← Back
Primarily 1 family with 1 store or office
914 PELHAM PARKWAY SOUTH
BRONX · Morris Park · BIN 2049494
💬 Discuss this project
1933Year Built
2Stories
S1Building Class
R6Zoning
2,646 sfGross Floor Area
2Units
0 Open Violations
Primarily 1 family with 1 store or office · 4,231 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 225p · 3 filings · 20 docs
Floor 121p · 2 filings · 20 docs
Cellar21p · 2 filings · 20 docs
Basement6p · 1 filing · 20 docs
Sub-Basement18p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/11/2022$810K—— → —$306/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CAESAR BUSTAMANTE, AIA1806/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WSCONSULTANT & EXPEDITING SERVICES3603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGHLAND PLUMBING LLCPlumbing507/08/2026
PRIME 7 CONSTRUCTION GRPGeneral Contractor303/21/2026
VREX CONSTR INCGeneral Contractor203/21/2026
ED.EN CONSTRUCTION INCGeneral Contractor107/08/2026
VREX CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.67811303/26/2025
Building Lifecycle
All (167)Filed (18)Permit Issued (9)Signed Off (5)Violation (20)Inspection (7)Objection (80)Special Inspection (28)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
CAESAR BUSTAMANTE
06/20/2025
Special inspection requirement — Energy Code Compliance Inspections
CAESAR BUSTAMANTE
06/20/2025
Special inspection requirement — Lighting in dwelling units
CAESAR BUSTAMANTE
06/17/2025
Objection resolved — Addressed
06/16/2025
Objection raised — Cost
06/11/2025
Filed — Alteration CO
FILING ALTERATION FOR CONVERSION OF ONE FAMILY TO 2 FAMILY DWELLING, WITH AMENDED COFO
X07999336-P5
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/19/2025
Objection raised — Admin
05/14/2025
Objection raised — Energy
05/09/2025
Filed — Alteration CO
FILING ALTERATION FOR CONVERSION OF ONE FAMILY TO 2 FAMILY DWELLING, WITH AMENDED COFO
X07999336-P4
05/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
CAESAR BUSTAMANTE
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
CAESAR BUSTAMANTE
05/05/2025
Special inspection requirement — Lighting in dwelling units
CAESAR BUSTAMANTE
04/17/2025
Signed off — Alteration
filing for modification of bathroom and kitchen with new plumbing fixtures and removal of tub on ground floor.
X08000074-I1
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/07/2025
Signed off — Alteration
REMOVAL OF 1 COMMERCIAL GAS BOILER AND INSTALL AND REGISTER ONE (1) NEW NAVIEN COMBI-BOILER IN THE BASEMENT WITH SERVICE THE COMMERCIAL SPACE IN BASEMENT.
X01113812-S3
04/07/2025
Signed off — Alteration
REMOVAL OF 1 COMMERCIAL GAS BOILER AND INSTALL AND REGISTER ONE (1) NEW NAVIEN COMBI-BOILER IN THE BASEMENT WITH SERVICE THE COMMERCIAL SPACE IN BASEMENT.
X01113812-S2
04/07/2025
Signed off — Alteration
REMOVAL OF 1 COMMERCIAL GAS BOILER AND INSTALL AND REGISTER ONE (1) NEW NAVIEN COMBI-BOILER IN THE BASEMENT WITH SERVICE THE COMMERCIAL SPACE IN BASEMENT.
X01113812-S1
04/07/2025
Signed off — Alteration
REMOVAL OF 1 COMMERCIAL GAS BOILER AND INSTALL AND REGISTER ONE (1) NEW NAVIEN COMBI-BOILER IN THE BASEMENT WITH SERVICE THE COMMERCIAL SPACE IN BASEMENT.
X01113812-I1
04/04/2025
Objection resolved — Addressed
04/02/2025
Objection raised — Other
03/26/2025
Filed — Alteration
filing for modification of bathroom and kitchen with new plumbing fixtures and removal of tub on ground floor.
X08000074-P8
03/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/19/2025
Permit issued — Mechanical Systems
X01113812-S1-MS
02/05/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/28/2025
Permit issued — Boiler Equipment
X01113812-S3-BE
01/28/2025
Permit issued — Boiler Equipment
X01113812-S2-BE
01/10/2025
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/03/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
12/24/2024
Objection raised — Other
12/24/2024
Objection raised — Other
12/18/2024
Filed — Alteration
REMOVAL OF 1 COMMERCIAL GAS BOILER AND INSTALL AND REGISTER ONE (1) NEW NAVIEN COMBI-BOILER IN THE BASEMENT WITH SERVICE THE COMMERCIAL SPACE IN BASEMENT.
