← Back
Two family frame
91-43 LEFFERTS BOULEVARD
QUEENS · BIN 4196688
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R4AZoning
3,471 sfGross Floor Area
2Units
Rent Stabilized17 Open Violations ▸FDNY Report ↗
Two family frame · Owner of record: 118-12 97 AVE LLC · 5,000 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES2207/08/2026
91-43 LEFFERTS OWNERS CORP803/22/2026
118-12 97 AVE603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/10/2022$800K—9143 LEFFERTS OWNERS CORP → 118-12 97 AVE LLC$230/sf building
08/06/2015$775K—Private party → Private party$223/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.601/10/2025
ABEJA ENGINEERING PLLC107/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&K CONTRACTING NY CORPGeneral Contractor403/21/2026
RELIABLE ENTERPRISES INCGeneral Contractor307/08/2026
DESIGN PROCURE BUILD LLCGeneral Contractor203/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE BORING INC.3234204/16/2024
CL ENGINEERING P.C.6781404/16/2024
ABEJA ENGINEERING PLLC7269107/21/2021
Building Lifecycle
All (91)Filed (7)Permit Issued (6)Signed Off (4)Violation (27)Inspection (11)Objection (6)Special Inspection (30)
05/07/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
09/04/2025
Signed off — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00821040-I1.
Q00821040-S3
09/03/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/12/2025
Violation issued (HPD, open)
A
06/02/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/18/2025
Permit issued — Curb Cut
Q00821040-S3-CC
01/10/2025
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00821040-I1.
Q00821040-S3
12/02/2024
Violation issued (HPD, open)
I
11/05/2024
Signed off — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00821040-I1.
Q00821040-S1
07/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2024
Signed off — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00821040-I1.
Q00821040-S2
05/07/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/25/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
DAVID WASHINGTON
04/25/2024
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Metering
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Masonry
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
04/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/16/2024
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00821040-I1.
Q00821040-P1
04/16/2024
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00821040-I1.
Q00821040-P2
04/15/2024
Violation issued (HPD, open)
A
04/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/27/2023
Violation issued (HPD, open)
I
10/19/2023
Permit issued — Plumbing
Q00821040-S1-PL
08/21/2023
Permit issued — Construction Fence
Q00821040-S2-FN
08/21/2023
Permit issued — Earth Work
Q00821040-I1-GC-CX
08/08/2023
Permit issued — Construction Fence
Q00821040-S2-FN
07/18/2023
Filed — Alteration CO
FILED HEREWITH PLUMBING WORK TYPES IN CONJUNCTION WITH ALTERATION APPLICATION #Q00821040-I1.
Q00821040-S1
03/29/2023
Violation issued (HPD, open)
A
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offRELIABLE ENTERPRISES INC02/18/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/19/2023
DOB NOWConstruction FenceSigned-offR&K CONTRACTING NY CORP08/21/2023
DOB NOWEarth WorkPermit IssuedR&K CONTRACTING NY CORP08/21/2023
DOB NOWConstruction FenceSigned-offRELIABLE ENTERPRISES INC08/08/2023
DOB NOWGeneral ConstructionSigned-offDESIGN PROCURE BUILD12/07/2021
BISCCISSUEDKEYSTONE NYC CONSTRUCTIO*02/09/2012
BISPLISSUEDP.S.I. MECHANICAL12/07/2011
BISPLISSUEDAMERICAN PLBG SOLUTIONS I08/31/2010
BISOTISSUEDTOTAL STRUCTURE ENTER INC08/05/2010
1 project · most recent 01/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/10/2025Signed-offINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
1 project · most recent 07/16/2024
General Wiring
FiledStatusContractorScope
07/16/2024CompleteSUPREME ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/03/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/02/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
07/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2024Fail-Final CND-Occupancy InspectionFailView ↗
04/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
04/25/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
04/25/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/25/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
04/25/2024Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
04/25/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
04/25/2024Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
04/25/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
04/25/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
04/25/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/25/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
04/25/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
04/25/2024MasonryCHRISTIAN LOZADAspecial
04/25/2024Heating SystemsCHRISTIAN LOZADAspecial
04/25/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/25/2024Subsurface Investigations (Borings/Test Pits)DAVID WASHINGTONspecial
04/25/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
04/25/2024Structural Steel - DetailsCHRISTIAN LOZADAspecial
04/25/2024Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
04/25/2024Mechanical SystemsCHRISTIAN LOZADAspecial
04/25/2024Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
04/25/2024Subgrade InspectionsCHRISTIAN LOZADAspecial
04/25/2024Construction Operations Influencing Adjacent StructuresCHRISTIAN LOZADAspecial
04/25/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
04/25/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/25/2024Footing and FoundationCHRISTIAN LOZADAprogress
Latest 25 of 84.
