← Back
Two stories - detached, small or mid-size
92-11 50 AVENUE
QUEENS · Elmhurst · BIN 4046024
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R5Zoning
1,750 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,375 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR107/17/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281107/17/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/15/2025
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 11 modules, 4.51 KW
Q01257159-I1
07/21/2025
Permit issued — Solar
Q01257159-I1-SL
07/17/2025
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 11 modules, 4.51 KW
Q01257159-I1
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
07/16/2025
Special inspection requirement — Final
Mina Makar
07/16/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR07/21/2025
1 project · most recent 07/17/2025
FiledStatusContractorScope
07/17/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/16/2025Fire-Resistant Penetrations and JointsMina Makarspecial
07/16/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
07/16/2025Energy Code Compliance InspectionsMina Makarprogress
07/16/2025FinalMina Makarprogress
07/16/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01257159-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q01257159-I1Open ↗
08/27/2026Q01257159-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026Q01257159-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01257159-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01257159-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01257159-I1Open ↗