← Back
Three families
91 2 PLACE
BROOKLYN · BIN 3005159
💬 Discuss this project
1900Year Built
3Stories
C0Building Class
R6BZoning
3,344 sfGross Floor Area
3Units
Rent Stabilized25 Open Violations ▸
Three families · 1,875 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 3 filings · 20 docs
Floor 31p · 1 filing · 15 docs
Floor 27p · 2 filings · 20 docs
Floor 14p · 3 filings · 20 docs
Cellar11p · 3 filings · 20 docs
Basement2p · 2 filings · 20 docs
2 jobs · most recent 12/04/2024
General Wiring
FiledStatusContractorScope
12/04/2024CompleteSUPER CHARGED ELEC. INC.4 meters, 4 new_meters
07/05/2023CompleteSUPER CHARGED ELEC. INC.General Wiring
Building Lifecycle
All (132)Filed (10)Permit Issued (6)Signed Off (4)Violation (33)Inspection (5)Objection (44)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
05/09/2025
Signed off — Alteration
REMOVE ALL PLUMBING FIXTURES IN CELLAR, BASEMENT AND FIRST FLOOR. PROVIDE NEW PLUMBING FIXTURES AS SHOWN ON PLANS. IN CONJUNCTION WITH ALTERATION #B00802810-I1.
B00802836-I1
05/09/2025
Signed off — Alteration
Combine 2 units on the basement and first floors in existing multiple dwelling as per TPPN 3/97. Enlarge masonry opening at rear of basement and first floors for new patio doors, new steel deck.
B00802810-I1
05/09/2025
Signed off — Alteration
PROPOSED OPENING IN REAR MASONRY WALL, REMOVAL OF INTERIOR BEARING WALLS, NEW STEEL DECK IN REAR YARD, FLOOR FRAMING REINFORCEMENT DUE TO REMOVAL OF INTERIOR BEARING WALLS. IN CONJUNCTION WITH ALTERATION #B00802810.
B00837080-I1
05/09/2025
Signed off — Alteration
INSTALLATION OF NEW VRF HEAT PUMPS AND ASSOCIATED DUCTS & PIPING AND VENTILATION SYSTEM IN CONJUNCTION WITH GC APPLICATION #B00802810-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00834319-I1
05/07/2025
Permit issued — Mechanical Systems
B00834319-I1-MS
11/29/2024
Violation issued (HPD, open)
I
06/10/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2024
Permit issued — Plumbing
B00802836-I1-PL
05/16/2024
Permit issued — General Construction
B00802810-I1-GC
04/03/2024
Violation issued (HPD, closed)
A
12/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/22/2023
Violation issued (HPD, closed)
I
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
10/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jeffrey Stones
10/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Stones
10/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
10/12/2023
Special inspection requirement — Masonry
Jeffrey Stones
10/12/2023
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
10/12/2023
Special inspection requirement — Air barrier - visual inspection
Jeffrey Stones
10/12/2023
Special inspection requirement — Final
Jeffrey Stones
10/12/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/12/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Jeffrey Stones
10/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
10/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
10/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
10/04/2023
Objection raised — Other
10/04/2023
Objection resolved — Addressed
10/03/2023
Objection raised — Other
10/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
10/02/2023
Objection raised — Other
09/28/2023
Filed — Alteration
REMOVE ALL PLUMBING FIXTURES IN CELLAR, BASEMENT AND FIRST FLOOR. PROVIDE NEW PLUMBING FIXTURES AS SHOWN ON PLANS. IN CONJUNCTION WITH ALTERATION #B00802810-I1.
B00802836-P2
09/28/2023
Filed — Alteration
Combine 2 units on the basement and first floors in existing multiple dwelling as per TPPN 3/97. Enlarge masonry opening at rear of basement and first floors for new patio doors, new steel deck.
B00802810-P2
09/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
09/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
09/22/2023
Special inspection requirement — Final
Jeffrey Stones
09/22/2023
Special inspection requirement — Air barrier - visual inspection
Jeffrey Stones
09/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
09/22/2023
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
09/22/2023
Special inspection requirement — Fenestration areas
Jeffrey Stones
09/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
09/22/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Jeffrey Stones
09/22/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Stones
09/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
09/22/2023
Special inspection requirement — Fenestration air leakage
Jeffrey Stones
09/22/2023
Special inspection requirement — Insulation placement and R values
Jeffrey Stones
09/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
09/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/22/2023
Permit issued — General Construction
B00837080-I1-GC-CX
06/14/2023
Filed — Alteration
PROPOSED OPENING IN REAR MASONRY WALL, REMOVAL OF INTERIOR BEARING WALLS, NEW STEEL DECK IN REAR YARD, FLOOR FRAMING REINFORCEMENT DUE TO REMOVAL OF INTERIOR BEARING WALLS. IN CONJUNCTION WITH ALTERATION #B00802810.
