← Back
BRONX
91 BRUCKNER BOULEVARD
BRONX · BIN 2131317
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation ▸
Locations of Work
Architecture
Roof1 filing · 20 docs
Floor 61 filing · 20 docs
Floor 51 filing · 20 docs
Floor 41 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARTIST CONSTRUCTION109/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91682105/20/2026
KZ ENGINEERING, P.C.4665208/27/2024
A&B WORLD CONSULTING, INC5704102/15/2022
Building Lifecycle
All (177)Filed (37)Permit Issued (29)Signed Off (17)Violation (1)Inspection (13)Objection (80)
07/02/2026
Objection resolved — Open
06/23/2026
Objection raised — Other
05/20/2026
Filed — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-A7
02/27/2026
Signed off — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-S1
01/12/2026
Objection resolved — Addressed
07/03/2025
Signed off — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-S2
06/19/2025
Signed off — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-S4
06/18/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/02/2025
Objection raised — Admin
05/13/2025
Filed — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-A4
05/13/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/23/2025
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE
X00969775-I1
04/23/2025
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00681241-I1
04/23/2025
Signed off — Alteration
X01057718-I1
03/31/2025
Signed off — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-S3
03/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/19/2025
Signed off — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-S7
03/17/2025
Filed — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-A3
03/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/26/2025
Signed off — Alteration
X01060380-I1
02/26/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01079719-I1
02/26/2025
Signed off — Alteration
X01060350-I1
02/26/2025
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01057753-I1
02/24/2025
Objection resolved — Addressed
02/04/2025
Filed — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-A2
01/24/2025
Signed off — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-S6
12/05/2024
Filed — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-A1
12/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2024
Permit issued — Construction Fence
X00969775-I1-FN
11/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/06/2024
Permit issued — Curb Cut
X00657730-S4-CC
10/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2024
Objection raised — Energy
10/15/2024
Permit issued — Foundation
X00657730-S6-FO-EA
10/15/2024
Permit issued — Structural
X00657730-S7-ST
10/08/2024
Signed off — Alteration
Installation of a 4 point suspended scaffold.
X01090511-I1
10/07/2024
Filed — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-P9
09/25/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/20/2024
Permit issued — General Construction
X00657730-I1-GC
08/27/2024
Filed — Alteration
Installation of a 4 point suspended scaffold.
X01090511-P2
08/26/2024
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01079719-P1
08/26/2024
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01057753-P2
08/22/2024
Filed — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-P8
08/19/2024
Permit issued — Suspended Scaffold
X01090511-I1-SC
08/14/2024
Objection raised — Structural
08/14/2024
Objection resolved — Addressed
08/07/2024
Permit issued — Sprinklers
X00657730-S3-EW-SP
08/06/2024
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01057753-P1
08/06/2024
Permit issued — Sprinklers
X00657730-S3-EW-SD
08/05/2024
Filed — Alteration
Installation of a 4 point suspended scaffold.
X01090511-I1
08/01/2024
Signed off — New Building
Installation of combined sprinkler/standpipe system in conjunction with NB X00657730-I1
X00657730-S5
07/16/2024
Permit issued — Supported Scaffold
X01079719-I1-SF
07/15/2024
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01079719-I1
06/24/2024
Signed off — Alteration
X00699956-I1
06/05/2024
Filed — Alteration
X01060380-I1
06/05/2024
Filed — Alteration
X01060350-I1
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offMANHATTAN MANAGEMENT11/13/2024
DOB NOWCurb CutSigned-offMANHATTAN MANAGEMENT11/06/2024
DOB NOWFoundationSigned-offMANHATTAN MANAGEMENT10/15/2024
DOB NOWStructuralSigned-offMANHATTAN MANAGEMENT10/15/2024
DOB NOWGeneral ConstructionPermit IssuedMANHATTAN MANAGEMENT09/20/2024
DOB NOWSuspended ScaffoldSigned-offPRECISION HOIST & SCAFFO*08/19/2024
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC08/07/2024
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC08/06/2024
DOB NOWSupported ScaffoldSigned-offPRECISION HOIST & SCAFFO*07/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*06/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRECISION HOIST & SCAFFO*06/05/2024
DOB NOWSidewalk ShedSigned-offPRECISION HOIST & SCAFFO*06/03/2024
DOB NOWConstruction FenceSigned-offPRECISION HOIST & SCAFFO*06/03/2024
DOB NOWStructuralSigned-offMANHATTAN MANAGEMENT05/13/2024
DOB NOWFoundationSigned-offMANHATTAN MANAGEMENT05/13/2024
