← Back
One family attached or semi-detached
92 BAY TERRACE
STATEN ISLAND · BIN 5064624
💬 Discuss this project
1970Year Built
2Stories
A5Building Class
R3-1Zoning
1,176 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,415 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/08/2024
NYC DESIGN BUILD ARCHITECTURE106/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
A+ EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M&R IMPROVEMENTS CORPGeneral Contractor307/08/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/08/2024
SRA PLANNING & EXPEDITING5677106/15/2023
Building Lifecycle
All (24)Filed (2)Permit Issued (3)Signed Off (1)Violation (2)Objection (4)Special Inspection (12)
04/02/2025
Signed off — Alteration
Horizontal enlargement to enlarge the existing kitchen with a proposed 2nd floor balcony above as per the plans filed herewith. No change to use, egress or occupancy
S00863852-I1
10/16/2024
Permit issued — Solar
S01119611-I1-SL
10/08/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01119611-I1
06/17/2024
Permit issued — General Construction
S00863852-I1-GC
08/30/2023
Permit issued — General Construction
S00863852-I1-GC
07/11/2023
Objection resolved — Addressed
07/05/2023
Objection resolved — Addressed
06/30/2023
Objection raised — Zoning
06/30/2023
Objection raised — Scope
06/15/2023
Filed — Alteration
Horizontal enlargement to enlarge the existing kitchen with a proposed 2nd floor balcony above as per the plans filed herewith. No change to use, egress or occupancy
S00863852-I1
04/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Lighting controls
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
04/24/2023
Special inspection requirement — Lighting in dwelling units
WILLIAM MONTAGUE
02/05/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2019
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC10/16/2024
DOB NOWGeneral ConstructionSigned-offM&R IMPROVEMENTS CORP06/17/2024
DOB NOWGeneral ConstructionSigned-offM&R IMPROVEMENTS CORP08/30/2023
2 projects · most recent 10/08/2024
FiledStatusContractorScope
10/08/2024Permit IssuedSUNRUN SOLAR ELECTL CORP—
04/01/2024CompleteD.R.P. ELEC'L CONTRG INC1 meters, 1 new_meters
1 project · most recent 10/08/2024
FiledStatusContractorScope
10/08/2024Permit IssuedSUNRUN INSTALLATION SVC10 panels, 4.1 kw, 211 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
04/24/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
04/24/2023FinalWILLIAM MONTAGUEprogress
04/24/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
04/24/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
04/24/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
04/24/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
04/24/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
04/24/2023Lighting controlsWILLIAM MONTAGUEenergy_progress
04/24/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
04/24/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
04/24/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
04/24/2023Lighting in dwelling unitsWILLIAM MONTAGUEenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026S00863852-I1Request digital key ↗
08/20/2026S01119611-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00863852-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026S00863852-I1Open ↗
08/27/2026S00863852-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026S00863852-I1Open ↗
08/13/2026S01119611-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026S00863852-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01119611-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026S00863852-I1Open ↗
▸Other Documents3
▸DOB NOWPlot Diagram1
08/13/2026S00863852-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00863852-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00863852-I1Open ↗