▾Documents — 128 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00821040-P2Request digital key ↗
08/24/2026Q00821040-S3Request digital key ↗
08/24/2026Q00821040-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
09/05/2025420350211Open ↗
09/04/2025420350211Open ↗
01/28/2025420350211Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
05/12/2025420350211Open ↗
02/13/2012420350211Open ↗
12/09/2011420196362Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
12/23/2024440813808Open ↗
06/17/2024440813808Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/24/2026Q00821040-P2Open ↗
08/13/2026Q00821040-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00821040-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature11
09/25/2026Q00821040-S1Open ↗
09/25/2026Q00821040-S1Open ↗
09/01/2026Q00821040-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/25/2026Q00821040-S1Open ↗
09/25/2026Q00821040-S1Open ↗
09/01/2026Q00821040-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION7
05/15/2012420196362Open ↗
08/04/2010420196362Open ↗
08/04/2010420196362Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00821040-S1Open ↗
08/24/2026Q00821040-S3Open ↗
08/24/2026Q00821040-P2Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/23/2024440813808Open ↗
06/17/2024440813808Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING4
09/13/2011420196362Open ↗
12/09/2010420196362Open ↗
10/29/2010420196362Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
05/17/2012420196362Open ↗
12/22/2011420196362Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/24/2026Q00821040-P2Open ↗
08/24/2026Q00821040-I1Open ↗
▸BISSTREET TREE CHECKLIST1
06/17/2024440813808Open ↗
▸BISSTREET TREE SIGNOFF1
08/15/2025440813808Open ↗
▸BISSTREET TREES SITE PLAN1
08/15/2025440813808Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/17/2024440813808Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026Q00821040-P1Open ↗
08/24/2026Q00821040-P2Open ↗
08/24/2026Q00821040-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/03/2011420350211Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/04/2010420196362Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/24/2026Q00821040-P2Open ↗
08/13/2026Q00821040-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00821040-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION8
09/04/2025420350211Open ↗
12/23/2024440813808Open ↗
06/30/2015420196362Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/03/2011420350211Open ↗
06/04/2010420196362Open ↗
▸BISSUPERSEDING LETTER1
12/10/2025420350211Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/15/2012420196362Open ↗
▸BISBPP: FINAL SIGNOFF1
08/19/2025440813808Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/15/2012420196362Open ↗
08/04/2010420196362Open ↗
06/04/2010420196362Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
09/29/2025440813808Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
09/29/2025440813808Open ↗
09/04/2025420350211Open ↗
01/28/2025420350211Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
05/03/2011420350211Open ↗
06/04/2010420196362Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/05/2024440813808Open ↗
▸BISBOROUGH INTAKE FORM1
05/12/2025420350211Open ↗
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION3
08/19/2025440813808Open ↗
08/19/2025440813808Open ↗
12/23/2024440813808Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/24/2026Q00821040-P2Open ↗
08/13/2026Q00559790-I1Open ↗
08/13/2026Q00821040-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/24/2026Q00821040-P2Open ↗
08/13/2026Q00821040-I1Open ↗
▸DOB NOWPlot Diagram2
08/24/2026Q00821040-P2Open ↗
08/13/2026Q00821040-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026Q00821040-P2Open ↗
08/24/2026Q00821040-I1Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
09/29/2025440813808Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
09/29/2025440813808Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/23/2024440813808Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/17/2024440813808Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00821040-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00821040-I1Open ↗