B00837080-P1
06/06/2023
Filed — Alteration
INSTALLATION OF NEW VRF HEAT PUMPS AND ASSOCIATED DUCTS & PIPING AND VENTILATION SYSTEM IN CONJUNCTION WITH GC APPLICATION #B00802810-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00834319-P1
04/10/2023
Filed — Alteration
PROPOSED OPENING IN REAR MASONRY WALL, REMOVAL OF INTERIOR BEARING WALLS, NEW STEEL DECK IN REAR YARD, FLOOR FRAMING REINFORCEMENT DUE TO REMOVAL OF INTERIOR BEARING WALLS. IN CONJUNCTION WITH ALTERATION #B00802810.
B00837080-I1
Latest 60 of 132 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/04/2022$3.8M—— → —$1,121/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAXT INGUI ARCHITECTS P.C.609/28/2023
CELIN MUNOZ CONSULTING ENGINEER, PC206/14/2023
RJD ENGINEERING LLC206/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MLZ GENERAL CONSTRUCTIONGeneral Contractor607/08/2026
NEW AMSTERDAM PLBG & HTGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MACIA INSPECTION & TESTIN402609/28/2023
JSPECS,INC9429404/10/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMLZ GENERAL CONSTRUCTION05/07/2025
DOB NOWPlumbingSigned-offEDWARD FITZSIMMONS06/04/2024
DOB NOWGeneral ConstructionSigned-offMLZ GENERAL CONSTRUCTION05/16/2024
DOB NOWGeneral ConstructionSigned-offMLZ GENERAL CONSTRUCTION06/22/2023
DOB NOWPlumbingSigned-offEDWARD FITZSIMMONS03/17/2023
DOB NOWGeneral ConstructionSigned-offMLZ GENERAL CONSTRUCTION03/06/2023
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
10/12/2023Tenant Protection Plan ComplianceJeffrey Stonesspecial
10/12/2023Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
10/12/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/12/2023Construction Operations Influencing Adjacent StructuresJeffrey Stonesspecial
10/12/2023MasonryJeffrey Stonesspecial
10/12/2023Lighting in dwelling unitsJeffrey Stonesenergy_progress
10/12/2023Fenestration and door U-factor and product ratingsJeffrey Stonesenergy_progress
10/12/2023Air barrier - visual inspectionJeffrey Stonesenergy_progress
10/12/2023FinalJeffrey Stonesprogress
10/12/2023Energy Code Compliance InspectionsJeffrey Stonesprogress
10/12/2023Fire-Resistance Rated ConstructionJeffrey Stonesprogress
10/06/2023HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
10/06/2023Energy Code Compliance InspectionsJeffrey Stonesprogress
10/06/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
10/03/2023Tenant Protection Plan Compliance—special
09/27/2023HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
09/27/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
09/27/2023Energy Code Compliance InspectionsJeffrey Stonesprogress
09/22/2023Fire-Resistance Rated ConstructionJeffrey Stonesprogress
09/22/2023FinalJeffrey Stonesprogress
09/22/2023Energy Code Compliance InspectionsJeffrey Stonesprogress
09/22/2023Construction Operations Influencing Adjacent StructuresJeffrey Stonesspecial
09/22/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
09/22/2023MasonryJeffrey Stonesspecial
09/22/2023Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
Latest 25 of 62.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B00802810-P1Request digital key ↗
08/28/2026B00802836-P1Request digital key ↗
08/27/2026B00834319-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/04/2008310150911Open ↗
▸BISWORK PERMIT APPLICATION1
06/11/2008310150911Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026B00834319-P1Open ↗
09/01/2026B00834319-P1Open ↗
09/01/2026B00802836-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B00802810-I1Open ↗
08/28/2026B00802810-P1Open ↗
08/28/2026B00802836-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00834319-P1Open ↗
09/01/2026B00802836-P2Open ↗
08/29/2026B00802810-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/04/2008310150911Open ↗
06/04/2008310150911Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/04/2008310150911Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/04/2008310150911Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/28/2026B00802810-P1Open ↗
08/28/2026B00802836-P1Open ↗
08/27/2026B00834319-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/04/2008310150911Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
06/04/2008310150911Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/11/2008310150911Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/04/2008310150911Open ↗