92-24 ROCKAWAY BEACH BOULEVARD
QUEENS · BIN 4445329
💬 Discuss this project
1929Year Built
3Stories
Y2Building Class
R6AZoning
32,670 sfGross Floor Area
2Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Police Department · Owner of record: NYC Police Department · 27,299 sf lot · 1.2 FAR built · Flood zone AE
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 3 docs
Floor 31 filing · 3 docs
Floor 21 filing · 3 docs
Floor 1New York Police Department2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction2803/21/2026
NYPD403/22/2026
NYC Department of General Services203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chanda Engineering Consultant106/23/2022
Herbert Kunstadt Associates111/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Herbert Kunstadt Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RNH Electric CompanyElectrical203/22/2026
Klein WilliamElectrical103/21/2026
The Franklin Co. ContElectrical103/21/2026
Building Lifecycle
All (30)Filed (2)Violation (18)Special Inspection (10)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2023
Violation issued (FDNY_ORDER, closed)
06/23/2022
Filed — Alteration
Q00761424-I1
03/07/2022
Violation issued (ECB, open)
Boilers
11/18/2019
Filed — Alteration
REPLACEMENT OF THE BOILER AND THE HEATING SYSTEM FOR THE BUILDING. THERE WILL BE 2 BOILERS SERVING THE BUILDING. NEW FINTUBE ELEMENTS WILL BE ADDED.
Q00203871-I1
08/01/2019
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
HERBERT KUNSTADT
08/01/2019
Special inspection requirement — Mechanical Systems
08/01/2019
Special inspection requirement — Heating Systems
08/01/2019
Special inspection requirement — Final
HERBERT KUNSTADT
08/01/2019
Special inspection requirement — Lowest Floor Elevation
HERBERT KUNSTADT
08/01/2019
Special inspection requirement — HVAC and service water heating system controls
08/01/2019
Special inspection requirement — HVAC and service water heating equipment
08/01/2019
Special inspection requirement — Permanent certificate
08/01/2019
Special inspection requirement — Maintenance information
08/01/2019
Special inspection requirement — HVAC insulation and sealing
06/30/2015
Violation issued (FDNY_ORDER, closed)
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFSISSUEDMichael S. Kaplan04/25/2022
BISOTISSUEDGryphon Construction12/22/2021
BISOTISSUEDGryphon Construction12/22/2021
BISMHISSUEDGryphon Construction12/22/2021
BISFSISSUEDMichael S. Kaplan03/24/2021
BISOTISSUEDGryphon Construction03/16/2021
BISMHISSUEDGryphon Construction03/16/2021
BISOTISSUEDGryphon Construction03/16/2021
BISOTISSUEDGryphon Construction03/15/2021
BISOTISSUEDGryphon Construction06/22/2020
BISOTISSUEDGryphon Construction06/22/2020
BISMHISSUEDGryphon Construction06/22/2020
BISOTISSUEDGryphon Construction10/09/2019
BISOTISSUEDGryphon Construction10/09/2019
BISMHISSUEDGryphon Construction10/09/2019
BISPLISSUEDThe Plumbing Company06/01/2005
BISOTISSUEDOrba Construction05/26/2005
BISEQISSUEDOrba Construction05/26/2005
BISOTISSUEDOrba Construction05/16/2005
BISEQISSUEDOrba Construction05/16/2005
BISEQISSUEDLilly Construction Co03/31/2005
BISEQISSUEDLilly Construction Co03/21/2005
BISEQISSUEDLilly Construction Co02/02/2005
BISEQISSUEDLilly Construction Co02/02/2005
BISEQISSUEDOrba Construction01/24/2005
BISEQISSUEDLilly Construction Co06/29/2004
BISEQISSUEDLilly Construction Co06/29/2004
BISOTISSUEDOrba Construction06/22/2004
BISEQISSUEDOrba Construction06/22/2004
BISPLISSUEDQueens, the Mechanical05/26/2004
BISPLISSUEDJohn Cannetti Plumbing10/31/2003
BISEQISSUEDSafway Service10/24/2003
BISEQISSUEDSafeway Steel Products06/18/2003
BISPLISSUEDThe PLG Co04/11/2003
BISOTISSUEDThe PLG Co04/11/2003
BISOTISSUEDThe Franklin Comany Cont*04/25/2002
BISOTISSUEDUnico Service03/13/1995
BISOTISSUEDTechnique Contracting Co02/28/1995
BISPLISSUEDAph Universal PLG and Heating09/07/1994
BISOTISSUEDTechnique Contracting Co08/19/1994
1 project · most recent 11/18/2019
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/18/2019——Heating Systems
Heating
Aerco Benchmark 1500 3,000,000 BTU · Condensing Unit ×2
3 projects · most recent 10/20/2022
General Wiring
FiledStatusContractorScope
10/20/2022CompleteRNH Electric CompanyGeneral Wiring
11/12/2019CompleteRNH Electric Company—
04/05/2018CompleteLeone Electric CoGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/01/2019Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)HERBERT KUNSTADTspecial
08/01/2019Mechanical Systems—special
08/01/2019Heating Systems—special
08/01/2019FinalHERBERT KUNSTADTprogress
08/01/2019Lowest Floor ElevationHERBERT KUNSTADTprogress
08/01/2019HVAC and service water heating system controls —energy_progress
08/01/2019HVAC and service water heating equipment —energy_progress
08/01/2019Permanent certificate—energy_progress
08/01/2019Maintenance information—energy_progress
08/01/2019HVAC insulation and sealing —energy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York Police DepartmentGovernment / CivicFloor 1
Project Q00203871 Alteration · Incomplete · 11/18/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00203871-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/26/2026Q00761424-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
07/05/2022421577911Open ↗
04/13/2022421577911Open ↗
11/22/2017421577911Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
06/10/2021421577911Open ↗
10/10/2019421577911Open ↗
10/10/2019421577911Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
09/30/2019421577911Open ↗
09/30/2019421577911Open ↗
09/30/2019421577911Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026Q00761424-I1Open ↗
08/13/2026Q00203871-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
11/22/2017421577911Open ↗
01/27/2014420910553Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/14/2022421577911Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/22/2017421577911Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026Q00761424-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/30/2019421577911Open ↗
11/22/2017421577911Open ↗
11/22/2017421577911Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/14/2022421577911Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/14/2022421577911Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/15/2022421577911Open ↗
▸Inspections & Test Reports6
▸BISMECHANICAL DEMOLITION1
09/14/2022421577911Open ↗
▸BISMASONRY1
09/14/2022421577911Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/14/2022421577911Open ↗
▸BISMECHANICAL SYSTEMS1
09/14/2022421577911Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/14/2022421577911Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/14/2022421577911Open ↗
▸Approvals, Objections & Sign-offs11
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)2
03/11/2022421577911Open ↗
03/11/2022421577911Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/22/2017421577911Open ↗
01/27/2014420910553Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/27/2019421577911Open ↗
03/19/2014420910553Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/26/2026Q00761424-I1Open ↗
08/13/2026Q00203871-I1Open ↗
▸BISFINAL1
09/14/2022421577911Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/24/2025421577911Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026Q00203871-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
11/22/2017421577911Open ↗
11/22/2017421577911Open ↗
11/22/2017421577911Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/18/2022421577911Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET6
11/22/2017421577911Open ↗
11/22/2017421577911Open ↗
11/22/2017421577911Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION1
05/02/2022421577911Open ↗
▸Other Documents3
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
09/14/2022421577911Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
09/14/2022421577911Open ↗
▸BISSHUTOFF DAMPERS1
09/14/2022421577911Open ↗