DOB NOWMechanical SystemsSigned-offMANHATTAN MANAGEMENT05/13/2024
DOB NOWGeneral ConstructionPermit IssuedMANHATTAN MANAGEMENT05/09/2024
DOB NOWStructuralSigned-offMANHATTAN MANAGEMENT04/12/2024
DOB NOWPlumbingSigned-offAB PLUMBING INC04/02/2024
DOB NOWEarth WorkSigned-offMANHATTAN MANAGEMENT12/06/2023
DOB NOWSupport of ExcavationSigned-offMANHATTAN MANAGEMENT12/05/2023
DOB NOWConstruction FenceSigned-offMANHATTAN MANAGEMENT12/05/2023
DOB NOWEarth WorkSigned-offMANHATTAN MANAGEMENT04/03/2023
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC03/06/2023
DOB NOWSupport of ExcavationSigned-offMANHATTAN MANAGEMENT06/15/2022
DOB NOWEarth WorkSigned-offMANHATTAN MANAGEMENT04/28/2022
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC03/22/2022
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC03/18/2022
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC03/11/2022
1 project · most recent 05/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/20/2026Signed-offMANHATTAN MANAGEMENTHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×54
RXTQ48TBVJUA 48,000 BTU · Vrf Outdoor ×8
Aaon HE1.5JRTV-S11EE-DGN2--WL 16 tons · Packaged Unit ×1
HE10-JRTH-S11AA—DGN—WL 20 tons · Rooftop Unit ×1
Ventilation
Renewaire HE1.5JRTV-S11EE-DGN2--WL 1,450 CFM · Erv ×1
HE10-JRTH-S11AA—DGN—WL 2,000 CFM · Erv ×1
1 project · most recent 05/20/2026
Sprinkler System
FiledStatusContractorScope
05/20/2026Signed-offMETFLOW FIRE CONTROL LLCSprinkler System
1 project · most recent 05/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2026Signed-offCREATIVE PLUMBING INGas, Storm, Water/Sanitary
6 projects · most recent 03/18/2026
General Wiring
FiledStatusContractorScope
03/18/2026CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
11/19/2024CompleteGREEN STAR ELECTL CONT INGeneral Wiring
08/06/2024CompleteSTAR ELEC'L CONTRACTORS C—
06/06/2024CompleteGREEN STAR ELECTL CONT IN—
05/28/2024CompleteNASH ELECTRIC SERVICES IN—
03/18/2022CompleteRICHARD NEU—
1 project · most recent 05/20/2026
Concrete
FiledStatusContractorScope
05/20/2026Signed-offMANHATTAN MANAGEMENTConcrete
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/18/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/13/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
03/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
03/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/19/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/19/2026Energy Code Compliance InspectionsSoorjbally Harilallprogress
05/19/2026Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
05/19/2026MeteringSoorjbally Harilallenergy_progress
05/19/2026Interior lighting powerSoorjbally Harilallenergy_progress
05/19/2026Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
05/19/2026Maintenance informationSoorjbally Harilallenergy_progress
05/19/2026Fenestration areasSoorjbally Harilallenergy_progress
05/19/2026Air barrier - visual inspectionSoorjbally Harilallenergy_progress
05/19/2026Electrical motors and elevatorsSoorjbally Harilallenergy_progress
05/19/2026Exterior lighting powerSoorjbally Harilallenergy_progress
05/19/2026Lighting in dwelling unitsSoorjbally Harilallenergy_progress
05/19/2026Fenestration air leakageSoorjbally Harilallenergy_progress
05/19/2026Insulation placement and R valuesSoorjbally Harilallenergy_progress
05/19/2026Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
05/19/2026Lighting controlsSoorjbally Harilallenergy_progress
05/19/2026Air barrier continuity plan testingSoorjbally Harilallenergy_progress
05/19/2026Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
02/17/2026Maintenance informationSoorjbally Harilallenergy_progress
02/17/2026Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
02/17/2026MeteringSoorjbally Harilallenergy_progress
02/17/2026Interior lighting powerSoorjbally Harilallenergy_progress
02/17/2026Electrical motors and elevatorsSoorjbally Harilallenergy_progress
02/17/2026Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
02/17/2026Lighting controlsSoorjbally Harilallenergy_progress
Latest 25 of 150.
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch37
08/24/2026X00681241-I1Request digital key ↗
08/24/2026X00699956-I1Request digital key ↗
08/22/2026X00969775-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026X00657730-I1Open ↗
08/15/2026X00657730-A7Open ↗
▸Seals & Professional Certifications93
▸DOB NOWDPL-1: Design Professional Seal & Signature37
08/24/2026X00665683-I1Open ↗
08/24/2026X00681241-I1Open ↗
08/22/2026X00969775-P1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/23/2026X00657730-A1Open ↗
09/23/2026X00657730-A1Open ↗
09/23/2026X00657730-A1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/25/2026X01090511-I1Open ↗
09/23/2026X00657730-A1Open ↗
09/05/2026X00657730-P3Open ↗
Showing 3 of 26 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026X00665683-I1Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification7
08/20/2026X00657730-A4Open ↗
08/20/2026X00657730-P9Open ↗
08/20/2026X00657730-P8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026X01090511-P2Open ↗
08/13/2026X01090511-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X01090511-P2Open ↗
08/13/2026X01090511-I1Open ↗