HPD04/14/2020§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING A DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT THE METAL SECURITY DOOR AT THE BUILDING ENTRANCE
Three families · 2,000 sf lot · 1.61 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.