← Back
Office with commercial, 7-19 stories
91 5 AVENUE
MANHATTAN · BIN 1016095
💬 Discuss this project
1896Year Built
8Stories
O6Building Class
C6-4MZoning
51,838 sfGross Floor Area
10Units
LL97 Covered2 Open Violations ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 91 FIFTH AVENUE CORP · 6,629 sf lot · 7.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 4 docs
Floor 41p · 1 filing · 4 docs
Floor 3
Floor 2
Floor 1Under Construction7p · 2 filings · 11 docs
CellarUnder Construction1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HRC8409/13/2026
KINGS GROUP NY209/13/2026
91 FIFTH AVENUE1803/22/2026
ROCK GROUP NY103/22/2026
91 5 AVE CORP303/22/2026
OWNER OF 91 5 AVE203/22/2026
GREEN 19W44 OWNER LLC C/O EVERES103/21/2026
91 5TH AVENUE303/21/2026
298 5TH AVENUE103/21/2026
GREEN 19W44 OWNER LLC C O EVERES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCHNACKEL ENGINEERS108/05/2026
LALIRE MARCH ARCHITECTS LLP108/04/2026
KMA DESIGNS LLC106/11/2026
DAVID TURNER ARCHITECT PC105/02/2023
CONAPAC SERVICES, DBA101/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COLGATE RESTORATION CORPGeneral Contractor203/21/2026
CARL WEISSElectrical103/21/2026
OTTEN, GERALDElectrical103/21/2026
A. BONADUCE, INCGeneral Contractor108/13/2026
DAVID TURNER ARCHITECT,PCGeneral Contractor107/08/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
BEHNAMBAKHSH, SHAYANElectrical103/21/2026
GO GREENER PLUMBING LLCPlumbing108/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983108/04/2026
RI CONSULTING SERVICES IN8904106/23/2026
DAVID TURNER ARCHITECT PC3829105/02/2023
Building Lifecycle
All (100)Filed (6)Permit Issued (6)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (4)Special Inspection (6)
08/14/2026
Permit issued — Plumbing
M01427444-I1-PL
08/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/12/2026
Permit issued — General Construction
M01427101-I1-GC
08/11/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
M01415455-I1
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2026
Filed — Alteration
Plumbing work associated with commercial space renovations occupied by J Crew. No change in egress, occupancy or egress.
M01427444-I1
08/04/2026
Filed — Alteration
Renovation to existing commercial space occupied by J Crew. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith.
M01427101-I1
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Gregory Schnackel
08/03/2026
Special inspection requirement — Interior lighting power
Gregory Schnackel
07/06/2026
Permit issued — Suspended Scaffold
M01420055-I1-SC
06/23/2026
Filed — Alteration
M01420055-I1
06/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Istiaque Hasan
06/23/2026
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
06/11/2026
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
M01415455-I1
06/11/2026
Permit issued — Sidewalk Shed
M01415455-I1-SH
02/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2023
Signed off — Alteration
M00867420-I1
06/28/2023
Permit issued — Mechanical Systems
M00867420-I1-MS
05/02/2023
Filed — Alteration
M00867420-I1
09/02/2022
Signed off — Alteration
INSTALLATIONOF SUPPORTED SCAFFOLD FROM GROUND IN PARKING LOT AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
M00651551-I1
05/05/2022
Violation issued (FDNY_NOV, closed)
02/20/2022
Cycle 9 facade report submitted
02/20/2022
Cycle 9 facade report signed — SAFE
02/19/2022
Cycle 9 facade inspection completed
02/09/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/04/2022
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
01/07/2022
Permit issued — Supported Scaffold
M00651551-I1-SF
01/06/2022
Filed — Alteration
INSTALLATIONOF SUPPORTED SCAFFOLD FROM GROUND IN PARKING LOT AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
M00651551-I1
12/20/2021
Special inspection requirement — Final
OMAR GAZALI
08/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/17/2019
Violation issued (FDNY_NOV, closed)
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2018
Violation issued (ECB, closed)
Construction
01/01/2018
Cycle 8 facade report signed — SAFE
12/08/2017
