← Back
Two stories - detached, small or mid-size
91-13 217 STREET
QUEENS · BIN 4227321
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2Zoning
1,296 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,800 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI112/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY SOLAR ELECTRICAL LLCElectrical103/22/2026
NYSS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841112/01/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
02/04/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01325863-I1
12/03/2025
Permit issued — Solar
Q01325863-I1-SL
12/01/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01325863-I1
11/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
11/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
11/28/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
11/28/2025
Special inspection requirement — Final
ROBERT MASONE
11/28/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC12/03/2025
1 job · most recent 01/14/2026
FiledStatusContractorScope
01/14/2026CompleteNY SOLAR ELECTRICAL LLC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/28/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
11/28/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
11/28/2025Energy Code Compliance InspectionsROBERT MASONEprogress
11/28/2025FinalROBERT MASONEprogress
11/28/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01325863-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01325863-I1Open ↗
08/25/2026Q01325863-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01325863-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01325863-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01325863-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01325863-I1Open ↗