← Back
Primarily 4 family with 1 store or office
917 BROADWAY
BROOKLYN · BIN 3071868
💬 Discuss this project
1931Year Built
3Stories
S4Building Class
R6Zoning
4,125 sfGross Floor Area
5Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: B 917 BROADWAY REALTY LLC · 2,500 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof13p · 5 filings · 20 docs
Floor 613p · 3 filings · 20 docs
Floor 513p · 3 filings · 20 docs
Floor 415p · 3 filings · 20 docs
Floor 317p · 4 filings · 20 docs
Floor 218p · 4 filings · 20 docs
Floor 113p · 4 filings · 20 docs
Cellar16p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BIG DREAM DEVELOPERS3607/08/2026
OWNERS GC NY3004/09/2026
B 917 BROADWAY REALTY LLC103/22/2026
917 BROADWAY REALTY1003/22/2026
CORP SKYLINE BUILDERS NYC103/22/2026
OWNER GC NY LLC103/22/2026
OWNER OF 917 BROADWAY303/22/2026
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YORK TOWER CONSULTING ENGINEERING310/29/2024
A&D ENGINEERING, PLLC406/04/2024
R & O ENGINEERING112/07/2022
ASHRAF CORP209/20/2022
KAO HWA LEE ARCHITECTS PC102/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AJ SERVICE EXPERTS1003/21/2026
BAC Developers Group403/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN D ENTERPRISESGeneral Contractor804/09/2026
SKYLINE BUILDERS NYC CORPGeneral Contractor707/08/2026
POWER DIRECT ELECTRIC INCElectrical303/22/2026
OWNERS GC NY LLCGeneral Contractor307/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616710/29/2024
Building Lifecycle
All (160)Filed (11)Permit Issued (18)Signed Off (8)Violation (60)Inspection (3)Objection (30)Special Inspection (30)
02/24/2025
Signed off — Alteration
Mechanical System filed in conjunction with Alt 1 job #321596607
B00373221-I1
02/19/2025
Signed off — Alteration
Structural filed in conjunction with Alt 1 job #321596607
B00373225-I1
11/20/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/20/2024
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
11/20/2024
Special inspection requirement — Structural Steel - Welding
FAHAD FATEH
11/20/2024
Special inspection requirement — Structural Steel - High Strength Bolting
FAHAD FATEH
11/20/2024
Special inspection requirement — Final
FAHAD FATEH
11/20/2024
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
11/13/2024
Objection resolved — Addressed
11/12/2024
Objection raised — Other
10/29/2024
Filed — Alteration
Structural filed in conjunction with Alt 1 job #321596607
B00373225-P1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/08/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
08/08/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
08/08/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
08/08/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
08/08/2024
Special inspection requirement — Final
FAHAD FATEH
08/08/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
08/01/2024
Objection resolved — Addressed
07/08/2024
Signed off — Alteration
Plumbing and Sprinkler system filed in conjunction with Alt 1 job #321596607
B00373223-I1
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
06/26/2024
Objection raised — Scope
06/26/2024
Objection raised — Fire_Protection
06/24/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/24/2024
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
06/24/2024
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
06/24/2024
Special inspection requirement — Structural Steel - High Strength Bolting
FAHAD FATEH
06/24/2024
Special inspection requirement — Structural Steel - Welding
FAHAD FATEH
06/24/2024
Special inspection requirement — Final
FAHAD FATEH
06/11/2024
Objection raised — Scope
06/04/2024
Filed — Alteration
Mechanical System filed in conjunction with Alt 1 job #321596607
B00373221-P1
05/27/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/27/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
05/27/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
05/27/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
05/27/2024
Special inspection requirement — Final
FAHAD FATEH
05/27/2024
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
05/27/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
05/15/2024
Objection raised — Other
05/15/2024
Objection resolved — Addressed
05/14/2024
Filed — Alteration
Plumbing and Sprinkler system filed in conjunction with Alt 1 job #321596607
