HPD05/21/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD05/21/2026§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD05/21/2026§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD04/22/2026§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SINK IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD04/22/2026867 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CONDUCIVE TO PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAPS OR CRACKS IN WALLS,CEILINGS, FLOORS, FIXING LEAKS AND MANAGE GARBAGE IN PUBLIC AREAS. EVIDENCE FOUND AT RATS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
ECB10/10/2025A TIME OF INSPECTION, OBSERVE TWO STORY BUILDING PLUMBING WORK IN CELLAR COMPLETED WITHOUT PERMIT. ERECTED 3 -PIECE BATHROOM CONSISTING OF SINK TOILET AND SHOWER STALL AND INSTALL KITCHEN SINK AND RELATED PLUMBHearing held — result not yet published$2K proposed
ECB10/10/2025A TIME OF INSPECTION, OBSERVE TWO STORY BUILDING, CELLAR PARTITIONED WITH FULL HEIGHT WALLS SUBDIVIDING SPACE INTO A CLASS A 3-BEDROOM APARTMENT WITH SEPARATE ROOMS. NO PERMIT ON RECORD FOR ALTERATION OF CELLARHearing held — result not yet published$2K proposed
ECB10/10/2025A TIME OF INSPECTION, OBSERVED TWO STORY BUILDING IN THE CELLAR ELECTRICAL WORK COMPLETE THROUGHOUT CELLAR WITH-OUT PERMIT, INSTALLED WALL OUTLETS, CEILING LIGHT FIXTURES/SWITCHES AND ELECTRICAL RECEPTACLES, FOHearing held — result not yet published$2K proposed
ECB10/10/2025A.T.O.I. OBSERVED TWO STORY BUILDING, CELLAR CONVERTED INTO A 3-BEDROOM CLASS A APARTMENT, OCCUPIED BY THREE MALES AND TWO FEMALES' FULL HEIGHT PARTITION WAS ERECTED CREATING BEDROOMS, FULL KITCHEN WITH ELECTRIHearing held — result not yet published$1K proposed