← Back
Office only, 2-6 stories
91-30 VAN WYCK EXPRESSWAY
QUEENS · Richmond Hill · BIN 4196964
💬 Discuss this project
1925Year Built
2Stories
O2Building Class
M1-1Zoning
56,000 sfGross Floor Area
4Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: UNIPROP CORP · 61,500 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof20p · 3 filings · 20 docs
Floor 211p · 1 filing · 20 docs
Floor 135p · 3 filings · 20 docs
Cellar11p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WERBER MANAGEMENT4707/08/2026
UNIPROP5903/22/2026
HEVER AND COMPANY103/22/2026
BS GROUP203/21/2026
UNIPOP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING1403/21/2026
JAM CONSULTANTS, INC.1203/21/2026
LOUIS STRIAR603/21/2026
NEW YORK SIGN CONSULTANTS403/21/2026
BUILDING BROTHERS1003/21/2026
DOMINION EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FAZIO CONSTRUCTION GROUPGeneral Contractor907/08/2026
ACTIVE SIGNSScaffold507/08/2026
RED HOOK SIGN ELECTScaffold307/08/2026
CN PLUMBING INCPlumbing207/08/2026
CN PLUMBING INCFire Protection207/08/2026
MAUCERI SIGNScaffold207/08/2026
TOTAL COMFORT MECHANICALGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5441306/26/2026
Building Lifecycle
All (155)Filed (25)Permit Issued (22)Signed Off (17)Violation (45)Inspection (14)Objection (2)Special Inspection (30)
07/28/2026
Special inspection requirement — Vestibules
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Sprayed fire-resistant materials
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Metering
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Final
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Air barrier - visual inspection
EUGENE BIFULCO
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Permanent certificate
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
07/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Masonry
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Air barrier — testing
EUGENE BIFULCO
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Air barrier continuity plan testing
EUGENE BIFULCO
07/28/2026
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
07/16/2026
Objection resolved — Addressed
07/07/2026
Objection raised — Other
06/26/2026
Filed — Alteration CO
This project consists of fitting out the first floor for this Client and changing Use from retail store to Offices. 'Tenant 100' as necessary to achieve a new Certificate of Occupancy, and, fitting out a Retail Store 'Tenant 105'. Space is fully sprinkler
Q00940862-P5
04/14/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
EUGENE BIFULCO
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/14/2026
Special inspection requirement — Masonry
EUGENE BIFULCO
04/14/2026
Special inspection requirement — Mechanical Systems
04/03/2026
Violation issued (FDNY_NOV, closed)
12/15/2025
Violation issued (FDNY_NOV, closed)
12/08/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/24/2025
Signed off — Alteration
Q01134111-I1
11/24/2025
Signed off — Alteration
Modification of mechanical system as shown on submitted plans. No change in occupancy, use or egress.
Q01128796-I1
11/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/02/2025
Signed off — Alteration
Modification of mechanical system as shown on submitted plans. No change in occupancy, use or egress.
Q01128796-S1
10/01/2025
Filed — Alteration CO
This project consists of fitting out the first floor for this Client and changing Use from retail store to Offices. 'Tenant 100' as necessary to achieve a new Certificate of Occupancy, and, fitting out a Retail Store 'Tenant 105'. Space is fully sprinkler
Q00940862-P4
09/23/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (AHF)
Q01134428-I1
09/23/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (AHF)
Q01134673-I1
09/23/2025
Signed off — Alteration
Q01134657-I1
09/23/2025
Signed off — Alteration
Q01134662-I1
09/23/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (AHF)
Q01134668-I1
09/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/10/2025
Permit issued — Mechanical Systems
Q00940862-I1-MS
09/10/2025
Permit issued — General Construction
Q00940862-I1-ST
08/14/2025
Filed — Alteration CO
This project consists of fitting out the first floor for this Client and changing Use from retail store to Offices. 'Tenant 100' as necessary to achieve a new Certificate of Occupancy, and, fitting out a Retail Store 'Tenant 105'. Space is fully sprinkler
Q00940862-P2
07/25/2025
Permit issued — Mechanical Systems
Q00940862-I1-GC
03/11/2025
Signed off — Alteration
Installation and relocation of Gas and Plumbing fixtures.
Q00897935-S1
03/05/2025
Signed off — Alteration
Installation and relocation of Gas and Plumbing fixtures.
Q00897935-I1
03/04/2025
Signed off — Alteration
Installation and relocation of Gas and Plumbing fixtures.
Q00897935-S2
02/25/2025
Permit issued — Sign
Q01134668-I1-SG
02/25/2025
Permit issued — Sign
Q01134662-I1-SG
02/25/2025
Permit issued — Sign
Q01134673-I1-SG
02/25/2025
Permit issued — Sign
Q01134428-I1-SG
02/25/2025
Permit issued — Sign
Q01134657-I1-SG
02/12/2025
Filed — Alteration
Installation and relocation of Gas and Plumbing fixtures.