Violation issued (ECB, closed)
Construction
11/29/2017
Violation issued (ECB, closed)
Construction
11/28/2017
Cycle 8 facade report submitted
11/22/2017
Cycle 8 facade inspection completed
08/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/19/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/30/2017
Cycle 8 facade report submitted
01/30/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2017
Violation issued (ECB, closed)
Construction
01/09/2017
Cycle 8 facade report signed — UNSAFE
12/06/2016
Cycle 8 facade inspection completed
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedGO GREENER PLUMBING LLC08/14/2026
DOB NOWGeneral ConstructionPermit IssuedA. BONADUCE, INC08/12/2026
DOB NOWSuspended ScaffoldSigned-offM.G.R. RESTORATION INC07/06/2026
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/11/2026
DOB NOWMechanical SystemsSigned-offDAVID TURNER ARCHITECT,PC06/28/2023
DOB NOWSupported ScaffoldSigned-offCOLGATE RESTORATION CORP01/07/2022
BISEQISSUEDROCK GROUP NY CORP03/01/2018
BISSPISSUEDASHLAR MECHANICAL CORP10/17/2017
BISOTISSUEDRETAIL CONSTRUCTION SVCS10/12/2017
BISMHISSUEDRETAIL CONSTRUCTION SVCS10/12/2017
BISOTISSUEDCOLGATE RESTORATION CORP04/13/2017
BISEQISSUEDROCK GROUP NY CORP02/24/2017
BISOTRE-ISSUEDNELSON CONSTRUCTION INC05/31/2016
BISOTISSUEDCDP GENERAL CONTRACTORS L09/17/2015
BISMHISSUEDDONNELLY MECHANICAL CORP05/01/2015
BISMHISSUEDDONNELLY MECHANICAL CORP04/07/2015
BISMHISSUEDDONNELLY MECHANICAL CORP12/22/2014
BISPLISSUEDA.M. SAGE PLG & HTG LLC06/12/2014
BISSPISSUEDM&T PLBG AND HTG CO., INC06/12/2014
BISPLISSUEDNY PLUMBING & HEATING COR08/15/2013
BISOTISSUEDPRO CONCRETE CONTRACTORS07/24/2013
BISOTISSUEDPRO CONCRETE CONTRACTORS06/20/2013
BISPLISSUEDNY PLUMBING & HEATING COR08/15/2012
BIS—ISSUEDUNITED ALLIANCE ENTERPRIS08/07/2012
BISOTISSUEDJ & N CONSTRUCTION GROUP10/26/2011
BISEQISSUEDEVEREST SCAFFOLDING INC04/06/2011
BISEQISSUEDEVEREST SCAFFOLDING INC02/24/2011
BISSPISSUEDM&T PLBG AND HTG CO., INC02/02/2011
BISPLISSUEDM&T PLBG AND HTG CO., INC02/02/2011
BISEQISSUEDTRINITY BUILDING AND CONS01/31/2011
BISOTISSUEDTRINITY BUILDING AND CONS01/31/2011
BISOTISSUEDTRINITY BUILDING AND CONS01/31/2011
BISMHISSUEDTRINITY BUILDING AND CONS01/31/2011
BIS—ISSUEDTRINITY BUILDING AND CONS01/04/2011
BISPLISSUEDSTARLITE PLBG & HTG CORP05/07/2010
BISOTISSUEDWONDER WORKS CONSTR CORP05/04/2010
BISMHISSUEDWONDER WORKS CONSTR CORP05/03/2010
BISPLISSUEDKBM BRAND PLBG AND HTG CO04/18/2007
BISMHISSUEDRENISS INC02/09/2007
BISOTISSUEDRENISS INC02/09/2007
+ 16 more permits on file
1 project · most recent 08/05/2026
Water/Sanitary
FiledStatusContractorScope
08/05/2026Permit IssuedGO GREENER PLUMBING LLCWater/Sanitary
3 projects · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedPRECISION ELECL CONT CORPGeneral Wiring
06/02/2026CompleteHIGH QUALITY ELEC.OF NYC—
08/12/2022CancelledSTAR ELEC'L CONTRACTORS C—
1 project · most recent 06/11/2026
Sidewalk Shed
FiledStatusContractorScope
06/11/2026Signed-offKINGS GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/04/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/03/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/03/2026Energy Code Compliance InspectionsGregory Schnackelprogress
08/03/2026Interior lighting powerGregory Schnackelenergy_progress
06/23/2026Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
06/23/2026Post-installed AnchorsMd Istiaque Hasanspecial
12/20/2021FinalOMAR GAZALIprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.CrewRetailGround
Project M01427444 Alteration · Permit Entire · 08/05/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 426 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00651551-I1Request digital key ↗
08/31/2026M00867420-I1Request digital key ↗
08/16/2026M01415455-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits79
▸BISPLAN / WORK APPROVAL APPLICATION46
04/10/2018140601178Open ↗
01/18/2018123161942Open ↗
01/12/2018123161942Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION28
03/05/2018140601178Open ↗
10/17/2017123161942Open ↗
10/13/2017123161942Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit3