X01113812-S3
12/18/2024
Filed — Alteration
REMOVAL OF 1 COMMERCIAL GAS BOILER AND INSTALL AND REGISTER ONE (1) NEW NAVIEN COMBI-BOILER IN THE BASEMENT WITH SERVICE THE COMMERCIAL SPACE IN BASEMENT.
X01113812-S2
12/18/2024
Filed — Alteration
REMOVAL OF 1 COMMERCIAL GAS BOILER AND INSTALL AND REGISTER ONE (1) NEW NAVIEN COMBI-BOILER IN THE BASEMENT WITH SERVICE THE COMMERCIAL SPACE IN BASEMENT.
X01113812-P1
12/17/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
12/17/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/17/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/10/2024
Permit issued — Boiler Equipment
X01113812-I1-BE
12/03/2024
Objection resolved — Addressed
12/03/2024
Objection resolved — Addressed
12/03/2024
Objection resolved — Addressed
12/03/2024
Objection resolved — Addressed
12/03/2024
Objection resolved — Addressed
12/03/2024
Objection resolved — Addressed
12/03/2024
Objection resolved — Addressed
12/03/2024
Objection resolved — Addressed
11/02/2024
Filed — Alteration
filing for modification of bathroom and kitchen with new plumbing fixtures and removal of tub on ground floor.
X08000074-P6
10/30/2024
Objection raised — Other
10/30/2024
Objection raised — Other
10/30/2024
Objection raised — Other
10/30/2024
Objection raised — Other
10/30/2024
Objection raised — Other
10/30/2024
Objection raised — Zoning
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offVREX CONSTR02/19/2025
DOB NOWBoiler EquipmentSigned-offHIGHLAND PLUMBING LLC01/28/2025
DOB NOWBoiler EquipmentSigned-offHIGHLAND PLUMBING LLC01/28/2025
DOB NOWBoiler EquipmentSigned-offHIGHLAND PLUMBING LLC12/10/2024
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC07/03/2024
DOB NOWGeneral ConstructionPermit IssuedED.EN CONSTRUCTION INC10/10/2023
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC05/11/2023
DOB NOWGeneral ConstructionPermit IssuedVREX CONSTRUCTION INC04/12/2023
DOB NOWGeneral ConstructionPermit IssuedPRIME 7 CONSTRUCTION GRP02/15/2023
1 project · most recent 09/26/2023
General Wiring
FiledStatusContractorScope
09/26/2023CompleteHI-RITE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/05/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/20/2025Fire-Resistance Rated ConstructionCAESAR BUSTAMANTEprogress
06/20/2025Energy Code Compliance InspectionsCAESAR BUSTAMANTEprogress
06/20/2025Lighting in dwelling unitsCAESAR BUSTAMANTEenergy_progress
05/05/2025Fire-Resistance Rated ConstructionCAESAR BUSTAMANTEprogress
05/05/2025Energy Code Compliance InspectionsCAESAR BUSTAMANTEprogress
05/05/2025Lighting in dwelling unitsCAESAR BUSTAMANTEenergy_progress
04/11/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/22/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/10/2025Heating SystemsCHRISTIAN LOZADAspecial
01/10/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/17/2024Heating SystemsCHRISTIAN LOZADAspecial
12/17/2024Heating SystemsCHRISTIAN LOZADAspecial
12/17/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/17/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/17/2024Heating SystemsCHRISTIAN LOZADAspecial
12/17/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/30/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/22/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
10/22/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
10/18/2024FinalCHRISTIAN LOZADAprogress
10/18/2024Mechanical SystemsCHRISTIAN LOZADAspecial
07/08/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/24/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/10/2024Lighting in dwelling unitsCAESAR BUSTAMANTEenergy_progress
04/10/2024Energy Code Compliance InspectionsCAESAR BUSTAMANTEprogress
Latest 25 of 28.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/23/2026X07999336-P5Request digital key ↗
08/23/2026X07999336-P4Request digital key ↗
08/23/2026X07999336-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X07999336-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/23/2026X07999336-P1Open ↗
08/23/2026X07999336-P4Open ↗
08/23/2026X07999336-P5Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026X01113812-I1Open ↗
09/23/2026X01113812-S3Open ↗
09/23/2026X01113812-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026X01113812-S1Open ↗
08/28/2026X07999336-P3Open ↗
08/28/2026X07999336-P3Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/13/2026X07999336-I1Open ↗
08/13/2026X07999336-P1Open ↗
08/13/2026X07999336-P3Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/23/2026X07999336-P5Open ↗
08/23/2026X07999336-P4Open ↗
08/23/2026X07999336-P1Open ↗
Showing 3 of 18 on file for this type
▸Other Documents6
▸DOB NOWProperty Ownership Certification5
08/23/2026X07999336-P5Open ↗
08/23/2026X07999336-P4Open ↗
08/23/2026X07999336-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X07999336-I1Open ↗