← Back
Miscellaneous two family
91 ST JAMES PLACE
BROOKLYN · BIN 3056136
💬 Discuss this project
1867Year Built
3Stories
B9Building Class
R6BZoning
3,140 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,000 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 20 docs
Floor 3Under Construction26p · 2 filings · 20 docs
Floor 2Under Construction25p · 1 filing · 9 docs
Floor 1Under Construction26p · 2 filings · 20 docs
CellarUnder Construction35p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
91 ST JAMES PLACE1907/08/2026
ISLAND INTERIORS DESIGN103/22/2026
91 ST JAMES803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/30/2018$2.0M—— → —$637/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TWIG CONSULTING ENGINEERS PC612/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND INTERIORS DESIGNGeneral Contractor304/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing207/08/2026
PARK SQUARE ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIG SPECIAL INSPECTIONS885612/17/2025
Building Lifecycle
All (49)Filed (6)Permit Issued (5)Signed Off (1)Violation (1)Inspection (7)Objection (20)Special Inspection (9)
06/15/2026
Permit issued — Plumbing
B00365130-I1-PL
12/29/2025
Signed off — Alteration
NEW AIR COOLED SPLIT AIR CONDITIONING UNITS, DIFFUSERS GRILLES AND DUCTWORK IN CELLAR THRU ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00364981-I1
12/17/2025
Filed — Alteration
NEW AIR COOLED SPLIT AIR CONDITIONING UNITS, DIFFUSERS GRILLES AND DUCTWORK IN CELLAR THRU ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00364981-P3
12/17/2025
Special inspection requirement — Mechanical Systems
Dave Wall
12/17/2025
Special inspection requirement — Final
Dave Wall
11/21/2025
Special inspection requirement — Final
Dave Wall
11/21/2025
Special inspection requirement — Mechanical Systems
Dave Wall
10/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/17/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Inspections
05/29/2025
Objection raised — Other
02/28/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. RENOVATION TO INCLUDE NEW PLUMBING LAYOUT PIPING AND FIXTURES.
B00365130-P1
01/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dave Wall
08/07/2024
Permit issued — Mechanical Systems
B00364981-I1-MS
08/08/2023
Permit issued — Mechanical Systems
B00364981-I1-MS
11/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/28/2022
Permit issued — Mechanical Systems
B00364981-I1-MS
03/29/2022
Permit issued — Plumbing
B00365130-I1-PL
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection resolved — Addressed
07/03/2021
Objection raised — Admin
07/03/2021
Objection raised — Scope
07/03/2021
Objection raised — Fire_Protection
07/03/2021
Objection raised — Zoning
07/03/2021
Objection raised — Scope
07/03/2021
Objection raised — Inspections
07/03/2021
Objection raised — Fire_Protection
07/03/2021
Objection raised — Fire_Protection
06/29/2021
Filed — Alteration
NEW AIR COOLED SPLIT AIR CONDITIONING UNITS, DIFFUSERS GRILLES AND DUCTWORK IN CELLAR THRU ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00364981-P2
06/25/2021
Special inspection requirement — Final
06/25/2021
Special inspection requirement — Mechanical Systems
Dave Wall
04/21/2021
Filed — Alteration
NEW AIR COOLED SPLIT AIR CONDITIONING UNITS, DIFFUSERS GRILLES AND DUCTWORK IN CELLAR THRU ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00364981-P1
03/31/2021
Special inspection requirement — Final
03/31/2021
Special inspection requirement — Mechanical Systems
Dave Wall
10/27/2020
Filed — Alteration
NEW AIR COOLED SPLIT AIR CONDITIONING UNITS, DIFFUSERS GRILLES AND DUCTWORK IN CELLAR THRU ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00364981-I1
10/26/2020
Filed — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. RENOVATION TO INCLUDE NEW PLUMBING LAYOUT PIPING AND FIXTURES.
B00365130-I1
09/18/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC06/15/2026
DOB NOWMechanical SystemsSigned-offISLAND INTERIORS DESIGN08/07/2024
DOB NOWMechanical SystemsSigned-offISLAND INTERIORS DESIGN08/08/2023
DOB NOWMechanical SystemsSigned-offISLAND INTERIORS DESIGN06/28/2022
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC03/29/2022
BISOTISSUEDISLAND INTERIORS DESIGN11/06/2023
BISOTISSUEDISLAND INTERIORS DESIGN11/06/2023
BISOTISSUEDISLAND INTERIORS DESIGN08/08/2023
BISOTISSUEDISLAND INTERIORS DESIGN08/08/2023
BISOTISSUEDISLAND INTERIORS DESIGN08/05/2022
BISOTISSUEDISLAND INTERIORS DESIGN08/05/2022
BISOTISSUEDISLAND INTERIORS DESIGN01/07/2022
BISOTISSUEDISLAND INTERIORS DESIGN01/07/2022
BISOTISSUEDISLAND INTERIORS DESIGN07/14/2021
1 job · most recent 02/28/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/28/2025Permit IssuedROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
1 job · most recent 06/13/2021
General Wiring
FiledStatusContractorScope
06/13/2021Permit IssuedPARK SQUARE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/17/2025Pass-Final PL - UndergroundPassView ↗
11/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/17/2025Mechanical SystemsDave Wallspecial
12/17/2025FinalDave Wallprogress
11/21/2025FinalDave Wallprogress
11/21/2025Mechanical SystemsDave Wallspecial
01/14/2025Fire-Resistant Penetrations and JointsDave Wallspecial
06/25/2021Final—progress
06/25/2021Mechanical SystemsDave Wallspecial
03/31/2021Final—progress
03/31/2021Mechanical SystemsDave Wallspecial
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/19/2026B00364981-P3Request digital key ↗
08/19/2026B00364981-I1Request digital key ↗
08/15/2026B00364981-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/22/2026B00365130-I1Request digital key ↗
08/15/2026B00365130-P1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION9
04/11/2025340749818Open ↗
01/10/2025340749818Open ↗
11/26/2024340749818Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026B00365130-P1Open ↗
08/13/2026B00364981-P1Open ↗
08/13/2026B00364981-P3Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
07/15/2021340749818Open ↗
06/07/2021340749818Open ↗
05/26/2021340749818Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026B00365130-P1Open ↗
08/13/2026B00364981-I1Open ↗
08/13/2026B00364981-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00365130-P1Open ↗
08/29/2026B00364981-P3Open ↗
08/28/2026B00364981-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B00364981-P3Open ↗
08/28/2026B00364981-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/24/2020340749818Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/24/2020340749818Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/02/2020340749818Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/24/2020340749818Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026B00364981-P3Open ↗
08/13/2026B00364981-I1Open ↗
08/13/2026B00365130-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/24/2020340749818Open ↗
▸Energy Compliance1
▸BISNYCECC EXEMPTION1
08/24/2020340749818Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY13
11/04/2025340749818Open ↗
09/26/2025340749818Open ↗
01/13/2025340749818Open ↗
Showing 3 of 13 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/06/2026340749818Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL1
09/26/2025340749818Open ↗
▸BISLANDMARKS APPROVAL1
11/29/2020340749818Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
03/14/2022340749818Open ↗
05/18/2021340749818Open ↗
11/02/2020340749818Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/23/2025340749818Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION9
04/22/2025340749818Open ↗
04/22/2025340749818Open ↗
04/22/2025340749818Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM2
07/15/2021340749818Open ↗
11/02/2020340749818Open ↗
▸BISEFILING COVER SHEET1
11/02/2020340749818Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/24/2020340749818Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/25/2020340749818Open ↗