← Back
Three families
92-35 51 AVENUE
QUEENS · BIN 4046111
💬 Discuss this project
1910Year Built
2.5Stories
C0Building Class
R5Zoning
3,117 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Three families · 4,003 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction7p · 2 filings · 14 docs
Floor 2Under Construction8p · 2 filings · 14 docs
Floor 1Under Construction8p · 2 filings · 14 docs
CellarUnder Construction11p · 2 filings · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2025$1.2M—Private party → WATERFALL VICTORIA III-NB ALTERNATIVE HOLDINGS LLC$393/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI508/12/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394208/12/2026
Building Lifecycle
All (30)Filed (5)Permit Issued (2)Violation (13)Inspection (4)Special Inspection (6)
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
08/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
08/12/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, COMBI. BOILERS AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01411005-P2
08/12/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR,1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE CONCRETE STAIR AT REAR YARD. REPLACE AND REDUCE OPEN PORCH SIZE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN
Q01411002-P1
08/12/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
08/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
08/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, COMBI. BOILERS AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01411005-P1
07/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2026
Permit issued — Plumbing
Q01411005-I1-PL
06/11/2026
Permit issued — General Construction
Q01411002-I1-GC
06/09/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR,1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REPLACE CONCRETE STAIR AT REAR YARD. REPLACE AND REDUCE OPEN PORCH SIZE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UN
Q01411002-I1
06/09/2026
Filed — Alteration
RENOVATION OF EXISTING CELLAR, 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER,DRYER, COMBI. BOILERS AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01411005-I1
05/06/2026
Violation issued (HPD, open)
A
06/11/2025
Violation issued (HPD, open)
A
04/12/2024
Violation issued (HPD, open)
A
03/28/2023
Violation issued (HPD, open)
A
03/03/2022
Violation issued (HPD, open)
A
04/14/2021
Violation issued (HPD, open)
A
12/01/2017
Violation issued (HPD, closed)
I
11/17/2016
Violation issued (HPD, closed)
I
10/15/2015
Violation issued (HPD, closed)
I
08/10/2001
Violation issued (HPD, open)
B
08/10/2001
Violation issued (HPD, open)
B
09/02/1987
Violation issued (HPD, open)
B
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCATMAN PLUMBING INC06/11/2026
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC06/11/2026
1 project · most recent 08/12/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/12/2026Permit IssuedCATMAN PLUMBING INCGas, Storm, Water/Sanitary
2 projects · most recent 06/12/2026
General Wiring
FiledStatusContractorScope
06/12/2026Permit IssuedP.L. ELEC'L CONTR'G CORPGeneral Wiring
07/10/2019Permit IssuedWEBSTAR ELECL CONTRS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/13/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/13/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
08/13/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/12/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/12/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/12/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026Q01411005-I1Request digital key ↗
08/16/2026Q01411005-P1Request digital key ↗
08/16/2026Q01411005-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026Q01411005-I1Open ↗
08/16/2026Q01411005-P2Open ↗
08/16/2026Q01411005-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q01411002-P1Open ↗
08/25/2026Q01411002-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01411002-P1Open ↗
08/25/2026Q01411002-I1Open ↗