Two family frame
91 BOMBAY STREET
STATEN ISLAND · BIN 5175411
💬 Discuss this project
2025Year Built
3Stories
B2Building Class
R3XZoning
2,408 sfGross Floor Area
2Units
Two family frame · Owner of record: BOMBAY RADIGAN LLC · 4,020 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Basement14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIDLE ESTATES704/09/2026
STONE COURT DEVELOPERS604/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT403/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDIA CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NIRO INCGeneral Contractor204/09/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472203/03/2026
Building Lifecycle
All (54)Filed (4)Permit Issued (3)Signed Off (3)Inspection (13)Objection (3)Special Inspection (28)
07/07/2026
Signed off — New Building
PROPOSED PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00953925-I1
06/29/2026
Signed off — New Building
PROPOSED PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00953925-S2
06/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2026
Signed off — New Building
PROPOSED PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00953925-S1
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/09/2026
Objection raised — Scope
03/03/2026
Filed — New Building
PROPOSED PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00953925-P1
03/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Final
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Maintenance information
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Lighting in dwelling units
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Protection of exposed foundation insulation
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
03/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
02/06/2026
Permit issued — Curb Cut
S00953925-S2-CC
01/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/23/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/18/2025
Permit issued — Plumbing
S00953925-S1-PL
07/15/2025
Filed — New Building
PROPOSED PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00953925-S2
07/08/2025
Filed — New Building
PROPOSED PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00953925-S1
06/25/2025
Permit issued — General Construction
S00953925-I1-GC-CX
06/18/2025
Objection resolved — Addressed
12/26/2023
Objection raised — Scope
11/30/2023
Filed — New Building
PROPOSED PLUMBING, GAS, AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00953925-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNIRO INC02/06/2026
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR07/18/2025
DOB NOWGeneral ConstructionPermit IssuedNIRO INC06/25/2025
1 project · most recent 03/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/03/2026Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
1 project · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 03/03/2026
Concrete Wood
FiledStatusContractorScope
03/03/2026Signed-offNIRO INCConcrete, Wood
1 project · most recent 03/03/2026
Earthwork
FiledStatusContractorScope
03/03/2026Signed-offNIRO INCEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
03/02/2026Concrete - Cast-In-PlaceStanislav Pilipenkospecial
03/02/2026Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
03/02/2026Mechanical SystemsStanislav Pilipenkospecial
03/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
03/02/2026Subgrade InspectionsStanislav Pilipenkospecial
03/02/2026Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
03/02/2026Energy Code Compliance InspectionsStanislav Pilipenkoprogress
03/02/2026FinalStanislav Pilipenkoprogress
03/02/2026Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
03/02/2026Footing and FoundationStanislav Pilipenkoprogress
03/02/2026Structural Wood FrameStanislav Pilipenkoprogress
03/02/2026Interior lighting powerStanislav Pilipenkoenergy_progress
03/02/2026HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
03/02/2026Fenestration air leakageStanislav Pilipenkoenergy_progress
03/02/2026HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
03/02/2026Maintenance informationStanislav Pilipenkoenergy_progress
03/02/2026Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
03/02/2026Fenestration areasStanislav Pilipenkoenergy_progress
03/02/2026HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
03/02/2026Lighting in dwelling unitsStanislav Pilipenkoenergy_progress
03/02/2026Protection of exposed foundation insulationStanislav Pilipenkoenergy_progress
03/02/2026Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
03/02/2026Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
03/02/2026Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
03/02/2026Insulation placement and R valuesStanislav Pilipenkoenergy_progress
Latest 25 of 28.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026S00953925-S2Request digital key ↗
08/19/2026S00953925-S1Request digital key ↗
08/15/2026S00953925-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram4
08/15/2026S00953925-P1Open ↗
08/15/2026S00953925-I1Open ↗
08/13/2026S00953925-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00953925-I1Open ↗
08/13/2026S00953925-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00953925-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026S00953925-I1Open ↗
08/19/2026S00953925-P1Open ↗
08/19/2026S00953925-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00953925-P1Open ↗
09/01/2026S00953925-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S00953925-P1Open ↗
09/01/2026S00953925-P1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00953925-P1Open ↗
08/13/2026S00953925-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/13/2026S00953925-I1Open ↗
08/13/2026S00953925-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026S00953925-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026S00953925-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S00953925-P1Open ↗
08/13/2026S00953925-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00953925-I1Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00953925-P1Open ↗
08/13/2026S00953925-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00953925-I1Open ↗
08/13/2026S00953925-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026S00953925-P1Open ↗
08/15/2026S00953925-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026S00953925-I1Open ↗