← Back
Primarily 2 family with 1 store or office
916 KINGS HIGHWAY
BROOKLYN · Gravesend (East)-Homecrest · BIN 3177599
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
C4-2Zoning
2,170 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 916 KINGS HIGHWAY LLC · 1,458 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof2p · 1 filing · 19 docs
Floor 111p · 2 filings · 20 docs
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
916 KINGS HWY LLC103/22/2026
916 KINGS HIGHWAY LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI808/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor603/21/2026
KJK ELECTRIC INCElectrical103/22/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394408/14/2025
Building Lifecycle
All (35)Filed (8)Permit Issued (3)Signed Off (2)Violation (9)Inspection (5)Special Inspection (8)
08/28/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND CELLAR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES;MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL KITCHEN IN THE FIRST FLOOR. INSTALL NEW ADA TOILET AS PER PLAN
B01182220-I1
08/28/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR AND CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01182224-I1
08/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/15/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
08/15/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
08/14/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND CELLAR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES;MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL KITCHEN IN THE FIRST FLOOR. INSTALL NEW ADA TOILET AS PER PLAN
B01182220-P3
08/14/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
08/14/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
08/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/25/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND CELLAR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES;MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL KITCHEN IN THE FIRST FLOOR. INSTALL NEW ADA TOILET AS PER PLAN
B01182220-P2
07/23/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR AND CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01182224-P3
07/22/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
07/22/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
06/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/22/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR AND CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01182224-P2
04/08/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND CELLAR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES;MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL KITCHEN IN THE FIRST FLOOR. INSTALL NEW ADA TOILET AS PER PLAN
B01182220-P1
04/08/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR AND CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01182224-P1
04/08/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
04/08/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
02/21/2025
Permit issued — Mechanical Systems
B01182220-I1-MS
02/21/2025
Permit issued — General Construction
B01182220-I1-GC
02/19/2025
Permit issued — Plumbing
B01182224-I1-PL
02/18/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND CELLAR WITH GENERAL CONSTRUCTION: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES;MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL KITCHEN IN THE FIRST FLOOR. INSTALL NEW ADA TOILET AS PER PLAN
B01182220-I1
02/18/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR AND CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01182224-I1
12/04/2024
Violation issued (HPD, closed)
I
11/28/2023
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2007
Violation issued (ECB, closed)
Construction
11/21/2007
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKALE CONSTRUCTION INC02/21/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC02/21/2025
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC02/19/2025
1 project · most recent 08/13/2025
General Wiring
FiledStatusContractorScope
08/13/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/15/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
08/15/2025FinalFARHAD BASSIRI-TEHRANIprogress
08/14/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
08/14/2025FinalFARHAD BASSIRI-TEHRANIprogress
07/22/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
07/22/2025FinalFARHAD BASSIRI-TEHRANIprogress
04/08/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
04/08/2025FinalFARHAD BASSIRI-TEHRANIprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01182224-P1Request digital key ↗
08/21/2026B01182224-I1Request digital key ↗
08/21/2026B01182224-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01182224-P1Open ↗
08/21/2026B01182224-I1Open ↗
08/21/2026B01182224-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01182220-P1Open ↗
08/31/2026B01182220-I1Open ↗
08/25/2026B01182220-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01182220-P1Open ↗
08/31/2026B01182220-I1Open ↗
08/25/2026B01182220-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01182220-I1Open ↗
08/21/2026B01182220-P2Open ↗
08/13/2026B01182220-P3Open ↗