Q00897935-P2
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFAZIO CONSTRUCTION GROUP09/10/2025
DOB NOWGeneral ConstructionSigned-offFAZIO CONSTRUCTION GROUP09/10/2025
DOB NOWMechanical SystemsPermit IssuedFAZIO CONSTRUCTION GROUP07/25/2025
DOB NOWSignSigned-offACTIVE SIGNS INC02/25/2025
DOB NOWSignSigned-offACTIVE SIGNS INC02/25/2025
DOB NOWSignSigned-offACTIVE SIGNS INC02/25/2025
DOB NOWSignSigned-offACTIVE SIGNS INC02/25/2025
DOB NOWSignSigned-offACTIVE SIGNS INC02/25/2025
DOB NOWSprinklersSigned-offCN PLUMBING INC12/19/2024
DOB NOWMechanical SystemsSigned-offFAZIO CONSTRUCTION GROUP11/29/2024
DOB NOWPlumbingSigned-offCN PLUMBING INC11/27/2024
DOB NOWMechanical SystemsPermit IssuedFAZIO CONSTRUCTION GROUP07/29/2024
DOB NOWSprinklersSigned-offCN PLUMBING INC12/21/2023
DOB NOWPlumbingSigned-offCN PLUMBING INC12/21/2023
DOB NOWMechanical SystemsSigned-offFAZIO CONSTRUCTION GROUP12/06/2023
DOB NOWGeneral ConstructionSigned-offFAZIO CONSTRUCTION GROUP12/06/2023
DOB NOWGeneral ConstructionSigned-offTOTAL COMFORT MECHANICAL03/10/2021
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT01/21/2020
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT01/21/2020
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT01/21/2020
DOB NOWSignSigned-offMAUCERI SIGN CO., INC02/02/2018
DOB NOWSignSigned-offMAUCERI SIGN CO., INC02/01/2018
BIS—ISSUEDZ-CAR-D CORP12/16/2020
BISOTISSUEDINTERBORO SIGN & MAINTENANCE01/28/2019
BIS—ISSUEDINTERBORO SIGN &ELECL MAI09/20/2018
BISSPISSUEDFULL CAPACITY FIRE CORP08/21/2018
BISOTISSUEDHEUER & COMPANY02/15/2018
BIS—ISSUEDA.M.A HOLDINGS INC01/03/2018
BISPLISSUEDADVANCED PLBG LLC11/08/2017
BISOTISSUEDSENTINEL BUILDERS, LLC10/19/2017
BISMHISSUEDSENTINEL BUILDERS, LLC10/19/2017
BIS—ISSUEDHEUER & COMPANY10/03/2017
BISOTISSUEDRICHARD C. MUGLER CO. INC09/26/2017
BISEQISSUEDBS GROUP INC06/20/2017
BISEQISSUEDHEUER & COMPANY05/30/2017
BISMHISSUEDUNIQUE MECHANICAL CORP04/27/2017
BISSPISSUEDVILLAGE P & H NY INC03/02/2017
BISPLISSUEDWILLIAM C. GERAKARIS P&H02/27/2017
BISOTISSUEDHEUER & COMPANY02/21/2017
BISOTISSUEDHEUER & COMPANY02/08/2017
+ 23 more permits on file
1 project · most recent 06/26/2026
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScope
06/26/2026Signed-offFAZIO CONSTRUCTION GROUPAssociated Ducts and Piping, Ventilation Systems
9 projects · most recent 02/14/2025
General Wiring
FiledStatusContractorScope
02/14/2025CompleteRAINBOW ELECTRIC CO., INC—
02/14/2025CompleteRAINBOW ELECTRIC CO., INC—
12/04/2024CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
12/04/2024CompleteQUEUE ELEC'L CONTRS, INC—
12/04/2024CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
08/28/2024CompleteQUEUE ELEC'L CONTRS, INC—
12/14/2023CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
11/16/2023CompleteQUEUE ELEC'L CONTRS, INC—
02/04/2020CompleteRAINBOW ELECTRIC CO., INC—
1 project · most recent 06/26/2026
Steel
FiledStatusContractorScope
06/26/2026Signed-offFAZIO CONSTRUCTION GROUPSteel
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
12/08/2025Fail-Final CND-Occupancy InspectionFailView ↗
11/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/28/2026Insulation placement and R valuesEUGENE BIFULCOenergy_progress
07/28/2026Air barrier continuity plan testingEUGENE BIFULCOenergy_progress
07/28/2026Fenestration areasEUGENE BIFULCOenergy_progress
07/28/2026Permanent certificateEUGENE BIFULCOenergy_progress
07/28/2026Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
07/28/2026Interior lighting powerEUGENE BIFULCOenergy_progress
07/28/2026Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
07/28/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
07/28/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
07/28/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
07/28/2026Sprayed fire-resistant materialsEUGENE BIFULCOspecial
07/28/2026Exterior Insulation and Finish Systems (EIFS)EUGENE BIFULCOspecial
07/28/2026MasonryEUGENE BIFULCOspecial
07/28/2026Structural Steel - DetailsEUGENE BIFULCOspecial
07/28/2026Mechanical SystemsEUGENE BIFULCOspecial
07/28/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
07/28/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/28/2026FinalEUGENE BIFULCOprogress
07/28/2026Air barrier — testing EUGENE BIFULCOenergy_progress
07/28/2026Air barrier - visual inspectionEUGENE BIFULCOenergy_progress
07/28/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
07/28/2026Lighting controlsEUGENE BIFULCOenergy_progress
07/28/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
07/28/2026MeteringEUGENE BIFULCOenergy_progress
07/28/2026VestibulesEUGENE BIFULCOenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AIDS Healthcare Foundation (AHF)OfficeFloor 1
Project Q00940862 Alteration CO · Permit Entire · 12/21/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 493 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch21
