← Back
Two family converted from one family
91-52 193 STREET
QUEENS · Hollis · BIN 4231503
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R5Zoning
2,208 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 6,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC106/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272106/25/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
10/22/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01067695-I1
07/03/2024
Permit issued — Solar
Q01067695-I1-SL
06/25/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01067695-I1
06/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
06/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/17/2024
Special inspection requirement — Final
Walid Abdulla
06/17/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
06/27/2012
Violation issued (ECB, closed)
Unknown
06/27/2012
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/03/2024
1 project · most recent 06/25/2024
FiledStatusContractorScope
06/25/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/17/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/17/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/17/2024Energy Code Compliance InspectionsWalid Abdullaprogress
06/17/2024FinalWalid Abdullaprogress
06/17/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01067695-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q01067695-I1Open ↗
08/24/2026Q01067695-I1Open ↗
08/24/2026Q01067695-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q01067695-I1Open ↗
08/24/2026Q01067695-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01067695-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01067695-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01067695-I1Open ↗