| Owner | Filings | Most Recent |
|---|---|---|
| NYC School Construction Authority | 112 | 10/14/2026 |
| NYC Department of Housing Preservation and Development | 9 | 03/21/2026 |
| New York City Public School | 8 | 03/22/2026 |
| NYC Department of Education | 7 | 03/22/2026 |
| New York City School Construction | 5 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Dseny Engineering Services | 11 | 09/16/2026 |
| Eme Group/Salas O'Brien | 2 | 02/18/2026 |
| Eme Consulting Engineering and Arch Group | 1 | 02/18/2026 |
| Ysrael A. Seinuk | 2 | 08/19/2025 |
| Massa Multimedia Architects | 2 | 07/21/2025 |
| Keri Engineering | 3 | 07/10/2025 |
| Hartland Engineering | 3 | 07/10/2025 |
| Eme Consulting Engineering Group | 4 | 05/28/2025 |
| DMR Architects | 3 | 10/07/2024 |
| Ame Services | 1 | 07/12/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| Precision 3Sixty NYC | 22 | 03/21/2026 |
| Dseny Engineering Services | 12 | 03/21/2026 |
| Ame Services | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Kel-Tech Construction | Scaffold | 11 | 10/14/2026 |
| Adam's European Contracting | Scaffold | 6 | 07/08/2026 |
| Charan Electrical Enterp's | Electrical | 1 | 03/22/2026 |
| A & S Electric | Electrical | 1 | 03/21/2026 |
| Gemini Electric Co | Electrical | 1 | 03/22/2026 |
| Anco Electl Contctng | Electrical | 1 | 03/22/2026 |
| Quest Electric | Electrical | 1 | 03/21/2026 |
| SMC Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Selectric Electrical Cont Co I | Electrical | 1 | 03/21/2026 |
| E.N.E.L. Electrical | Electrical | 1 | 03/21/2026 |
| S. J. Electric | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| JPC Logistics Dba JPCL EN | 351 | 7 | 02/18/2026 |
| Future Tech Consultants O | 589 | 4 | 07/10/2025 |
| Universal Testing and Ins | 400 | 5 | 06/23/2025 |
| Socotec Engineering | 4983 | 1 | 03/07/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Kel-Tech Construction | 10/13/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Kel-Tech Construction | 09/04/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Kel-Tech Construction | 06/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Kel-Tech Construction | 03/23/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Kel-Tech Construction | 02/11/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Kel-Tech Construction | 12/19/2025 |
| DOB NOW | Construction Fence | Permit Issued | Kel-Tech Construction | 12/04/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Kel-Tech Construction | 10/20/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Adam's European Contracting | 03/04/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | Kel-Tech Construction | 02/13/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Adam's European Contracting | 02/29/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | Adam's European Contracting | 02/28/2023 |
| DOB NOW | Supported Scaffold | Permit Issued | Kel-Tech Construction | 06/30/2022 |
| DOB NOW | Sidewalk Shed | Permit Issued | Adam's European Contracting | 09/29/2021 |
| BIS | PL | ISSUED | Varsity Plumbing and Heating | 12/27/2022 |
| BIS | OT | ISSUED | Pro-Metal Construction | 10/21/2022 |
| BIS | PL | ISSUED | Varsity Plumbing and Heating | 01/03/2022 |
| BIS | OT | ISSUED | Pro-Metal Construction | 11/02/2021 |
| BIS | PL | ISSUED | Varsity Plumbing and Heating | 01/07/2021 |
| BIS | EQ | ISSUED | Pro-Metal Construction | 10/22/2020 |
| BIS | OT | ISSUED | Pro-Metal Construction | 10/22/2020 |
| BIS | PL | ISSUED | Varsity Plumbing and Heating | 01/16/2020 |
| BIS | OT | ISSUED | Pro-Metal Construction | 01/11/2019 |
| BIS | PL | ISSUED | Varsity Plumbing and Heating | 01/11/2019 |
| BIS | EQ | ISSUED | Prime Contractors | 12/19/2018 |
| BIS | EQ | ISSUED | Prime Contractors | 12/19/2018 |
| BIS | EQ | ISSUED | Pro-Metal Construction | 12/05/2018 |
| BIS | MH | ISSUED | KW Tech | 08/07/2017 |
| BIS | OT | ISSUED | Static Electric | 06/15/2017 |
| BIS | OT | ISSUED | Static Electric | 03/08/2017 |
| BIS | MH | ISSUED | KW Tech | 03/01/2017 |
| BIS | PL | ISSUED | Robert Parchment P&H.inc | 03/01/2017 |
| BIS | SP | ISSUED | Leviathan Mechanical | 03/14/2016 |
| BIS | SP | ISSUED | Leviathan Mechanical | 01/23/2015 |
| BIS | OT | ISSUED | R.A.M.S. Mechanical | 10/29/2010 |
| BIS | MH | ISSUED | R.A.M.S. Mechanical | 10/29/2010 |
| BIS | EQ | RE-ISSUED | Scaffolding One | 10/06/2009 |
| BIS | EQ | RE-ISSUED | Scaffolding One | 10/06/2009 |
