DOB09/19/2023REMEDY: INSTALL TIGHTBOARD FENCE FOR THE FULL WIDTH OF THE EAST SIDE ( MAIN DOOR SIDE) WHICH FRONTS 91 PL APPROX 10FT OF FENCE LUS THE RETURN S PROVIDE A GAP BETWEEN THE TIGHT BOARD FENCE AND GARAGE OF APPROX 5FT
DOB01/27/2022EMERGENCY WORK ORDER: OBSERVED THE SOUTH WALL OF THE 1 STORY GARAGE IS IN DANGER OF COLLAPSING INTO THE ADJ JOB SITE. REMEDY: IMME PROVIDE A NYS PROF ENG'R TO EVALUATE THE STRUCTURAL AND PROVIDE METHOD OF STABILIZING/REPAIRING THE STRUCTURE. COMPLETE ALL STABILIZATION/REPAIR WORK BY 02/03/2022
Predominantly retail with other uses · 3,044 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.