B00373223-P1
05/02/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
05/02/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/02/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/09/2024
Violation issued (HPD, closed)
A
04/09/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/04/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/02/2024
Signed off — Alteration
Structural filed in conjunction with Alt 1 job #321596607
B00373225-S1
04/01/2024
Signed off — Alteration
Application filed for rear wall removal and partial Demo, sequence, and shoring work as per plans. All foundation, load bearing, and party walls to remain. In conjunction with ALT 1 #321596607
B08048243-I1
03/29/2024
Permit issued — Sprinklers
B00373223-I1-EW-SP
03/29/2024
Permit issued — Sprinklers
B00373223-I1-PL
03/26/2024
Signed off — Alteration
Construction fence
B00679008-I1
03/26/2024
Permit issued — Mechanical Systems
B00373221-I1-MS
12/28/2023
Permit issued — General Construction
B08048243-I1-GC-CX
12/28/2023
Permit issued — Construction Fence
B00679008-I1-FN
Latest 60 of 160 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC03/29/2024
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN03/29/2024
DOB NOWMechanical SystemsSigned-offSKYLINE BUILDERS NYC CORP03/26/2024
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS NYC CORP12/28/2023
DOB NOWConstruction FenceSigned-offSKYLINE BUILDERS NYC CORP12/28/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES09/18/2023
DOB NOWStructuralPermit IssuedSKYLINE BUILDERS NYC CORP07/07/2023
DOB NOWPlumbingSigned-offA M B MECHANICAL INC04/04/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN04/04/2023
DOB NOWConstruction FenceSigned-offSKYLINE BUILDERS NYC CORP02/16/2023
DOB NOWStructuralSigned-offSKYLINE BUILDERS NYC CORP01/12/2023
DOB NOWStructuralSigned-offSKYLINE BUILDERS NYC CORP01/12/2023
DOB NOWGeneral ConstructionSigned-offOWNERS GC NY LLC12/12/2022
DOB NOWStructuralSigned-offOWNERS GC NY LLC12/12/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES09/21/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES09/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES09/20/2022
DOB NOWConstruction FenceSigned-offOWNERS GC NY LLC02/18/2022
BIS—ISSUEDSKYLINE BUILDERS NYC CORP11/01/2023
BIS—ISSUEDSKYLINE BUILDERS NYC CORP04/19/2023
BIS—ISSUEDSKYLINE BUILDERS NYC CORP01/25/2023
BIS—ISSUEDSKYLINE BUILDERS NYC CORP01/25/2023
BIS—ISSUEDOWNERS GC NY LLC05/26/2022
BIS—ISSUEDOWNERS GC NY LLC05/25/2022
BISFBISSUEDAMBASSADOR FUEL & OIL CORP05/10/2001
3 projects · most recent 04/09/2024
General Wiring
FiledStatusContractorScope
04/09/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
07/10/2023CompletePOWER DIRECT ELECTRIC INC—
08/10/2022CompleteSOLAS ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/09/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/04/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/19/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
11/20/2024Post-installed AnchorsFAHAD FATEHspecial
11/20/2024Structural Steel - DetailsFAHAD FATEHspecial
11/20/2024Structural Steel - WeldingFAHAD FATEHspecial
11/20/2024Structural Steel - High Strength BoltingFAHAD FATEHspecial
11/20/2024FinalFAHAD FATEHprogress
11/20/2024Structural Cold-Formed SteelFAHAD FATEHspecial
08/08/2024Maintenance informationFAHAD FATEHenergy_progress
08/08/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
08/08/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
08/08/2024Shutoff dampersFAHAD FATEHenergy_progress
08/08/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
08/08/2024FinalFAHAD FATEHprogress
08/08/2024Mechanical SystemsFAHAD FATEHspecial
06/24/2024Post-installed AnchorsFAHAD FATEHspecial
06/24/2024Structural Cold-Formed SteelFAHAD FATEHspecial
06/24/2024Structural Steel - DetailsFAHAD FATEHspecial
06/24/2024Structural Steel - High Strength BoltingFAHAD FATEHspecial
06/24/2024Structural Steel - WeldingFAHAD FATEHspecial
06/24/2024FinalFAHAD FATEHprogress
05/27/2024Mechanical SystemsFAHAD FATEHspecial
05/27/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
05/27/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
05/27/2024Maintenance informationFAHAD FATEHenergy_progress
05/27/2024FinalFAHAD FATEHprogress
05/27/2024HVAC insulation and sealing FAHAD FATEHenergy_progress
Latest 25 of 30.
