← Back
BuildNYC
Office with commercial, 7-19 stories
91 5TH AVENUE
MANHATTAN · BIN 1016095
💬 Discuss this project
1896Year Built
8Stories
O6Building Class
C6-4MZoning
51,838 sfGross Floor Area
10Units
LL97 Covered1 Active Violation ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 91 Fifth Avenue · 6,629 sf lot · 7.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCommercial HVAC unit replacement on roof2p · 1 filing · 4 docs
Floor 6Commercial HVAC unit replacement on roof1p · 1 filing · 4 docs
Floor 5
Floor 4Commercial HVAC unit replacement on roof2p · 1 filing · 4 docs
Floor 3
Floor 2
Floor 1J.CrewUnder Construction11p · 3 filings · 14 docs
CellarJ.CrewUnder Construction1p · 1 filing · 4 docs
Site & exteriorHeavy duty sidewalk shed installation6p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HRC7809/13/2026
91 Fifth Avenue2103/22/2026
NYC Department of Housing Preservation and Development503/21/2026
Green 19W44 Owner LLC C/O Everes303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Schnackel Engineers108/05/2026
Lalire March Architects108/04/2026
Kma Designs106/11/2026
David Turner Architect105/02/2023
Conapac Services, Dba101/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Colgate RestorationScaffold203/21/2026
Dobs Elevator CompanyElectrical103/21/2026
A. BonaduceGeneral Contractor108/13/2026
Citywide Electrical ContractingElectrical103/21/2026
Kings Group NYScaffold107/08/2026
Go Greener PlumbingPlumbing108/16/2026
David Turner ArchitectGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983108/04/2026
RI Consulting Services8904106/23/2026
David Turner Architect3829105/02/2023
Building Lifecycle
All (101)Filed (6)Permit Issued (6)Signed Off (4)Facade (FISP) (15)Violation (60)Inspection (4)Special Inspection (6)
09/11/2026
Signed off — Alteration
M01420055-I1
08/14/2026
Permit issued — Plumbing
M01427444-I1-PL
08/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/12/2026
Permit issued — General Construction
M01427101-I1-GC
08/11/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
M01415455-I1
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2026
Filed — Alteration
Plumbing work associated with commercial space renovations occupied by J Crew. No change in egress, occupancy or egress.
M01427444-I1
08/04/2026
Filed — Alteration
Renovation to existing commercial space occupied by J Crew. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith.
M01427101-I1
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Gregory Schnackel
08/03/2026
Special inspection requirement — Interior lighting power
Gregory Schnackel
07/06/2026
Permit issued — Suspended Scaffold
M01420055-I1-SC
06/23/2026
Filed — Alteration
M01420055-I1
06/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Istiaque Hasan
06/23/2026
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
06/11/2026
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC
M01415455-I1
06/11/2026
Permit issued — Sidewalk Shed
M01415455-I1-SH
02/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2023
Signed off — Alteration
M00867420-I1
06/28/2023
Permit issued — Mechanical Systems
M00867420-I1-MS
05/02/2023
Filed — Alteration
M00867420-I1
09/02/2022
Signed off — Alteration
INSTALLATIONOF SUPPORTED SCAFFOLD FROM GROUND IN PARKING LOT AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
M00651551-I1
05/05/2022
Violation issued (FDNY_NOV, closed)
02/20/2022
Cycle 9 facade report submitted
02/20/2022
Cycle 9 facade report signed — SAFE
02/19/2022
Cycle 9 facade inspection completed
02/09/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/04/2022
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
01/07/2022
Permit issued — Supported Scaffold
M00651551-I1-SF
01/06/2022
Filed — Alteration
INSTALLATIONOF SUPPORTED SCAFFOLD FROM GROUND IN PARKING LOT AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
M00651551-I1
12/20/2021
Special inspection requirement — Final
OMAR GAZALI
08/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/19/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/17/2019
Violation issued (FDNY_NOV, closed)
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2018
Violation issued (ECB, closed)