08/29/2026Q00002371-I1Request digital key ↗
08/29/2026Q00002368-I1Request digital key ↗
08/23/2026Q00897935-S1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sign3
08/28/2026Q00240493-I1Request digital key ↗
08/28/2026Q00240507-I1Request digital key ↗
08/28/2026Q00240464-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00445734-I1Request digital key ↗
▸Applications & Permits83
▸BISPLAN / WORK APPROVAL APPLICATION53
02/14/2020420592326Open ↗
02/10/2020420592326Open ↗
10/03/2019421352388Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION26
01/29/2019421718751Open ↗
10/01/2018421611447Open ↗
09/24/2018421565130Open ↗
Showing 3 of 26 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
04/11/2019421271037Open ↗
01/12/2019421549701Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
07/29/2019421352379Open ↗
▸Seals & Professional Certifications127
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
08/28/2019421352388Open ↗
08/28/2019421352388Open ↗
05/22/2019421718751Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/25/2026Q00897935-S1Open ↗
09/23/2026Q00940862-P4Open ↗
09/02/2026Q01134428-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/29/2026Q00002368-I1Open ↗
08/28/2026Q00240493-I1Open ↗
08/27/2026Q00445734-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/25/2026Q00897935-S1Open ↗
09/23/2026Q00940862-P4Open ↗
09/23/2026Q00940862-P4Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
01/05/2019421549701Open ↗
01/05/2019421718751Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
01/05/2019421718751Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
02/05/2019421352388Open ↗
01/05/2019421549701Open ↗
09/25/2018421549701Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS6
04/13/2020421352388Open ↗
04/13/2020421352388Open ↗
04/13/2020421352388Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
04/24/2020421626271Open ↗
12/06/2019421353555Open ↗
11/21/2019421353555Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/13/2020421352388Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
11/27/2018421352388Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
08/22/2026Q00940862-P1Open ↗
08/22/2026Q00940862-I1Open ↗
08/22/2026Q00940862-P4Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/29/2026Q00002368-I1Open ↗
08/28/2026Q00240493-I1Open ↗
08/22/2026Q00940862-P1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
01/05/2019421718751Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: WORK UNDER 1000 SQFT (DEP ACP7)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
05/22/2019421718751Open ↗
04/18/2019421352388Open ↗
04/18/2019421352388Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
06/20/2019421352388Open ↗
01/16/2019421271037Open ↗
01/12/2019421549701Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/14/2019421352388Open ↗
Showing 1 of 2 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
02/26/2020421352388Open ↗
06/08/2019421390587Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
09/04/2018421611447Open ↗
▸BISLetter to Change Work Order (Prior to Inspection)1
09/13/2018421565130Open ↗
▸BISHYDRO FLOW TEST LETTER1
09/04/2018421611447Open ↗
▸Approvals, Objections & Sign-offs60
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
02/12/2021421565130Open ↗
01/11/2021420592326Open ↗
01/07/2021420592326Open ↗
Showing 3 of 30 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
01/28/2021421565130Open ↗
03/24/2020420592326Open ↗
02/26/2020421352388Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/14/2020420592326Open ↗
02/10/2020420592326Open ↗
Showing 2 of 6 on file for this type
▸BISSUPERSEDING LETTER2
09/24/2018421565130Open ↗
Showing 1 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISIntent to Rescind Letter1
11/27/2018421565130Open ↗
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT30
02/12/2021421565130Open ↗
04/20/2020421626271Open ↗
03/10/2020421352388Open ↗
Showing 3 of 30 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
03/24/2020420592326Open ↗
Showing 1 of 2 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
01/28/2021421565130Open ↗
▸BISSTEEL AFFIDAVIT- FINAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms60
▸BISEFILING COVER SHEET21
01/05/2019421718751Open ↗
05/02/2018421626271Open ↗
03/20/2018421611447Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM21
04/20/2020421626271Open ↗
03/10/2020421352388Open ↗
12/17/2019421353555Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION18
02/12/2021421565130Open ↗
02/26/2020421352388Open ↗
02/10/2020421352388Open ↗
Showing 3 of 18 on file for this type
▸Other Documents7
▸DOB NOWProperty Ownership Certification5
08/22/2026Q00940862-P1Open ↗
08/22/2026Q00940862-I1Open ↗
08/22/2026Q00940862-P2Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
05/21/2021420592326Open ↗
Showing 1 of 2 on file for this type