← Back
Two stories - detached, small or mid-size
92-25 216 STREET
QUEENS · BIN 4227063
💬 Discuss this project
1920Year Built
2.75Stories
A1Building Class
R2Zoning
1,919 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,000 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
2 jobs · most recent 04/09/2022
General Wiring
FiledStatusContractorScope
04/09/2022CompleteJOE ELECTRICAL INCGeneral Wiring
03/04/2022CompleteJOE ELECTRICAL INCGeneral Wiring
Building Lifecycle
All (22)Filed (5)Permit Issued (2)Signed Off (2)Violation (2)Inspection (7)Special Inspection (4)
10/11/2022
Signed off — Alteration
CAP & REMOVE SHOWER & KITCHEN SINK W/ WATER & WASTE LINE AND GAS STOVE W/ GAS LINE. LEGALIZE 2-PIECE PLUMBING FIXTURE (SINK, TOILET), WASHER & DRYER AT CELLAR. PROPOSE 3-PIECE BATHROOM (SINK, TOILET, SHOWER) AT 1ST FLOOR. IN-ORDER TO RESOLVE DOB VIOLATION
Q00636895-S1
08/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
08/12/2022
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
08/10/2022
Filed — Alteration
CAP & REMOVE SHOWER & KITCHEN SINK W/ WATER & WASTE LINE AND GAS STOVE W/ GAS LINE. LEGALIZE 2-PIECE PLUMBING FIXTURE (SINK, TOILET), WASHER & DRYER AT CELLAR. PROPOSE 3-PIECE BATHROOM (SINK, TOILET, SHOWER) AT 1ST FLOOR. IN-ORDER TO RESOLVE DOB VIOLATION
Q00636895-P3
07/13/2022
Signed off — Alteration
CAP & REMOVE SHOWER & KITCHEN SINK W/ WATER & WASTE LINE AND GAS STOVE W/ GAS LINE. LEGALIZE 2-PIECE PLUMBING FIXTURE (SINK, TOILET), WASHER & DRYER AT CELLAR. PROPOSE 3-PIECE BATHROOM (SINK, TOILET, SHOWER) AT 1ST FLOOR. IN-ORDER TO RESOLVE DOB VIOLATION
Q00636895-I1
06/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
06/27/2022
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
06/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/01/2022
Filed — Alteration
CAP & REMOVE SHOWER & KITCHEN SINK W/ WATER & WASTE LINE AND GAS STOVE W/ GAS LINE. LEGALIZE 2-PIECE PLUMBING FIXTURE (SINK, TOILET), WASHER & DRYER AT CELLAR. PROPOSE 3-PIECE BATHROOM (SINK, TOILET, SHOWER) AT 1ST FLOOR. IN-ORDER TO RESOLVE DOB VIOLATION
Q00636895-P1
05/26/2022
Filed — Alteration
CAP & REMOVE SHOWER & KITCHEN SINK W/ WATER & WASTE LINE AND GAS STOVE W/ GAS LINE. LEGALIZE 2-PIECE PLUMBING FIXTURE (SINK, TOILET), WASHER & DRYER AT CELLAR. PROPOSE 3-PIECE BATHROOM (SINK, TOILET, SHOWER) AT 1ST FLOOR. IN-ORDER TO RESOLVE DOB VIOLATION
Q00636895-P2
05/02/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/06/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/04/2022
Permit issued — Plumbing
Q00636895-S1-PL
01/24/2022
Filed — Alteration
CAP & REMOVE SHOWER & KITCHEN SINK W/ WATER & WASTE LINE AND GAS STOVE W/ GAS LINE. LEGALIZE 2-PIECE PLUMBING FIXTURE (SINK, TOILET), WASHER & DRYER AT CELLAR. PROPOSE 3-PIECE BATHROOM (SINK, TOILET, SHOWER) AT 1ST FLOOR. IN-ORDER TO RESOLVE DOB VIOLATION
Q00636895-S1
01/11/2022
Permit issued — General Construction
Q00636895-I1-GC
12/16/2021
Filed — Alteration
CAP & REMOVE SHOWER & KITCHEN SINK W/ WATER & WASTE LINE AND GAS STOVE W/ GAS LINE. LEGALIZE 2-PIECE PLUMBING FIXTURE (SINK, TOILET), WASHER & DRYER AT CELLAR. PROPOSE 3-PIECE BATHROOM (SINK, TOILET, SHOWER) AT 1ST FLOOR. IN-ORDER TO RESOLVE DOB VIOLATION
Q00636895-I1
08/31/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/31/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/21/2017$496K—Private party → Private party$258/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSA BUILDING ENGINEERING SERVICES508/10/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PM MECHANICAL GROUP CORPGeneral Contractor303/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596508/10/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP03/04/2022
DOB NOWGeneral ConstructionSigned-offPM MECHANICAL GROUP CORP01/11/2022
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/09/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/06/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/12/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
08/12/2022Energy Code Compliance InspectionsHANSA PERSAUDprogress
06/27/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
06/27/2022Energy Code Compliance InspectionsHANSA PERSAUDprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00636895-P1Request digital key ↗
08/26/2026Q00636895-P2Request digital key ↗
08/26/2026Q00636895-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q00636895-S1Open ↗
08/13/2026Q00636895-P3Open ↗
08/13/2026Q00636895-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00636895-P3Open ↗
08/25/2026Q00636895-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00636895-P3Open ↗
08/25/2026Q00636895-S1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q00636895-P2Open ↗
08/13/2026Q00636895-P1Open ↗
08/13/2026Q00636895-I1Open ↗
Showing 3 of 5 on file for this type