Construction
01/01/2018
Cycle 8 facade report signed — SAFE
12/08/2017
Violation issued (ECB, closed)
Construction
11/29/2017
Violation issued (ECB, closed)
Construction
11/28/2017
Cycle 8 facade report submitted
11/22/2017
Cycle 8 facade inspection completed
08/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/08/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/19/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/30/2017
Cycle 8 facade report submitted
01/30/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2017
Violation issued (ECB, closed)
Construction
01/09/2017
Cycle 8 facade report signed — UNSAFE
12/06/2016
Cycle 8 facade inspection completed
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedGo Greener Plumbing08/14/2026
DOB NOWGeneral ConstructionPermit IssuedA. Bonaduce08/12/2026
DOB NOWSuspended ScaffoldSigned-offM.G.R. Restoration07/06/2026
DOB NOWSidewalk ShedSigned-offKings Group NY06/11/2026
DOB NOWMechanical SystemsSigned-offDavid Turner Architect06/28/2023
DOB NOWSupported ScaffoldSigned-offColgate Restoration01/07/2022
BISEQISSUEDRock Group NY03/01/2018
BISSPISSUEDAshlar Mechanical10/17/2017
BISOTISSUEDRetail Construction Services10/12/2017
BISMHISSUEDRetail Construction Services10/12/2017
BISOTISSUEDColgate Restoration04/13/2017
BISEQISSUEDRock Group NY02/24/2017
BISOTRE-ISSUEDNelson Construction05/31/2016
BISOTISSUEDCDP General Contractors09/17/2015
BISMHISSUEDDonnelly Mechanical05/01/2015
BISMHISSUEDDonnelly Mechanical04/07/2015
BISMHISSUEDDonnelly Mechanical12/22/2014
BISPLISSUEDA.M. Sage PLG & Heating06/12/2014
BISSPISSUEDM&T Plumbing and Heating Co06/12/2014
BISPLISSUEDNY Plumbing & Heating08/15/2013
BISOTISSUEDPro Concrete Contractors07/24/2013
BISOTISSUEDPro Concrete Contractors06/20/2013
BISPLISSUEDNY Plumbing & Heating08/15/2012
BIS—ISSUEDUnited Alliance Enterprises08/07/2012
BISOTISSUEDJ & N Construction Group10/26/2011
BISEQISSUEDEverest Scaffolding04/06/2011
BISEQISSUEDEverest Scaffolding02/24/2011
BISSPISSUEDM&T Plumbing and Heating Co02/02/2011
BISPLISSUEDM&T Plumbing and Heating Co02/02/2011
BISEQISSUEDTrinity Building and Cons01/31/2011
BISOTISSUEDTrinity Building and Cons01/31/2011
BISOTISSUEDTrinity Building and Cons01/31/2011
BISMHISSUEDTrinity Building and Cons01/31/2011
BIS—ISSUEDTrinity Building and Cons01/04/2011
BISPLISSUEDStarlite Plumbing & Heating05/07/2010
BISOTISSUEDWonder Works Construction05/04/2010
BISMHISSUEDWonder Works Construction05/03/2010
BISPLISSUEDKBM Brand Plumbing and Heating Co04/18/2007
BISMHISSUEDReniss02/09/2007
BISOTISSUEDReniss02/09/2007
+ 16 more permits on file
1 project · most recent 08/05/2026
Water/Sanitary
FiledStatusContractorScope
08/05/2026Permit IssuedGo Greener PlumbingWater/Sanitary
3 projects · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedPrecision Electrical ContGeneral Wiring
06/02/2026CompleteHigh Quality Electric of NYC—
08/12/2022CancelledStar Electrical Contractors—
1 project · most recent 06/11/2026
Sidewalk Shed
FiledStatusContractorScope
06/11/2026Signed-offKings Group NYSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/04/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/03/2026Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/03/2026Energy Code Compliance InspectionsGregory Schnackelprogress
08/03/2026Interior lighting powerGregory Schnackelenergy_progress
06/23/2026Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
06/23/2026Post-installed AnchorsMd Istiaque Hasanspecial
12/20/2021FinalOMAR GAZALIprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.CrewRetailFloor 1
Project M01427444 Alteration · Permit Entire · 08/05/2026
Project M01427101 Alteration · Permit Entire · 08/04/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 426 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00651551-I1Request digital key ↗
08/31/2026M00867420-I1Request digital key ↗
08/16/2026M01415455-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits79
▸BISPLAN / WORK APPROVAL APPLICATION46
04/10/2018140601178Open ↗
01/18/2018123161942Open ↗
01/12/2018123161942Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION28
03/05/2018140601178Open ↗
10/17/2017123161942Open ↗
