← Back
Two stories - detached, small or mid-size
912 CASTLETON AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5165410
💬 Discuss this project
2010Year Built
2Stories
A1Building Class
R3AZoning
1,167 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,410 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/29/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281112/29/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
01/02/2026
Permit issued — Solar
S01340414-I1-SL
12/29/2025
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 17 modules, 6.97 KW
S01340414-I1
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/29/2025
Special inspection requirement — Final
Mina Makar
12/29/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR01/02/2026
BIS—ISSUEDPRIME ESTATES INC06/10/2010
BISPLISSUEDCAM ENERGY HEATING AND ME12/28/2009
BIS—ISSUEDPRIME ESTATES INC10/01/2009
BISEQISSUEDPRIME ESTATES INC10/01/2009
BIS—ISSUEDPRIME ESTATES INC09/09/2008
BISEQISSUEDPRIME ESTATES INC09/09/2008
BIS—ISSUEDPRIME ESTATES INC10/18/2007
1 project · most recent 12/29/2025
FiledStatusContractorScope
12/29/2025CompleteISLAND ELECTRIC CORP—
1 project · most recent 12/29/2025
FiledStatusContractorScope
12/29/2025Signed-offMOMENTUM SOLAR34 panels, 13.94 kw, 299 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/29/2025Fire-Resistant Penetrations and JointsMina Makarspecial
12/29/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
12/29/2025Energy Code Compliance InspectionsMina Makarprogress
12/29/2025FinalMina Makarprogress
12/29/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01340414-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026S01340414-I1Open ↗
08/27/2026S01340414-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01340414-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026S01340414-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01340414-I1Open ↗