919 BEDFORD AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3048952
💬 Discuss this project
1901Year Built
5Stories
C0Building Class
R7AZoning
6,382 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 2,000 sf lot · 3.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof4p · 2 filings · 20 docs
Bulkhead3p · 3 filings · 20 docs
Penthouse7p · 3 filings · 20 docs
Floor 55p · 1 filing · 20 docs
Floor 45p · 2 filings · 20 docs
Floor 32p · 2 filings · 15 docs
Floor 23p · 2 filings · 20 docs
Floor 15p · 4 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Basement2p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEWKIRK GARDENS4007/08/2026
BEDFORD REALTY HOLDINGS903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2019$1.7M—— → —$262/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
EXPEDITING 4 U1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor1207/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor603/21/2026
A. M. PLUMBING COMPANYPlumbing207/08/2026
S&R ELECTRICAL & MECHANICElectrical203/22/2026
LLOYD G DRUMMOND PLBG&GENFire Protection107/08/2026
YOSEF BLAUElectrical103/21/2026
S R ELECTRICAL MECHANIC 005147General Contractor103/22/2026
LEANDRO DICKSONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168906/16/2022
Building Lifecycle
All (80)Filed (12)Permit Issued (10)Signed Off (6)Violation (12)Inspection (2)Objection (8)Special Inspection (30)
11/18/2025
Violation issued (HPD, closed)
I
04/08/2024
Violation issued (HPD, closed)
A
11/17/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, closed)
A
12/30/2022
Violation issued (ECB, open)
Construction
11/04/2022
Violation issued (HPD, closed)
I
07/20/2022
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION TO ALT 1 JOB #321588457
B00358818-I1
07/12/2022
Signed off — Alteration
B00384983-I1
07/08/2022
Signed off — Alteration
Sprinkler application filed in conjunction with Alt 1 #321588457.
B00384289-I1
07/05/2022
Signed off — Alteration
B00358758-I1
07/05/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/30/2022
Signed off — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH ALT 1 JOB #321588457.
B00389292-I1
06/29/2022
Permit issued — Mechanical Systems
B00358758-I1-MS
06/29/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/28/2022
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
06/28/2022
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
06/28/2022
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
06/28/2022
Special inspection requirement — Structural Cold-Formed Steel
SOORJBALLY HARILALL
06/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
06/28/2022
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
06/28/2022
Special inspection requirement — Final
Soorjbally Harilall
06/23/2022
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
06/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/17/2022
Objection resolved — Addressed
06/16/2022
Filed — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH ALT 1 JOB #321588457.
B00389292-P1
06/16/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
06/16/2022
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
06/16/2022
Special inspection requirement — Maintenance information
Soorjbally Harilall
06/16/2022
Special inspection requirement — HVAC and service water heating equipment
Soorjbally Harilall
06/16/2022
Special inspection requirement — HVAC insulation and sealing
Soorjbally Harilall
06/16/2022
Special inspection requirement — HVAC and service water heating system controls
Soorjbally Harilall
06/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/08/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION TO ALT 1 JOB #321588457
B00358818-P3
06/06/2022
Objection raised — Scope
05/31/2022
Filed — Alteration
Sprinkler application filed in conjunction with Alt 1 #321588457.
B00384289-P1
05/24/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
05/24/2022
Special inspection requirement — HVAC insulation and sealing
Soorjbally Harilall
05/24/2022
Special inspection requirement — Maintenance information
Soorjbally Harilall
05/24/2022
Special inspection requirement — HVAC and service water heating equipment
Soorjbally Harilall
05/24/2022
Special inspection requirement — HVAC and service water heating system controls
Soorjbally Harilall
05/24/2022
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
05/12/2022
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
05/12/2022
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
05/12/2022
Special inspection requirement — Structural Cold-Formed Steel
SOORJBALLY HARILALL
05/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
05/12/2022
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
05/12/2022
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
05/12/2022
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
05/09/2022
Permit issued — Plumbing
B00358818-I1-PL
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
01/14/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION TO ALT 1 JOB #321588457
B00358818-P2
12/23/2021
Permit issued — Sprinklers
B00384289-I1-EW-SP
10/29/2021
Filed — Alteration
Sprinkler application filed in conjunction with Alt 1 #321588457.