10/13/2017123161942Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit3
08/16/2026M01427101-I1Open ↗
08/16/2026M01427444-I1Open ↗
08/13/2026M00867420-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications109
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
07/30/2018140601178Open ↗
06/29/2018140601178Open ↗
06/29/2018140601178Open ↗
Showing 3 of 71 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
10/11/2017123161942Open ↗
10/11/2017123161942Open ↗
09/16/2015122362834Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
10/12/2017123161942Open ↗
10/11/2017123161942Open ↗
02/23/2017140601178Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026M00867420-I1Open ↗
08/16/2026M01415455-I1Open ↗
08/16/2026M01427101-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026M01427101-I1Open ↗
08/28/2026M01427101-I1Open ↗
08/25/2026M00651551-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01420055-I1Open ↗
09/01/2026M01420055-I1Open ↗
08/28/2026M01427101-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/23/2017140601178Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/23/2017140601178Open ↗
▸Trade Schedules & Equipment38
▸BISSELF-CERT PLUMBING NOTICE14
12/11/2014120827784Open ↗
08/18/2014120827784Open ↗
07/29/2014120827784Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/18/2018123161942Open ↗
01/12/2018123161942Open ↗
10/11/2017123161942Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
04/30/2015122210516Open ↗
07/18/2014120543484Open ↗
07/09/2014120543484Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/10/2015122210516Open ↗
07/09/2014120543484Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/24/2018123175884Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
10/11/2017123161942Open ↗
01/19/2017122978395Open ↗
05/17/2016122737985Open ↗
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos21
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
10/12/2017123161942Open ↗
10/11/2017123161942Open ↗
01/19/2017122978395Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026M00867420-I1Open ↗
08/16/2026M01427101-I1Open ↗
08/16/2026M01427444-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
01/16/2018122978395Open ↗
12/21/2017123161942Open ↗
12/21/2017123161942Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
01/16/2018122978395Open ↗
12/21/2017123161942Open ↗
10/06/2016122737985Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports5
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/23/2017140601178Open ↗
▸Approvals, Objections & Sign-offs51
▸BISLANDMARKS APPROVAL18
01/26/2018123161942Open ↗
01/16/2018122978395Open ↗
10/11/2017123161942Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
07/30/2018123175884Open ↗
06/29/2018140601178Open ↗
01/26/2018123161942Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
12/16/2014122210516Open ↗
Showing 1 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSHED LETTER1
03/05/2018140601178Open ↗
▸BISLANDMARKS SIGNOFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
06/30/2014120827784Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT34
07/30/2018123175884Open ↗
01/26/2018123161942Open ↗
01/16/2018122978395Open ↗
Showing 3 of 34 on file for this type
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET21
11/29/2017123175884Open ↗
10/11/2017123161942Open ↗
10/11/2017123161942Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION14
06/29/2018140601178Open ↗
05/04/2015120856733Open ↗
03/04/2014120827784Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM7
07/30/2018123175884Open ↗
06/29/2018140601178Open ↗
04/10/2018140601178Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/23/2017140601178Open ↗
Showing 1 of 2 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
06/22/2016122362834Open ↗
05/07/2015120856733Open ↗
Showing 2 of 7 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBSA VARIANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
04/25/2017122978395Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
02/23/2017140601178Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01420055-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01420055-I1Open ↗