08/16/2026M01427101-I1Open ↗
08/16/2026M01427444-I1Open ↗
08/13/2026M00867420-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications109
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
07/30/2018140601178Open ↗
06/29/2018140601178Open ↗
06/29/2018140601178Open ↗
Showing 3 of 71 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
10/11/2017123161942Open ↗
10/11/2017123161942Open ↗
09/16/2015122362834Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
10/12/2017123161942Open ↗
10/11/2017123161942Open ↗
02/23/2017140601178Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026M00867420-I1Open ↗
08/16/2026M01415455-I1Open ↗
08/16/2026M01427101-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026M01427101-I1Open ↗
08/28/2026M01427101-I1Open ↗
08/25/2026M00651551-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01420055-I1Open ↗
09/01/2026M01420055-I1Open ↗
08/28/2026M01427101-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/23/2017140601178Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/23/2017140601178Open ↗
▸Trade Schedules & Equipment38
▸BISSELF-CERT PLUMBING NOTICE14
12/11/2014120827784Open ↗
08/18/2014120827784Open ↗
07/29/2014120827784Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/18/2018123161942Open ↗
01/12/2018123161942Open ↗
10/11/2017123161942Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
04/30/2015122210516Open ↗
07/18/2014120543484Open ↗
07/09/2014120543484Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/10/2015122210516Open ↗
07/09/2014120543484Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/24/2018123175884Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
10/11/2017123161942Open ↗
01/19/2017122978395Open ↗
05/17/2016122737985Open ↗
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos21
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
10/12/2017123161942Open ↗
10/11/2017123161942Open ↗
01/19/2017122978395Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026M00867420-I1Open ↗
08/16/2026M01427101-I1Open ↗
08/16/2026M01427444-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
01/16/2018122978395Open ↗
12/21/2017123161942Open ↗
12/21/2017123161942Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/16/2018122978395Open ↗
12/21/2017123161942Open ↗
10/06/2016122737985Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports5
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/23/2017140601178Open ↗
▸Approvals, Objections & Sign-offs51
▸BISLANDMARKS APPROVAL18
01/26/2018123161942Open ↗
01/16/2018122978395Open ↗
10/11/2017123161942Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
07/30/2018123175884Open ↗
06/29/2018140601178Open ↗
01/26/2018123161942Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
12/16/2014122210516Open ↗
Showing 1 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSHED LETTER1
03/05/2018140601178Open ↗
▸BISLANDMARKS SIGNOFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
06/30/2014120827784Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT34
07/30/2018123175884Open ↗
01/26/2018123161942Open ↗
01/16/2018122978395Open ↗
Showing 3 of 34 on file for this type
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET21
11/29/2017123175884Open ↗
10/11/2017123161942Open ↗
10/11/2017123161942Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION14
06/29/2018140601178Open ↗
05/04/2015120856733Open ↗
03/04/2014120827784Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM7
07/30/2018123175884Open ↗
06/29/2018140601178Open ↗
04/10/2018140601178Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/23/2017140601178Open ↗
Showing 1 of 2 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
06/22/2016122362834Open ↗
05/07/2015120856733Open ↗
Showing 2 of 7 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBSA VARIANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
04/25/2017122978395Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
02/23/2017140601178Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01420055-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01420055-I1Open ↗