHOUT THE BUILDING. FILING IS IN CONJUNCTION WITH ALT1 JOB 321593487.
B00695700-P3
04/18/2024
Permit issued — Curb Cut
B01036885-I1-CC
04/18/2024
Special inspection requirement — Final
Younes Abouyaala
04/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/18/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
04/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/18/2024
Special inspection requirement — Shutoff dampers
Younes Abouyaala
04/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/18/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/16/2024
Filed — Alteration
B01036885-I1
04/02/2024
Signed off — Alteration
INSTALL NEW WET SPRINKLER SYSTEM COMPLYING TO NFPA-13, 2007 (AS MODIFIED BY APPENDIX Q OF NYC BUILDING CODE) REQUIREMENTS ON ALL FLOORS THROUGHOUT THE BUILDING. FILING IS IN CONJUNCTION WITH ALT1 JOB 321593487.
B00695700-I1
04/02/2024
Signed off — Alteration
INSTALL NEW WET SPRINKLER SYSTEM COMPLYING TO NFPA-13, 2007 (AS MODIFIED BY APPENDIX Q OF NYC BUILDING CODE) REQUIREMENTS ON ALL FLOORS THROUGHOUT THE BUILDING. FILING IS IN CONJUNCTION WITH ALT1 JOB 321593487.
B00695700-S1
04/02/2024
Signed off — Alteration
STRUCTURAL FILING IN CONJUCTION WITH ALTERATION TYPE-1 BIS JOB#321593487
B00729868-I1
04/02/2024
Signed off — Alteration
INSTALL NEW WET SPRINKLER SYSTEM COMPLYING TO NFPA-13, 2007 (AS MODIFIED BY APPENDIX Q OF NYC BUILDING CODE) REQUIREMENTS ON ALL FLOORS THROUGHOUT THE BUILDING. FILING IS IN CONJUNCTION WITH ALT1 JOB 321593487.
B00695700-S3
01/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/18/2023
Permit issued — Sprinklers
B00695700-S1-EW-SP
11/21/2023
Signed off — Alteration
B00636434-I1
10/12/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/06/2023
Permit issued — Boiler Equipment
B00695700-S3-BE
08/24/2023
Filed — Alteration
INSTALL NEW WET SPRINKLER SYSTEM COMPLYING TO NFPA-13, 2007 (AS MODIFIED BY APPENDIX Q OF NYC BUILDING CODE) REQUIREMENTS ON ALL FLOORS THROUGHOUT THE BUILDING. FILING IS IN CONJUNCTION WITH ALT1 JOB 321593487.
B00695700-S3
06/20/2023
Permit issued — Plumbing
B00695700-I1-PL
02/23/2023
Filed — Alteration
INSTALL NEW WET SPRINKLER SYSTEM COMPLYING TO NFPA-13, 2007 (AS MODIFIED BY APPENDIX Q OF NYC BUILDING CODE) REQUIREMENTS ON ALL FLOORS THROUGHOUT THE BUILDING. FILING IS IN CONJUNCTION WITH ALT1 JOB 321593487.
B00695700-P2
02/10/2023
Special inspection requirement — Post-installed Anchors
ANTHONY RENEAUD
02/10/2023
Special inspection requirement — Sprinkler Systems
ANTHONY RENEAUD
02/01/2023
Permit issued — Construction Fence
B00636434-I1-FN
01/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/27/2023
Filed — Alteration
INSTALL NEW WET SPRINKLER SYSTEM COMPLYING TO NFPA-13, 2007 (AS MODIFIED BY APPENDIX Q OF NYC BUILDING CODE) REQUIREMENTS ON ALL FLOORS THROUGHOUT THE BUILDING. FILING IS IN CONJUNCTION WITH ALT1 JOB 321593487.
