← Back
BuildNYC
MANHATTAN
91 EAST 111TH STREET
MANHATTAN · BIN 1091723
💬 Discuss this project
0Year Built
—Stories
QGBuilding Class
R9Zoning
0 sfGross Floor Area
0Units
2 Active Violations ▸
Owner of record: RYL 91 East 111th Street · 3,078 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTemporary pipe scaffold installationUnder Construction3 filings
RoofTemporary overhead protection installationUnder Construction6p · 2 filings · 20 docs
BulkheadUnder Construction6p · 1 filing · 20 docs
Floor 13Installation of temporary needle beam1 filing · 2 docs
Floor 12Installation of temporary needle beam1 filing · 2 docs
Floor 11Installation of temporary needle beam1 filing · 2 docs
Floor 10
Floor 9
Floor 8Under Construction2p · 1 filing · 20 docs
Floor 7Under Construction2p · 1 filing · 20 docs
Floor 6Under Construction2p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2Walton DevelopersUnder Construction1p · 1 filing
Floor 1Under Construction3p · 1 filing · 20 docs
CellarUnder Construction6p · 1 filing · 20 docs
Site & exteriorWalton DevelopersUnder Construction3 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Walton Developers2710/14/2026
Ramis Realty403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2025$2.1M—RYL 91 EAST 111TH STREET LLC → 91 E 111 LLC— not available
01/10/2020$2.3M—HIC LLC → RYL 91 EAST 111TH STREET LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Innovative Construction NYCGeneral Contractor609/25/2026
Core Scaffold SystemsScaffold609/23/2026
Prime Piping & HeatingFire Protection306/28/2026
Innovative Construction NYCScaffold104/09/2026
KSF ServicesScaffold110/14/2026
Prime Piping & HeatingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161209/24/2026
Pinner Architecture4739105/03/2022
Building Lifecycle
All (104)Filed (24)Permit Issued (18)Violation (2)Inspection (1)Objection (26)Special Inspection (30)Tax Incentive (3)
12/09/2026
485-x construction completed
10/13/2026
Filed — Alteration
INSTALLATION OF OUTRIGGER PLATFORM AND C-49 BRACKET IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01473492-I1
10/13/2026
Permit issued — Protection and Mechanical Methods
M01473492-I1-PMM
10/08/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION M01293643-I1
M01293643-P5
10/08/2026
Violation issued (ECB, open)
Unknown
10/08/2026
Violation issued (ECB, open)
Unknown
10/08/2026
Objection raised — Other
09/29/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01465157-I1
09/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01420165-P1
09/25/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01424834-P1
09/24/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION M01293643-I1
M01293643-P4
09/24/2026
Permit issued — Earth Work
M01293643-S2-FO-EA
09/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2026
Permit issued — Sidewalk Shed
M01420162-I1-SH
09/22/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
09/22/2026
Special inspection requirement — Structural Steel - Welding
SHAHRIAR QUAYYUM
09/22/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
09/22/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
09/22/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
09/22/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
09/03/2026
Filed — Alteration
M01454722-I1
09/03/2026
Permit issued — Protection and Mechanical Methods
M01454722-I1-PMM
08/14/2026
Objection raised — Other
08/10/2026
Permit issued — Earth Work
M01293643-S2-FO-EA
08/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
08/05/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — Structural Steel - Welding
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
08/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
07/30/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
07/30/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
07/30/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
07/30/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
07/30/2026
Special inspection requirement — Deep Foundation Elements
SHAHRIAR QUAYYUM
07/16/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION M01293643-I1
M01293643-P1
07/13/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION M01293643-I1
M01293643-P3
07/07/2026
Filed — New Building
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION M01293643-I1
M01293643-P2
07/02/2026
Permit issued — Supported Scaffold
M01424834-I1-SF
07/01/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01424834-I1
06/26/2026
Filed — Alteration
M01420162-I1
06/26/2026
Permit issued — Sidewalk Shed
M01420162-I1-SH
06/25/2026
Permit issued — Protection and Mechanical Methods
M01420165-I1-PMM
06/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
06/25/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Structural Steel - Welding
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Deep Foundation Elements
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
06/25/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
06/25/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
06/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01420165-I1
06/18/2026
Permit issued — Protection and Mechanical Methods
M01418229-I1-PMM
06/17/2026
Filed — Alteration
M01418229-I1
06/11/2026
485-x registration filed
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedKSF Services10/13/2026
DOB NOWEarth WorkPermit IssuedInnovative Construction NYC09/24/2026
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems09/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems09/03/2026
DOB NOWEarth WorkPermit IssuedInnovative Construction NYC08/10/2026
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems07/02/2026
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems06/26/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems06/25/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems06/18/2026