| BIS | OT | ISSUED | R.A.M.S. Mechanical | 09/22/2009 |
| BIS | PL | ISSUED | V. C. Vitanza Sons | 05/04/2009 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/18/2026 | — | — | Ventilation Systems | Ventilation General Electric PVX7360SJSS 300 CFM · Kitchen Exhaust ×7 |
| 08/19/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Trane 0ADG017C1-DAB5GHG00--J1AJA1AC1-41 D00003C-A00C00A00--AA0A00000--00AL00000 202,300 BTU · Heat Pump Outdoor ×1 WHK036A3S0B**G2E0A1 B1A04010000000000000 31,930 BTU · Heat Pump Outdoor ×1 Ventilation Loren Cook 61 CPV (VF) 200 CFM · Exhaust Fan ×5 60 CPV (VF) 200 CFM · Exhaust Fan ×3 245 CPS 9,000 CFM · Exhaust Fan ×2 330 CPS 14,000 CFM · Exhaust Fan ×2 165C17D (VF) 750 CFM · Exhaust Fan ×1 180C17D (VF2) 4,000 CFM · Exhaust Fan ×1 195C7B 3,380 CFM · Exhaust Fan ×1 402 CPS 15,470 CFM · Exhaust Fan ×1 70 CPV (VF) 200 CFM · Exhaust Fan ×1 80 CPV (VF) 720 CFM · Exhaust Fan ×1 Greenheck FJC-308-BI 720 CFM · Exhaust Fan ×1 |
| 05/28/2025 | — | — | Refrigeration Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/18/2026 | — | — | Water/Sanitary |
| 08/19/2025 | — | — | Storm |
| 05/28/2025 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/06/2025 | Complete | Gemini Electric Co | — |
| 10/28/2024 | Complete | Everest Electric | — |
| 09/12/2023 | Complete | Charan Electrical Enterp's | — |
| 08/08/2023 | Complete | Anco Electl Contctng | General Wiring |
| 03/07/2022 | Permit Issued | Stanco System Electrical Cont | — |
| 02/15/2022 | Complete | Abm Electric | — |
| 02/04/2022 | Complete | Elmhurst Electric | General Wiring |
| 01/12/2022 | Permit Issued | Stanco System Electrical Cont | — |
| 12/01/2020 | Permit Issued | Samco Electric | — |
| 11/27/2019 | Complete | Charan Electrical Enterp's | — |
| 06/18/2019 | Permit Issued | Laser Electrical Contracting | General Wiring |
| 04/09/2019 | Complete | Charan Electrical Enterp's | General Wiring |
| 01/30/2019 | Complete | Milad Contracting | General Wiring |
| 12/14/2018 | Complete | Charan Electrical Enterp's | — |
| 11/07/2018 | Complete | Charan Electrical Enterp's | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2025 | — | — | Steel, Concrete, Masonry |
| 05/28/2025 | — | — | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | — | — | Fence |
| 09/16/2026 | — | — | Sidewalk Shed |
| 09/16/2026 | — | — | Scaffold |
| 11/25/2025 | Permit Issued | Kel-Tech Construction | Sidewalk Shed |
| 01/30/2024 | — | — | Sidewalk Shed |
| 01/30/2024 | Permit Issued | Kel-Tech Construction | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/16/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 07/06/2026 | Post-installed Anchors | — | special |
| 02/18/2026 | Fire-Resistant Penetrations and Joints | Asma Hashmi | special |
| 08/28/2025 | Masonry | — | special |
| 08/22/2025 | Final | Asma Hashmi | progress |
| 08/21/2025 | Fire-Resistance Rated Construction | — | progress |
| 08/15/2025 | Structural Steel - Welding | — | special |
| 08/15/2025 | Final | — | progress |
| 08/15/2025 | Concrete - Cast-In-Place | — | special |
| 08/15/2025 | Post-installed Anchors | — | special |
| 08/15/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 08/15/2025 | Structural Steel - Details | — | special |
| 08/15/2025 | Structural Steel - High Strength Bolting | — | special |
| 07/25/2025 | Fire-Resistant Penetrations and Joints | NELSON LOPEZ | special |
| 07/22/2025 | Subsurface Conditions – Fill Placement & In-Place Density | NELSON LOPEZ | special |
| 07/22/2025 | Final | NELSON LOPEZ | progress |
| 07/22/2025 | Subgrade Inspections | NELSON LOPEZ | special |
| 07/16/2025 | Chimneys and vents | NELSON LOPEZ | special |
| 07/15/2025 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 07/15/2025 | Subgrade Inspections | — | special |
| 07/13/2025 | Post-installed Anchors | — | special |
| 07/13/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 07/13/2025 | Subgrade Inspections | — | special |
| 07/13/2025 | Sprayed fire-resistant materials | — | special |
| 07/13/2025 | Fire-Resistant Penetrations and Joints | — | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Erasmus High School | Education | — | Project B01440008 |
| Erasmus HS | Education | — | Project B01380088 Project B00996064 Project B00996199 Project B00996205 Project B00511222 |
| Erasmus Hall Campus | Education | Sub-basement, Floors 1, 2 | Project B01276405 Project B01214149 |
| I.S. 382K | Education | — | Project B00554744 |