← Back
BuildNYC
Elevator apt, semi-fireproof without stores
9113 COLONIAL ROAD
BROOKLYN · Bay Ridge · BIN 3154610
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
R5BZoning
36,000 sfGross Floor Area
41Units
LL97 CoveredRent Stabilized39 Active Violations 35 unresolved · 4 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 9115 Colonial Associates · 7,000 sf lot · 5.14 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar424 East Assets INC6p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
9115 Colonial Associates1403/22/2026
424 East Assets907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering209/29/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
East Coast MechanicalPlumbing207/08/2026
Atlas Electric ContractorsElectrical103/21/2026
Building Lifecycle
All (70)Filed (2)Permit Issued (3)Signed Off (2)Violation (60)Inspection (2)Special Inspection (1)
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
B
08/05/2026
Violation issued (HPD, open)
C
05/04/2026
Violation issued (HPD, closed)
A
11/15/2025
Violation issued (HPD, closed)
C
11/15/2025
Violation issued (HPD, open)
C
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, open)
B
10/26/2025
Violation issued (HPD, open)
A
10/26/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, open)
B
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, closed)
B
09/21/2025
Violation issued (HPD, open)
C
09/21/2025
Violation issued (HPD, closed)
C
09/21/2025
Violation issued (HPD, closed)
A
09/21/2025
Violation issued (HPD, closed)
A
09/06/2025
Violation issued (HPD, closed)
B
09/04/2025
Violation issued (HPD, open)
C
09/04/2025
Violation issued (HPD, closed)
C
03/05/2025
Violation issued (HPD, closed)
C
03/05/2025
Violation issued (HPD, closed)
C
03/05/2025
Violation issued (HPD, closed)
B
03/05/2025
Violation issued (HPD, closed)
B
03/05/2025
Violation issued (HPD, closed)
B
03/05/2025
Violation issued (HPD, closed)
C
03/05/2025
Violation issued (HPD, open)
C
03/05/2025
Violation issued (HPD, closed)
C
02/26/2025
Violation issued (HPD, closed)
A
02/26/2025
Violation issued (HPD, open)
C
02/26/2025
Violation issued (HPD, closed)
C
02/26/2025
Violation issued (HPD, closed)
B
02/26/2025
Violation issued (HPD, closed)
B
12/31/2024
Violation issued (HPD, closed)
C
12/31/2024
Violation issued (HPD, closed)
A
12/18/2024
Violation issued (HPD, open)
B
11/19/2024
Violation issued (HPD, closed)
C
04/15/2024
Violation issued (ECB, closed)
Elevators
04/10/2024
Violation issued (HPD, closed)
B
04/10/2024
Violation issued (HPD, closed)
C
04/10/2024
Violation issued (HPD, closed)
B
04/10/2024
Violation issued (HPD, closed)
B
04/10/2024
Violation issued (HPD, closed)
C
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, closed)
B
04/10/2024
Violation issued (HPD, closed)
B
04/10/2024
Violation issued (HPD, open)
C
04/09/2024
Violation issued (HPD, closed)
A
02/23/2024
Violation issued (ECB, open)
Elevators
02/01/2024
Violation issued (ECB, open)
Elevators
10/19/2023
Violation issued (HPD, open)
C
10/19/2023
Violation issued (HPD, open)
C
10/19/2023
Violation issued (HPD, open)
C
10/19/2023
Violation issued (HPD, open)
A
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2023
Violation issued (HPD, closed)
A
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offRockway Fuel Oil03/31/2022
DOB NOWPlumbingSigned-offEast Coast Mechanical02/24/2022
DOB NOWPlumbingSigned-offEast Coast Mechanical10/19/2021
BISPLISSUEDMaxwell Plumbing Mechanical11/26/2018
BISOTISSUEDMaxwell Plumbing Mechanical11/14/2018
BISBLISSUEDAtomic Fuel Oil Transport02/01/2016
BISPLISSUEDAurora P & H Cont02/01/2016
BISBLISSUEDDynamic Contracting09/21/2009
BISPLISSUEDDynamic Contracting09/21/2009
BISEQISSUEDBilly Cont04/17/2007
BISEQISSUEDBilly Contractors01/17/2007
BISOTISSUEDJoseph Kalata06/26/2006
BISEQISSUEDMehran Construction07/23/1993
1 project · most recent 10/08/2021
Boiler Controls
FiledStatusContractorScope
10/08/2021CompleteRaleigh Powell Lic ElectricBoiler Controls
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/13/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/24/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/17/2021HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00542101-I1Request digital key ↗
09/01/2026B00542080-I1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION9
11/27/2018321817478Open ↗
11/16/2018321817478Open ↗
11/16/2018321817478Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
08/06/2018321817478Open ↗
09/15/2009320073497Open ↗
▸Seals & Professional Certifications5
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/16/2018321817478Open ↗
09/15/2009320073497Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00542101-I1Open ↗
09/01/2026B00542080-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B00542080-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
09/15/2009320073497Open ↗
09/15/2009320073497Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/06/2018321817478Open ↗
▸BISSCHEDULE B - PLUMBING1
09/15/2009320073497Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
08/06/2018321817478Open ↗
09/15/2009320073497Open ↗
▸BISTenant Protection Plan and Notes1
08/06/2018321817478Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00542101-I1Open ↗
09/01/2026B00542080-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/15/2009320073497Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/05/2018321817478Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/16/2018321817478Open ↗
08/06/2018321817478Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00542080-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/01/2026B00542080-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS1
09/15/2009320073497Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/10/2016320073497Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/10/2016320073497Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
09/05/2018321817478Open ↗
08/06/2018321817478Open ↗
06/10/2016320073497Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/06/2018321817478Open ↗
09/15/2009320073497Open ↗