Condo, residential tower (mixed-use, multi-family elevator) [derived]
914 EAST NEW YORK AVENUE
BROOKLYN · Prospect Lefferts Gardens-Wingate · BIN 3429898
💬 Discuss this project
2023Year Built
8Stories
RMBuilding Class
R7-1Zoning
40,543 sfGross Floor Area
50Units
2 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 908 PLAZA LLC · 9,737 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1 filing
Floor 2Under Construction7p · 1 filing · 16 docs
Floor 1Under Construction6p · 2 filings · 16 docs
Site & exterior6 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1704/09/2026
ABECO CONSTRUCTION1504/09/2026
991 PLAZA904/09/2026
MAJOR ELEVATOR CORP.203/22/2026
908 PLAZA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAAD1105/22/2026
RSLN ARCHITECTURE PLLC508/13/2025
PAUL PERDEK, PROF. ENG. PLLC905/05/2023
LMW ENGINEERING GROUP LLC505/11/2022
STROH ENGINEERING SERVICES, P.C.110/25/2021
AGE ENGINEERING, LLC310/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGN803/21/2026
AE DESIGN SOLUTION1803/21/2026
YOUR EXPEDITER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABECO CONSTRUCTION LLCGeneral Contractor2304/09/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1204/09/2026
P.H. WORKS INCPlumbing507/08/2026
F.S. WORKS INCFire Protection307/08/2026
TITAN ELECL ELEV CONTR 003407General Contractor303/22/2026
JOSEPH VITALEElectrical303/21/2026
DESIGN N SAFETY INCGeneral Contractor304/09/2026
DYO DESIGN OFFICE LLCElectrical203/21/2026
S & J INDUSTRIAL CORPFire Protection107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
P H WORKSGeneral Contractor104/09/2026
TITAN ELEC'L & ELEV CONTRElectrical103/22/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJ ENGINEERING & DESIGN55461905/22/2026
Building Lifecycle
All (203)Filed (34)Permit Issued (33)Signed Off (17)Violation (2)Inspection (15)Objection (72)Special Inspection (30)
05/26/2026
Special inspection requirement — Sprinkler Systems
Magdy Youssef
05/22/2026
Filed — Alteration
SPRINKLER SYSTEM MODIFICATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01269125-P1
03/19/2026
Special inspection requirement — Sprinkler Systems
Magdy Youssef
02/27/2026
Signed off — Alteration
SPRINKLER SYSTEM MODIFICATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01269125-I1
02/25/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/05/2026
Violation issued (ECB, open)
Elevators
01/29/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/22/2025
Permit issued — Mechanical Systems
B01269125-S2-MS
10/21/2025
Permit issued — Sprinklers
B01269125-S1-EW-SP
09/26/2025
Filed — Alteration
SPRINKLER SYSTEM MODIFICATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01269125-S2
09/26/2025
Filed — Alteration
SPRINKLER SYSTEM MODIFICATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01269125-S1
09/26/2025
Permit issued — General Construction
B01269125-I1-GC
09/09/2025
Objection raised — Scope
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Cost
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
08/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Magdy Youssef
08/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Magdy Youssef
08/27/2025
Objection resolved — Addressed
08/26/2025
Objection raised — Scope
08/26/2025
Objection raised — Scope
08/26/2025
Objection raised — Scope
08/13/2025
Filed — Alteration
SPRINKLER SYSTEM MODIFICATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01269125-I1
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Magdy Youssef
08/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Magdy Youssef
08/11/2025
Special inspection requirement — Mechanical Systems
Magdy Youssef
08/11/2025
Special inspection requirement — Interior lighting power
Magdy Youssef
08/11/2025
Special inspection requirement — Final
Magdy Youssef
08/11/2025
Special inspection requirement — Lighting controls
Magdy Youssef
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
07/28/2025
Violation issued (ECB, open)
Elevators
07/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2025
Objection resolved — Addressed
02/06/2025
Objection raised — Other
01/30/2025
Filed — New Building
Sprinkler, Standpipe, Plumbing work in conjunction with New Building
B00482269-B2
09/24/2024
Signed off — Alteration
B00367299-I1
09/24/2024
Signed off — Alteration
B00367306-I1
09/06/2024
Signed off — New Building
Sprinkler, Standpipe, Plumbing work in conjunction with New Building
B00482269-S4
06/14/2024
Signed off — Alteration
B00367294-I1
06/14/2024
Signed off — New Building
Sprinkler, Standpipe, Plumbing work in conjunction with New Building
B00482269-S5
06/07/2024
Objection resolved — Addressed
06/04/2024
Signed off — Alteration
B00538704-I1
06/04/2024
Objection resolved — Addressed
05/30/2024
Signed off — New Building
Sprinkler, Standpipe, Plumbing work in conjunction with New Building
B00482269-Z2
05/30/2024
Objection raised — Fire_Protection
05/30/2024
Objection raised — Scope
05/28/2024
Filed — New Building
Sprinkler, Standpipe, Plumbing work in conjunction with New Building
B00482269-B1
05/23/2024
Signed off — New Building