DOB NOWStructuralPermit IssuedInnovative Construction NYC06/09/2026
DOB NOWFoundationPermit IssuedInnovative Construction NYC06/09/2026
DOB NOWSprinklersPermit IssuedPrime Piping & Heating06/03/2026
DOB NOWSupport of ExcavationPermit IssuedInnovative Construction NYC06/03/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating06/03/2026
DOB NOWStandpipePermit IssuedPrime Piping & Heating06/02/2026
DOB NOWStandpipePermit IssuedPrime Piping & Heating06/02/2026
DOB NOWMechanical SystemsPermit IssuedInnovative Construction NYC06/01/2026
DOB NOWConstruction FencePermit IssuedInnovative Construction NYC11/28/2025
BISEQISSUEDRamis Realty04/23/2002
BIS—ISSUEDRamis Realty04/23/2002
1 project · most recent 10/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/08/2026Permit IssuedInnovative Construction NYCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×24
RXTA24AAVJU 25,800 BTU · Vrf Outdoor ×18
RXTA48AAVJU 47,500 BTU · Vrf Outdoor ×1
Amana PTH153J35 14,400 BTU · Ptac ×1
1 project · most recent 10/08/2026
Sprinkler System
FiledStatusContractorScope
10/08/2026Permit IssuedPrime Piping & HeatingSprinkler System
1 project · most recent 10/08/2026
FiledStatusContractorScope
10/08/2026Permit IssuedPrime Piping & Heating—
7 projects · most recent 10/02/2026
General Wiring
FiledStatusContractorScope
10/02/2026Permit IssuedIntelogic ElectricGeneral Wiring
06/26/2026Permit IssuedSolas Electrical—
06/25/2026Permit IssuedSolas Electrical—
12/17/2025Permit IssuedM.R. Electrical ServiceGeneral Wiring
12/11/2025Permit IssuedFirst Quality Electrical1 meters, 1 new_meters
12/11/2025Permit IssuedFirst Quality ElectricalGeneral Wiring
11/20/2025Permit IssuedHivolts ElectricalGeneral Wiring
1 project · most recent 10/08/2026
Concrete
FiledStatusContractorScope
10/08/2026Permit IssuedInnovative Construction NYCConcrete
2 projects · most recent 10/08/2026
Fence Scaffold
FiledStatusContractorScope
10/08/2026Permit IssuedInnovative Construction NYCFence
09/25/2026Permit IssuedCore Scaffold SystemsScaffold
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
09/22/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
09/22/2026Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
09/22/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
09/22/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
09/22/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
09/22/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
08/05/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
08/05/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
08/05/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
08/05/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
08/05/2026Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
08/05/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
07/30/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
07/30/2026FinalSHAHRIAR QUAYYUMprogress
07/30/2026Deep Foundation ElementsSHAHRIAR QUAYYUMspecial
07/30/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
07/30/2026Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
06/25/2026FinalSHAHRIAR QUAYYUMprogress
06/25/2026Deep Foundation ElementsSHAHRIAR QUAYYUMspecial
06/25/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
06/25/2026FinalSHAHRIAR QUAYYUMprogress
06/25/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
06/25/2026Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
06/25/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
06/25/2026Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
Latest 25 of 83.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
10/14/2026M01473492-I1Request digital key ↗
10/13/2026M01454722-I1Request digital key ↗
10/04/2026M01465157-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
11/24/2025141028965Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/24/2025141028965Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026M01293643-I1Open ↗
08/13/2026M01293643-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026M01293643-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01293643-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature23
10/14/2026M01473492-I1Open ↗
10/13/2026M01454722-I1Open ↗
10/11/2026M01293643-P5Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
10/08/2026M01293643-S8Open ↗
10/08/2026M01293643-S8Open ↗
10/05/2026M01293643-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M01293643-S4Open ↗
09/23/2026M01293643-S4Open ↗
09/01/2026M01293643-P3Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/24/2025141028965Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/24/2025141028965Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026M01293643-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026M01293643-I1—
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
11/24/2025141028965Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026M01293643-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01293643-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
10/05/2026M01293643-P4Open ↗
08/20/2026M01293643-P2Open ↗
08/20/2026M01293643-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026M01293643-S2Open ↗
08/13/2026M01293643-S8Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/24/2025141028965Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/24/2025141028965Open ↗
▸Other Documents6
▸DOB NOWAdjoining Owners Notification2
08/15/2026M01293643-S8Open ↗
08/14/2026M01293643-S2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/24/2025141028965Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M01293643-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01293643-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026M01293643-I1Open ↗