B00384289-I1
10/19/2021
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION TO ALT 1 JOB #321588457
B00358818-P1
09/20/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00527210-I1
09/01/2021
Permit issued — Structural
B00389292-I1-ST
09/01/2021
Permit issued — Construction Fence
B00384983-I1-FN
06/25/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00527210-P1
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP06/29/2022
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY05/09/2022
DOB NOWSprinklersSigned-offLLOYD G. DRUMMOND12/23/2021
DOB NOWStructuralSigned-offMJH CONSTRUCTION CORP09/01/2021
DOB NOWConstruction FenceSigned-offMJH CONSTRUCTION CORP09/01/2021
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES05/28/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES05/28/2021
DOB NOWStructuralSigned-offMJH CONSTRUCTION CORP04/28/2021
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY04/20/2021
DOB NOWConstruction FenceSigned-offMJH CONSTRUCTION CORP10/19/2020
BIS—ISSUEDMJH CONSTRUCTION CORP11/09/2021
BIS—ISSUEDMJH CONSTRUCTION CORP11/09/2021
BIS—ISSUEDMJH CONSTRUCTION CORP04/28/2021
BIS—ISSUEDMJH CONSTRUCTION CORP04/28/2021
4 projects · most recent 07/28/2022
General Wiring
FiledStatusContractorScope
07/28/2022CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
03/07/2022CompleteHIRSCHEL ELECTRICAL INC.General Wiring
05/25/2021CompleteV. VASS ELECTRIC CORP—
11/18/2020CompleteS&R ELECTRIC & CONTRACTI*—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/05/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/29/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
06/28/2022Structural Steel - WeldingSOORJBALLY HARILALLspecial
06/28/2022Structural Steel - DetailsSOORJBALLY HARILALLspecial
06/28/2022Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
06/28/2022Structural Cold-Formed SteelSOORJBALLY HARILALLspecial
06/28/2022Structural Stability – Alterations of existing buildingsSOORJBALLY HARILALLspecial
06/28/2022Post-installed AnchorsSOORJBALLY HARILALLspecial
06/28/2022FinalSoorjbally Harilallprogress
06/23/2022Sprinkler SystemsSOORJBALLY HARILALLspecial
06/23/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
06/16/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
06/16/2022Energy Code Compliance InspectionsSoorjbally Harilallprogress
06/16/2022Maintenance informationSoorjbally Harilallenergy_progress
06/16/2022HVAC and service water heating equipment Soorjbally Harilallenergy_progress
06/16/2022HVAC insulation and sealing Soorjbally Harilallenergy_progress
06/16/2022HVAC and service water heating system controls Soorjbally Harilallenergy_progress
06/16/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/24/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
05/24/2022HVAC insulation and sealing Soorjbally Harilallenergy_progress
05/24/2022Maintenance informationSoorjbally Harilallenergy_progress
05/24/2022HVAC and service water heating equipment Soorjbally Harilallenergy_progress
05/24/2022HVAC and service water heating system controls Soorjbally Harilallenergy_progress
05/24/2022Energy Code Compliance InspectionsSoorjbally Harilallprogress
05/24/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/12/2022Sprinkler SystemsSOORJBALLY HARILALLspecial
05/12/2022Post-installed AnchorsSOORJBALLY HARILALLspecial
Latest 25 of 47.
▾Documents — 200 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00358818-I1Request digital key ↗
09/02/2026B00358818-P1Request digital key ↗
09/02/2026B00358818-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch2
09/01/2026B00527210-P1Request digital key ↗
09/01/2026B00527210-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/31/2026B00384289-I1Request digital key ↗
08/15/2026B00384289-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/01/2026B00389292-P1Request digital key ↗
08/14/2026B00389292-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00384983-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00358758-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION14
08/15/2022340754892Open ↗
08/04/2022340754892Open ↗
07/29/2022340754892Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION6
04/29/2021321588457Open ↗
04/29/2021321588457Open ↗
04/29/2021321588457Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
09/20/2022340754892Open ↗
09/07/2022340754892Open ↗
08/21/2020340754892Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/22/2022321588457Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
07/14/2021321588457Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
07/14/2021321588457Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM3
11/05/2021321588457Open ↗
08/23/2021321588457Open ↗
07/30/2021321588457Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/02/2020321588457Open ↗
▸BISVERIFY TAX LOT1
07/26/2022321588457Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/02/2020321588457Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
09/02/2020321588457Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/29/2022321588457Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/02/2020321588457Open ↗
▸Seals & Professional Certifications41
▸DOB NOWSpecial Inspector Seal & Signature14
09/02/2026B00384289-P1Open ↗
09/01/2026B00358818-P3Open ↗
09/01/2026B00358818-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00527210-P1Open ↗
09/01/2026B00527210-I1Open ↗
08/13/2026B00384289-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00358818-P3Open ↗
09/01/2026B00358818-P3Open ↗
09/01/2026B00358818-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/29/2021321588457Open ↗
04/16/2021321588457Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/21/2020340754892Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/21/2020340754892Open ↗
▸Trade Schedules & Equipment3
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
09/28/2022321588457Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/29/2022321588457Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/29/2022321588457Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST5
09/07/2022340754892Open ↗
08/23/2021321588457Open ↗
07/30/2021321588457Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
04/29/2021321588457Open ↗
04/16/2021321588457Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/14/2021321588457Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/21/2020340754892Open ↗
▸BISSTREET TREE SIGNOFF1
07/26/2022321588457Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026B00358758-I1Open ↗
08/13/2026B00384289-I1Open ↗
08/13/2026B00358818-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/29/2021321588457Open ↗
04/16/2021321588457Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/14/2021321588457Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
08/22/2022321588457Open ↗
08/22/2022321588457Open ↗
06/30/2022321588457Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/29/2021321588457Open ↗
04/20/2021321588457Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/30/2022321588457Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00358758-I1Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY15
08/22/2022321588457Open ↗
08/22/2022321588457Open ↗
08/22/2022321588457Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
10/06/2022321588457Open ↗
04/29/2021321588457Open ↗
04/16/2021321588457Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
04/29/2021321588457Open ↗
04/16/2021321588457Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
07/14/2021321588457Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/02/2020321588457Open ↗
▸BISSOIL REPORT1
09/02/2020321588457Open ↗
▸Approvals, Objections & Sign-offs17
▸BISLETTERS - SUPPORTING DOCUMENTATION10
09/07/2022340754892Open ↗
08/23/2021321588457Open ↗
07/14/2021321588457Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
06/02/2022321588457Open ↗
10/27/2021321588457Open ↗
10/25/2021321588457Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT4
11/05/2021321588457Open ↗
08/23/2021321588457Open ↗
07/30/2021321588457Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
07/14/2021321588457Open ↗
04/29/2021321588457Open ↗
04/16/2021321588457Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
07/14/2021321588457Open ↗
04/29/2021321588457Open ↗
04/16/2021321588457Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/02/2020321588457Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/27/2022321588457Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION17
10/05/2022321588457Open ↗
09/07/2022340754892Open ↗
06/03/2022321588457Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET1
09/01/2020321588457Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/21/2020340754892Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/07/2022340754892Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
06/29/2022321588457Open ↗
09/02/2020321588457Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/02/2020321588457Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/24/2021340754892Open ↗