Sprinkler, Standpipe, Plumbing work in conjunction with New Building
B00482269-S1
05/23/2024
Signed off — New Building
Sprinkler, Standpipe, Plumbing work in conjunction with New Building
B00482269-S2
05/23/2024
Special inspection requirement — Maintenance information
Magdy Youssef
05/23/2024
Special inspection requirement — Metering
Magdy Youssef
05/23/2024
Special inspection requirement — Electrical motors and elevators
Magdy Youssef
05/23/2024
Special inspection requirement — Mechanical Systems
Magdy Youssef
05/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
05/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Magdy Youssef
05/23/2024
Special inspection requirement — Final
Magdy Youssef
Latest 60 of 203 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedABECO CONSTRUCTION LLC10/22/2025
DOB NOWSprinklersSigned-offF.S. WORKS INC10/21/2025
DOB NOWGeneral ConstructionSigned-offABECO CONSTRUCTION LLC09/26/2025
DOB NOWStandpipeSigned-offF.S. WORKS INC04/08/2024
DOB NOWSprinklersSigned-offF.S. WORKS INC04/08/2024
DOB NOWStandpipeSigned-offP.H. WORKS INC03/26/2024
DOB NOWPlumbingSigned-offP.H. WORKS INC12/08/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/21/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC08/21/2023
DOB NOWStandpipeSigned-offP.H. WORKS INC06/14/2023
DOB NOWMechanical SystemsSigned-offABECO CONSTRUCTION LLC04/27/2023
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC04/27/2023
DOB NOWConstruction FenceSigned-offABECO CONSTRUCTION LLC04/27/2023
DOB NOWSprinklersSigned-offS & J INDUSTRIAL CORP04/20/2023
DOB NOWSprinklersSigned-offP.H. WORKS INC12/13/2022
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC12/06/2022
DOB NOWMechanical SystemsSigned-offABECO CONSTRUCTION LLC12/06/2022
DOB NOWConstruction FenceSigned-offABECO CONSTRUCTION LLC12/06/2022
DOB NOWStructuralSigned-offABECO CONSTRUCTION LLC12/06/2022
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC11/17/2022
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC11/04/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC09/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC09/01/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC09/01/2022
DOB NOWPlumbingSigned-offP.H. WORKS INC06/09/2022
DOB NOWStructuralSigned-offABECO CONSTRUCTION LLC02/11/2022
DOB NOWFoundationSigned-offABECO CONSTRUCTION LLC01/07/2022
DOB NOWConstruction FenceSigned-offABECO CONSTRUCTION LLC12/23/2021
DOB NOWSupport of ExcavationSigned-offABECO CONSTRUCTION LLC11/17/2021
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC11/15/2021
DOB NOWConstruction FenceSigned-offDESIGN N SAFETY INC01/11/2021
DOB NOWConstruction FenceSigned-offDESIGN N SAFETY INC01/06/2021
2 projects · most recent 05/22/2026
Heating Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/22/2026Permit IssuedABECO CONSTRUCTION LLCHeating Systems
Heating
Vulcan LB-5500 8,532 BTU · Radiant ×4
01/30/2025Signed-offCORE SCAFFOLD SYSTEMS INCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Islandaire EZDR122 11,800 BTU · Ptac ×212
Fujitsu AOUA72ULBV5 72,000 BTU · Vrf Outdoor ×4
AOUA192ULBV5 192,000 BTU · Vrf Outdoor ×2
AOUG15LZAS1 14,500 BTU · Condensing Unit ×1
AOU18RLXFWH 18,000 BTU · Condensing Unit ×1
Greenheck ECV-10L-VG-F 600 CFM · Erv ×2
Heating
Qmark EFF4008 13,700 BTU · Electric Heater ×14
MUH-05 17,000 BTU · Electric Heater ×8
MUH-10 10,200 BTU · Electric Heater ×6
2 projects · most recent 05/22/2026
Sprinkler System
FiledStatusContractorScope
05/22/2026Signed-offF.S. WORKS INCSprinkler System
01/30/2025Signed-offF.S. WORKS INCSprinkler System
1 project · most recent 01/30/2025
Storm Water/Sanitary
FiledStatusContractorScope
01/30/2025Signed-offP.H. WORKS INCStorm, Water/Sanitary
6 projects · most recent 06/25/2025
General Wiring
FiledStatusContractorScope
06/25/2025CompleteTITAN ELEC'L & ELEV CONTR—
12/27/2022CompleteACCURATE ELEC'L CORP.General Wiring
11/20/2022CompleteACCURATE ELEC'L CORP.1 meters, 1 new_meters
10/28/2022CancelledR.C.M. ELECTRIC CORP.—
08/31/2022CompleteSOLAS ELECTRICAL CORP—
08/24/2021CompleteV. VASS ELECTRIC CORP—
1 project · most recent 01/30/2025
Concrete
FiledStatusContractorScope
01/30/2025Signed-offF.S. WORKS INCConcrete
1 project · most recent 01/30/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
01/30/2025Signed-offF.S. WORKS INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/25/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/29/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/19/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/20/2022Pass-Final PL - UndergroundPassView ↗
06/21/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
05/26/2026Sprinkler SystemsMagdy Youssefspecial
03/19/2026Sprinkler SystemsMagdy Youssefspecial
08/28/2025Energy Code Compliance InspectionsMagdy Youssefprogress
08/28/2025HVAC-R and service water piping design and insulationMagdy Youssefenergy_progress
08/13/2025Fire-Resistance Rated ConstructionMagdy Youssefprogress
08/13/2025Energy Code Compliance InspectionsMagdy Youssefprogress
08/11/2025Mechanical SystemsMagdy Youssefspecial
