Two family converted from one family
92-40 214 PLACE
QUEENS · BIN 4226876
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R2Zoning
1,312 sfGross Floor Area
2Units
Two family converted from one family · 2,750 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI105/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKHTAR CONSTRUCTION CO INGeneral Contractor209/18/2026
Building Lifecycle
All (10)Filed (1)Permit Issued (2)Objection (4)Special Inspection (3)
09/17/2026
Permit issued — General Construction
Q01227671-I1-GC-CX
06/23/2025
Permit issued — General Construction
Q01227671-I1-GC-CX
06/17/2025
Objection resolved — Addressed
06/17/2025
Objection resolved — Addressed
05/28/2025
Objection raised — Admin
05/28/2025
Objection raised — Other
05/20/2025
Filed — Alteration
FILED FOR ADDRESS RCA COMPLAINT # 4989978, REMOVE ILLEGAL EXTENSION AT REAR HEREWITH, INSTALL MECHANICAL WORK TYPE AS PER PLAN.
Q01227671-I1
05/17/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
05/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
05/17/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAKHTAR CONSTRUCTION CO IN09/17/2026
DOB NOWGeneral ConstructionPermit IssuedAKHTAR CONSTRUCTION CO IN06/23/2025
1 project · most recent 05/20/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/20/2025Permit IssuedAKHTAR CONSTRUCTION CO INAir Conditioning Systems
Cooling
Mitsubishi Electric MUZ-GS12NA 12,000 BTU · Condensing Unit ×1
MXZ-2C20NA4-U1 18,000 BTU · Condensing Unit ×1
MXZ-3C30NA3 30,000 BTU · Condensing Unit ×1
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/17/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
05/17/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/17/2025FinalFARHAD BASSIRI-TEHRANIprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01227671-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01227671-I1Open ↗
08/28/2026Q01227671-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01227671-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q01227671-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01227671-I1Open ↗