← Back
Predominantly retail with other uses
912 FLATBUSH AVENUE
BROOKLYN · BIN 3117159
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
C4-4AZoning
10,800 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 912 FLATBUSH AVENUE · 4,000 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 6 docs
Cellar2p · 1 filing · 8 docs
1 job · most recent 07/27/2021
Water/Sanitary
FiledStatusContractorScope
07/27/2021Signed-offJ. CAIAZZO PLBG & HTG CORWater/Sanitary
4 jobs · most recent 04/11/2025
General Wiring
FiledStatusContractorScope
04/11/2025CompletePROFF ELECTRICAL LLC—
04/11/2025CompletePROFF ELECTRICAL LLC—
01/10/2022CompleteJOHN MICHAEL ELEC'L CONTGGeneral Wiring
10/20/2021Permit IssuedRAINBOW ELECTRIC CO., INC—
Building Lifecycle
All (34)Filed (6)Permit Issued (5)Signed Off (4)Violation (5)Inspection (2)Special Inspection (12)
07/24/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - (LOGO REFEREE). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01145727-I1
07/24/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - FOOT LOCKER. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01145728-I1
12/03/2024
Permit issued — Sign
B01145728-I1-SG
12/03/2024
Permit issued — Sign
B01145727-I1-SG
11/26/2024
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - (LOGO REFEREE). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01145727-I1
11/26/2024
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - FOOT LOCKER. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01145728-I1
11/26/2024
Special inspection requirement — Final
ADITYA DESAI
11/26/2024
Special inspection requirement — Final
ADITYA DESAI
05/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2022
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FOOT LOCKER)
B00519120-I1
04/29/2022
Signed off — Alteration
8553 Tenant interior fit-out for Footlocker to include new millwork, Fixtures/finishes,non-bearing Partition, Interior Lighting and controls, installation of interior ductwork distribution. Pro Cert requested. No Change to Egress,Use or occupancy
B00533122-I1
10/20/2021
Permit issued — Sign
B00519120-I1-SG
10/18/2021
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FOOT LOCKER)
B00519120-I1
10/14/2021
Permit issued — General Construction
B00533122-I1-GC-CX
10/01/2021
Filed — Alteration
8553 Tenant interior fit-out for Footlocker to include new millwork, Fixtures/finishes,non-bearing Partition, Interior Lighting and controls, installation of interior ductwork distribution. Pro Cert requested. No Change to Egress,Use or occupancy
B00533122-I1
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
08/26/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2021
Permit issued — Plumbing
B00418422-I1-PL
07/27/2021
Filed — Alteration
PLUMBING WORKTO FIRST FLOOR FOR FOOTLOCKER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00418422-P1
06/02/2021
Special inspection requirement — Final
Nicolas Crosetto
06/02/2021
Special inspection requirement — Duct leakage testing, insulation and design
Nicolas Crosetto
06/02/2021
Special inspection requirement — Insulation placement and R values
Nicolas Crosetto
06/02/2021
Special inspection requirement — Lighting controls
Nicolas Crosetto
06/02/2021
Special inspection requirement — Ventilation and air distribution system
Nicolas Crosetto
06/02/2021
Special inspection requirement — Interior lighting power
Nicolas Crosetto
06/02/2021
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
06/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
05/10/2021
Special inspection requirement — Final
LEON SKVIRSKY
11/19/2020
Filed — Alteration
PLUMBING WORKTO FIRST FLOOR FOR FOOTLOCKER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00418422-I1
04/07/1992
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/1991
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/26/1986
Violation issued (FDNY_NOV, closed)
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOM RECTENWALD CONSTRUCTION103/22/2026
SOL GOLDMAN INVESTMENTS603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZENITH HOME INSPECTIONS211/26/2024
LEON SKVIRSKY PE110/18/2021
TRICARICO ARCHITECTURE AND DESIGN110/01/2021
ASIF JAMIL, RA207/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS203/21/2026
PEROTTO CONSULTING MANAGEMENT203/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIGNSTAR NYCScaffold207/08/2026
JOHN MICHAEL ELEC'L CONTGElectrical103/22/2026
LEWKOWICZ, MIKEElectrical103/21/2026
TOM RECTENWALD CONSTRUCTIGeneral Contractor104/09/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
ACTIVE SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP INSPECTIONS, INC1102110/01/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSIGNSTAR NYC12/03/2024
DOB NOWSignSigned-offSIGNSTAR NYC12/03/2024
DOB NOWSignSigned-offACTIVE SIGNS INC10/20/2021
DOB NOWGeneral ConstructionSigned-offARTUR HOME IMPROVEMENT10/14/2021
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR08/12/2021
BISOTISSUEDTOM RECTENWALD CONSTRUCTI07/21/2021
BISEQISSUEDNY KINGS CONST INC04/10/2006
BISEQISSUEDNY KINGS CONST INC04/10/2006
BISOTISSUEDNY KINGS CONST INC04/10/2006
BIS—ISSUEDAMBROSINO CONSTRUCTION CORP.07/23/1993
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
11/26/2024FinalADITYA DESAIprogress
11/26/2024FinalADITYA DESAIprogress
09/29/2021Energy Code Compliance InspectionsNicolas Crosettoprogress
06/02/2021FinalNicolas Crosettoprogress
06/02/2021Duct leakage testing, insulation and designNicolas Crosettoenergy_progress
06/02/2021Insulation placement and R valuesNicolas Crosettoenergy_progress
06/02/2021Lighting controlsNicolas Crosettoenergy_progress
06/02/2021Ventilation and air distribution systemNicolas Crosettoenergy_progress
06/02/2021Interior lighting powerNicolas Crosettoenergy_progress
06/02/2021Mechanical SystemsNicolas Crosettospecial
06/02/2021Fire-Resistant Penetrations and JointsNicolas Crosettospecial
05/10/2021FinalLEON SKVIRSKYprogress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/01/2026B00533122-I1Request digital key ↗
09/01/2026B00519120-I1Request digital key ↗
08/23/2026B01145727-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00418422-I1Request digital key ↗
08/15/2026B00418422-P1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
08/02/2021340788455Open ↗
07/30/2021340788455Open ↗
11/19/2020340788455Open ↗
▸BISWORK PERMIT APPLICATION1
07/21/2021340788455Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026B01145728-I1Open ↗
08/13/2026B00418422-P1Open ↗
08/13/2026B01145727-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026B00519120-I1Open ↗
08/28/2026B01145728-I1Open ↗
08/27/2026B01145727-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00533122-I1Open ↗
08/26/2026B00533122-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/19/2020340788455Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/19/2020340788455Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/19/2020340788455Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026B01145728-I1Open ↗
08/13/2026B00533122-I1Open ↗
08/13/2026B00418422-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/19/2020340788455Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/19/2020340788455Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/19/2020340788455Open ↗
▸BISNYCECC ANALYSIS1
11/19/2020340788455Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/21/2021340788455Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00533122-I1Open ↗
▸Inspections & Test Reports2
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/21/2021340788455Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/19/2020340788455Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/19/2020340788455Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/19/2020340788455Open ↗
▸BISADDITIONAL INFORMATION1
08/02/2021340788455Open ↗