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch5
08/28/2026B08006380-I1Request digital key ↗
08/28/2026B08004924-I1Request digital key ↗
08/28/2026B08048243-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00373223-I1Request digital key ↗
08/15/2026B00373223-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00373223-I1Request digital key ↗
08/15/2026B00373223-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00373221-I1Request digital key ↗
08/15/2026B00373221-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/14/2026B00373225-I1Request digital key ↗
08/14/2026B00373225-P1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION17
06/25/2024321596607Open ↗
05/23/2024321596607Open ↗
02/29/2024321596607Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION6
01/25/2023321596607Open ↗
01/25/2023321596607Open ↗
01/25/2023321596607Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/13/2024321596607Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
07/25/2022321596607Open ↗
01/29/2021321596607Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/31/2020321596607Open ↗
▸BISVERIFY TAX LOT1
08/21/2024321596607Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/14/2024321596607Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/31/2020321596607Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00679008-I1Open ↗
08/13/2026B00373221-I1Open ↗
08/13/2026B00373225-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B00373221-P1Open ↗
08/31/2026B00373221-P1Open ↗
08/31/2026B00373221-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026B00373221-P1Open ↗
08/31/2026B00373221-I1Open ↗
08/27/2026B00373223-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/08/2022321596607Open ↗
▸Trade Schedules & Equipment6
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/08/2024321596607Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/08/2024321596607Open ↗
▸BISSPRINKLER SYSTEMS1
07/08/2024321596607Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/08/2024321596607Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/08/2024321596607Open ↗
▸BISHEATING SYSTEMS1
07/08/2024321596607Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
07/26/2022321596607Open ↗
06/29/2020321596607Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: ACP51
05/24/2022321596607Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B08048243-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/08/2024321596607Open ↗
03/27/2023321596607Open ↗
07/13/2022321596607Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/08/2024321596607Open ↗
▸BISINTERIOR LIGHTING POWER1
07/08/2024321596607Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/08/2024321596607Open ↗
▸BISFENESTRATION AREAS1
07/08/2024321596607Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/08/2024321596607Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/08/2024321596607Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/08/2024321596607Open ↗
▸BISLIGHTING CONTROLS1
07/08/2024321596607Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/01/2024321596607Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/08/2022321596607Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
07/08/2024321596607Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/08/2024321596607Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00373223-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00373221-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/27/2023321596607Open ↗
07/13/2022321596607Open ↗
01/28/2021321596607Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/16/2024321596607Open ↗
06/08/2022321596607Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/08/2022321596607Open ↗
06/08/2022321596607Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/08/2024321596607Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
07/08/2024321596607Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/08/2024321596607Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/08/2024321596607Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/08/2024321596607Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/08/2024321596607Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
07/08/2024321596607Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
07/08/2024321596607Open ↗
▸BISSOIL REPORT1
06/29/2020321596607Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/29/2020321596607Open ↗
▸BISMECHANICAL SYSTEMS1
07/08/2024321596607Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE8
02/29/2024321596607Open ↗
02/28/2024321596607Open ↗
01/28/2021321596607Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
02/27/2025321596607Open ↗
02/24/2025321596607Open ↗
08/16/2024321596607Open ↗
Showing 3 of 5 on file for this type
▸BISMECHANICAL (MH) SIGNOFF1
02/27/2025321596607Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
01/27/2021321596607Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
01/25/2023321596607Open ↗
06/08/2022321596607Open ↗
▸BISCOST AFFIDAVIT1
06/29/2020321596607Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/27/2025321596607Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/05/2022321596607Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION8
08/16/2024321596607Open ↗
08/16/2024321596607Open ↗
08/16/2024321596607Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET1
02/07/2020321596607Open ↗
▸Other Documents6
▸BISSHUTOFF DAMPERS1
07/08/2024321596607Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
07/25/2022321596607Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
07/08/2024321596607Open ↗
▸BISMAINTENANCE INFORMATION1
07/08/2024321596607Open ↗
▸BISPLOT DIAGRAM1
07/13/2022321596607Open ↗
▸BISPD11
08/16/2024321596607Open ↗