← Back
One family attached or semi-detached
91-30 PARK LANE SOUTH
QUEENS · BIN 4182371
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R3XZoning
1,230 sfGross Floor Area
1Units
One family attached or semi-detached · 1,900 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2025$797K—Private party → GRACE HAVEN TRUST DATED NOVEMBER 20, 2025$648/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CD ARCHITECT STUDIO, LLP105/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON PAUL DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINCHESE CONSTRUCTION INGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CD ARCHITECT STUDIO, LLP2573105/01/2025
Building Lifecycle
All (13)Filed (1)Permit Issued (1)Signed Off (1)Inspection (1)Special Inspection (9)
07/28/2025
Signed off — Alteration
RESTORE EX. 1-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING PARTITIONS & COSMETIC FINISHES. REBUILD WOOD DECK AT REAR. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q01208315-I1
07/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/13/2025
Permit issued — Structural
Q01208315-I1-GC-CX
05/01/2025
Filed — Alteration
RESTORE EX. 1-FAMILY DWELLING & REPAIR FIRE DAMAGES INCLUDING PARTITIONS & COSMETIC FINISHES. REBUILD WOOD DECK AT REAR. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
Q01208315-I1
04/17/2025
Special inspection requirement — Fenestration areas
Nat Costanza
04/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nat Costanza
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nat Costanza
04/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
04/17/2025
Special inspection requirement — Fenestration air leakage
Nat Costanza
04/17/2025
Special inspection requirement — Insulation placement and R values
Nat Costanza
04/17/2025
Special inspection requirement — Interior lighting power
Nat Costanza
04/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nat Costanza
04/09/2025
Special inspection requirement — Final
Nat Costanza
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTRINCHESE CONSTRUCTION IN05/13/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/17/2025Fenestration areasNat Costanzaenergy_progress
04/17/2025Structural Stability – Alterations of existing buildingsNat Costanzaspecial
04/17/2025Fire-Resistant Penetrations and JointsNat Costanzaspecial
04/17/2025Fire-Resistance Rated ConstructionNat Costanzaprogress
04/17/2025Fenestration air leakageNat Costanzaenergy_progress
04/17/2025Insulation placement and R valuesNat Costanzaenergy_progress
04/17/2025Interior lighting powerNat Costanzaenergy_progress
04/17/2025Fenestration and door U-factor and product ratingsNat Costanzaenergy_progress
04/09/2025FinalNat Costanzaprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01208315-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01208315-I1Open ↗
08/25/2026Q01208315-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01208315-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01208315-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01208315-I1Open ↗