08/11/2025Lighting controlsMagdy Youssefenergy_progress
08/11/2025Interior lighting powerMagdy Youssefenergy_progress
08/11/2025Fire-Resistant Penetrations and JointsMagdy Youssefspecial
08/11/2025FinalMagdy Youssefprogress
05/23/2024Energy Code Compliance InspectionsMagdy Youssefprogress
05/23/2024MeteringMagdy Youssefenergy_progress
05/23/2024FinalMagdy Youssefprogress
05/23/2024Mechanical SystemsMagdy Youssefspecial
05/23/2024Maintenance informationMagdy Youssefenergy_progress
05/23/2024Fire-Resistant Penetrations and JointsMagdy Youssefspecial
05/23/2024Electrical motors and elevatorsMagdy Youssefenergy_progress
04/05/2024Post-installed AnchorsMagdy Youssefspecial
04/05/2024HVAC-R and service water piping design and insulationMagdy Youssefenergy_progress
04/05/2024HVAC-R and service water heating system controlsMagdy Youssefenergy_progress
04/05/2024HVAC-R and service water heating equipmentMagdy Youssefenergy_progress
04/05/2024Energy Code Compliance InspectionsMagdy Youssefprogress
04/05/2024Sprinkler SystemsMagdy Youssefspecial
04/05/2024Maintenance informationMagdy Youssefenergy_progress
Latest 25 of 95.
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch31
09/01/2026B00538704-I1Request digital key ↗
09/01/2026B00582680-I1Request digital key ↗
09/01/2026B00582676-P1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
09/02/2026B00367306-I1Request digital key ↗
09/02/2026B00367294-I1Request digital key ↗
09/02/2026B00367299-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
11/06/2024322119514Open ↗
10/24/2024322119514Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00482269-I1Open ↗
08/13/2026B00482269-B2Open ↗
08/13/2026B00482269-A1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00482269-A1Open ↗
08/13/2026B00482269-I1Open ↗
08/13/2026B00482269-B2Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/06/2024322119514Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/06/2024322119514Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/06/2024322119514Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/06/2024322119514Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00482269-I1Open ↗
▸Seals & Professional Certifications111
▸DOB NOWProgress Inspector Seal & Signature41
10/04/2026B00582676-I1Open ↗
09/01/2026B00482269-B1Open ↗
09/01/2026B00482269-B1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/02/2026B00482269-S3Open ↗
09/01/2026B00482269-B1Open ↗
09/01/2026B00482269-B1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/01/2026B00538704-I1Open ↗
09/01/2026B00582680-I1Open ↗
09/01/2026B00582676-P1Open ↗
Showing 3 of 34 on file for this type
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sanitary Sewer Certification (HCP/SC)4
08/13/2026B00482269-S4Open ↗
08/13/2026B00482269-A8Open ↗
08/13/2026B00482269-A9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00482269-B2Open ↗
08/13/2026B00482269-I1Open ↗
08/13/2026B00482269-A1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026B00482269-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/15/2026B00482269-A1Open ↗
08/15/2026B00482269-I1Open ↗
08/13/2026B00482269-B2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00482269-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00482269-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00482269-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/31/2026B00614024-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00482269-S5Open ↗
08/13/2026B00482269-S4Open ↗
08/13/2026B00482269-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00482269-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWHydrant Flow Test Letter4
08/28/2026B00482269-A9Open ↗
08/28/2026B00482269-S4Open ↗
08/28/2026B00482269-A8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWConcrete Testing Exception Report2
08/13/2026B00482269-S1Open ↗
08/13/2026B00482269-S2Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026B00482269-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00482269-I1Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
11/06/2024322119514Open ↗
11/06/2024322119514Open ↗
11/06/2024322119514Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
10/24/2024322119514Open ↗
▸Other Documents21
▸DOB NOWHydraulic Calculations4
08/13/2026B00482269-S4Open ↗
08/13/2026B00482269-A8Open ↗
08/13/2026B00482269-A9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSURVEY: INITIAL4
08/13/2026B00482269-A1Open ↗
08/13/2026B00482269-B2Open ↗
08/13/2026B00482269-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B00482269-B2Open ↗
08/13/2026B00482269-A1Open ↗
08/13/2026B00482269-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00482269-I1Open ↗
08/13/2026B00482269-B2Open ↗
08/13/2026B00482269-A1Open ↗
▸DOB NOWPD1 Document3
08/13/2026B00482269-B2Open ↗
08/13/2026B00482269-I1Open ↗
08/13/2026B00482269-A1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/06/2024322119514Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00482269-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00482269-S3Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00482269-I1Open ↗