← Back
BuildNYC
Cape Cod
909 RATHBUN AVENUE
STATEN ISLAND · BIN 5084921
💬 Discuss this project
1930Year Built
1.5Stories
A0Building Class
R3XZoning
1,300 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Cape Cod · Owner of record: Harbor Court Estates · 10,000 sf lot · 0.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 214p · 2 filings · 20 docs
Floor 1Proposed 8' construction fence23p · 3 filings · 20 docs
Cellar14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JM Trinity Holdings1909/01/2026
Harbor Court Estates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stanley M. Krebushevski, R.A.108/22/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Beyer ConstructionGeneral Contractor207/08/2026
Maximum ContractingGeneral Contractor107/08/2026
Beyer ConstructionScaffold104/09/2026
Beyer Constructionspecialty_contractor104/09/2026
Capital Contracting P&HPlumbing106/27/2026
Quality PlumbingPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P Design Consultant8472312/08/2025
SRA Planning & Expediting5677312/08/2025
Building Lifecycle
09/16/2026
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S01257137-I1
08/27/2026
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S01257137-S1
08/27/2026
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S01257137-S3
08/13/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/06/2026
Signed off — Alteration
PROPOSED 8' PLYWOOD CONSTRUCTION FENCE
S01264028-I1
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQuality Plumbing06/24/2026
DOB NOWCurb CutSigned-offBeyer Construction06/18/2026
DOB NOWMechanical SystemsSigned-offBeyer Construction01/27/2026
DOB NOWPlumbingSigned-offCapital Contracting P&H12/12/2025
DOB NOWFull DemolitionSigned-offMaximum Contracting12/03/2025
DOB NOWFoundationPermit IssuedBeyer Construction11/17/2025
DOB NOWConstruction FenceSigned-offBeyer Construction08/06/2025
1 project · most recent 06/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
06/17/2026Signed-offBeyer ConstructionHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 06/17/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/17/2026Signed-offCapital Contracting P&HStorm, Water/Sanitary
2 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025CompleteRidge ElectricGeneral Wiring
09/07/2025CompleteRidge Electric—
1 project · most recent 07/31/2025
Fence
FiledStatusContractorScope
07/31/2025Signed-offBeyer ConstructionFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/13/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/08/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/30/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
12/08/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
12/08/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
12/08/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
12/08/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
09/12/2025Structural Stability – Alterations of existing BuildingsWILLIAM MONTAGUEspecial
09/12/2025DemolitionStanislav Pilipenkospecial
08/11/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
08/11/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
08/11/2025Permanent certificateStanislav Pilipenkoenergy_progress
08/11/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
08/11/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
08/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
08/11/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesWILLIAM MONTAGUEspecial
08/11/2025Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
08/11/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
08/11/2025Maintenance informationStanislav Pilipenkoenergy_progress
08/06/2025FinalStanislav Pilipenkoprogress
08/06/2025Mechanical SystemsStanislav Pilipenkospecial
54 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account