B00695700-P1
01/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY RENEAUD
01/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY RENEAUD
01/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY RENEAUD
01/26/2023
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY RENEAUD
01/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY RENEAUD
12/28/2022
Signed off — Alteration
INSTALLATION OF HEAVY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
B00712095-I1
10/28/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/08/2022
Permit issued — Sprinklers
B00695700-S1-EW-SP
07/12/2022
Permit issued — Structural
B00729868-I1-ST
07/11/2022
Objection raised — Other
07/11/2022
Objection resolved — Addressed
07/05/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/29/2022
Violation issued (ECB, closed)
Construction
06/29/2022
Violation issued (ECB, closed)
Site Safety
06/29/2022
Violation issued (ECB, closed)
Construction
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection resolved — Addressed
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offA7 CONSTRUCTION SERVICE L04/18/2024
DOB NOWSprinklersSigned-offS & L PLUMBING INC12/18/2023
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC10/06/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC06/20/2023
DOB NOWConstruction FenceSigned-offA7 CONSTRUCTION SERVICE L02/01/2023
DOB NOWSprinklersSigned-offS & L PLUMBING INC08/08/2022
DOB NOWStructuralSigned-offA7 CONSTRUCTION SERVICE L07/12/2022
DOB NOWMechanical SystemsSigned-offA7 CONSTRUCTION SERVICE L06/13/2022
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC04/20/2022
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN04/07/2022
DOB NOWConstruction FenceSigned-offA7 CONSTRUCTION SERVICE L01/04/2022
BIS—ISSUEDA7 CONSTRUCTION SERVICE L01/11/2023
BIS—ISSUEDA7 CONSTRUCTION SERVICE L03/31/2022
BIS—ISSUEDA7 CONSTRUCTION SERVICE L03/31/2022
BIS—ISSUEDA7 CONSTRUCTION SERVICE L03/10/2022
1 project · most recent 03/06/2023
General Wiring
FiledStatusContractorScope
03/06/2023CompleteW 8 ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/24/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/05/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
01/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/12/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/28/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/05/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/05/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/18/2024FinalYounes Abouyaalaprogress
04/18/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/18/2024Maintenance informationYounes Abouyaalaenergy_progress
04/18/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/18/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/18/2024Shutoff dampersYounes Abouyaalaenergy_progress
04/18/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/18/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/18/2024Mechanical SystemsYounes Abouyaalaspecial
04/18/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/10/2023Post-installed AnchorsANTHONY RENEAUDspecial
02/10/2023Sprinkler SystemsANTHONY RENEAUDspecial
01/30/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/30/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/30/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/30/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/30/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/26/2023HVAC-R and service water heating system controlsANTHONY RENEAUDenergy_progress
01/26/2023HVAC-R and service water piping design and insulationANTHONY RENEAUDenergy_progress
01/26/2023HVAC-R and service water heating equipmentANTHONY RENEAUDenergy_progress
01/26/2023Energy Code Compliance InspectionsANTHONY RENEAUDprogress
01/26/2023Fire-Resistant Penetrations and JointsANTHONY RENEAUDspecial
05/04/2022Structural Steel - WeldingYounes Abouyaalaspecial
05/04/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
05/04/2022MasonryYounes Abouyaalaspecial
Latest 25 of 28.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/01/2026B00511057-I1Request digital key ↗
08/31/2026B00636434-I1Request digital key ↗
08/30/2026B00695700-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION20
08/28/2024321593487Open ↗
01/25/2024321593487Open ↗
10/18/2023321593487Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION8
03/17/2022321593487Open ↗
03/17/2022321593487Open ↗
03/16/2022321593487Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/04/2024321593487Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
02/18/2022321593487Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM4
03/05/2024321593487Open ↗
08/15/2022321593487Open ↗
11/17/2021321593487Open ↗
Showing 3 of 4 on file for this type
▸BISRESTRICTION: EASEMENT AGREEMENT1
02/01/2021321593487Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/21/2021321593487Open ↗
▸BISVERIFY TAX LOT1
02/22/2024321593487Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/08/2022321593487Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/22/2024321593487Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/21/2021321593487Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00511057-I1Open ↗
08/31/2026B00636434-I1Open ↗
08/30/2026B00695700-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/25/2026B00729868-I1Open ↗
08/24/2026B00695700-P3Open ↗
08/24/2026B00695700-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00695700-P2Open ↗
09/01/2026B00695700-P2Open ↗
08/25/2026B00729868-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/19/2022321593487Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE PERMITS1
05/22/2024321593487Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
08/14/2025321593487Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
04/18/2024321593487Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/18/2024321593487Open ↗
▸BIS* BOILER (BL) SIGNOFF1
04/18/2024321593487Open ↗
▸BISPLUMBING (PL) SIGNOFF1
04/18/2024321593487Open ↗
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/18/2022321593487Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
02/19/2022321593487Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/18/2022321593487Open ↗
▸BISSTREET TREE CHECKLIST1
02/01/2021321593487Open ↗
▸BISSTREET TREE SIGNOFF1
05/24/2024321593487Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
02/01/2021321593487Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/30/2026B00695700-P3Open ↗
08/30/2026B00695700-S3Open ↗
08/30/2026B00695700-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/21/2021321593487Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/23/2024321593487Open ↗
09/25/2023321593487Open ↗
02/18/2022321593487Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/30/2026B00695700-I1Open ↗
08/13/2026B00695700-S2Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
02/01/2021321593487Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/19/2022321593487Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/22/2024321593487Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY7
05/23/2024321593487Open ↗
09/25/2023321593487Open ↗
02/18/2022321593487Open ↗
Showing 3 of 7 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/18/2022321593487Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
02/18/2022321593487Open ↗
▸BISSOIL REPORT1
02/01/2021321593487Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/19/2022321593487Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/01/2021321593487Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/19/2022321593487Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE3
01/26/2021321593487Open ↗
09/04/2020321593487Open ↗
03/27/2020321593487Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)2
04/18/2024321593487Open ↗
10/20/2021321593487Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/19/2022321593487Open ↗
02/19/2022321593487Open ↗
▸BISCURB CUT (CC) SIGNOFF1
10/25/2024321593487Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
09/03/2024321593487Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
05/22/2024321593487Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
02/01/2021321593487Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/19/2022321593487Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/07/2025321593487Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
02/19/2022321593487Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION12
03/05/2024321593487Open ↗
03/05/2024321593487Open ↗
08/15/2022321593487Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET1
03/28/2020321593487Open ↗
▸Other Documents2
▸BISSupporting Document: Fee Deferment1
01/21/2021321593487Open ↗
▸BISPLOT DIAGRAM1
02/01/2021321593487Open ↗