← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
92 PINEHURST AVENUE
MANHATTAN · BIN 1064342
💬 Discuss this project
1928Year Built
6Stories
RMBuilding Class
R7-2Zoning
84,037 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized15 Open Violations 9 unresolved · 6 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 15,775 sf lot · 5.33 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 3 filings · 14 docs
Mezzanine1p · 1 filing · 20 docs
Cellar8p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MOSBACHER PROPERTIES GROUP3707/08/2026
ALMA REALTY2807/08/2026
ROSE PROPERTY MANAGEMENT GROUP1003/22/2026
ICON ELECTRIC INC103/22/2026
ALLSTATE SMART ELECT LLC103/22/2026
OWNER OF APT#3F103/22/2026
HIGHCASTLE MANAGEMENT203/22/2026
92 PINEHURST AVE1903/22/2026
OWNER OF PINEHURST AVENUE103/22/2026
OWNER OF 92 PINEHURST AVE303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO CONSULTING MANAGEMENT1603/21/2026
GREEN STUDIO203/21/2026
ALMA REALTY703/21/2026
HIERARCH-E203/21/2026
HOVANN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor903/21/2026
VORDONIA CONTRACTING & SUPPLIESGeneral Contractor404/09/2026
MASON CONSTRUCTION SERVICGeneral Contractor207/08/2026
TAMPOPO LLCGeneral Contractor204/09/2026
L.L.G. PLBG & HTG INCPlumbing207/08/2026
T.N.T. PLBG & HTG, INCPlumbing207/08/2026
MARIO CASTROElectrical103/21/2026
MYERS, JOSEPHElectrical103/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
THE METRO GROUP ELECTRICElectrical103/22/2026
ALLSTATE SMART ELECT LLCElectrical103/22/2026
TREVOR DUNWELLElectrical103/21/2026
CITY LIGHTS CONSTRUCTION*General Contractor107/08/2026
DONE RIGHT HOOD & FIRE SAGeneral Contractor104/09/2026
TRANSCANADAElectrical103/21/2026
A-ULTIMATE EL. CON.&MGMT.Electrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
BRUNI ELECTRIC INCElectrical103/22/2026
DEDOS, RAULElectrical103/21/2026
HOLNESS, GEORGEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOHAIL HUMAYUN P E INC8457407/08/2026
P GEORGOPOULOS ARCHITECT889303/31/2025
MIKE POLYCHRONIADES8407301/09/2025
KOENIGSBERG ENGINEERING,2247106/13/2024
FREDERICK TAYLOR ASSOCIAT1076405/02/2024
AK ENGINEERING PC678104/25/2023
Building Lifecycle
All (190)Filed (25)Permit Issued (17)Signed Off (7)Facade (FISP) (18)Violation (60)Inspection (20)Objection (13)Special Inspection (30)
08/03/2026
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN HOOD, IN THE CELLAR, EXHAUST FAN, MAKE-UP AIR UNIT IN THE BASEMENT, HVAC AND DUCTWORK IN THE MEZZANINE FL AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01195856-S4
07/14/2026
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN HOOD, IN THE CELLAR, EXHAUST FAN, MAKE-UP AIR UNIT IN THE BASEMENT, HVAC AND DUCTWORK IN THE MEZZANINE FL AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01195856-S3
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOHAIL HUMAYUN
07/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOHAIL HUMAYUN
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
SOHAIL HUMAYUN
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
07/08/2026
Filed — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN HOOD, IN THE CELLAR, EXHAUST FAN, MAKE-UP AIR UNIT IN THE BASEMENT, HVAC AND DUCTWORK IN THE MEZZANINE FL AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01195856-P4
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOHAIL HUMAYUN
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOHAIL HUMAYUN
06/09/2026
Violation issued (ECB, open)
Construction
06/04/2026
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN HOOD, IN THE CELLAR, EXHAUST FAN, MAKE-UP AIR UNIT IN THE BASEMENT, HVAC AND DUCTWORK IN THE MEZZANINE FL AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01195856-I1
03/30/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Permit issued — General Construction
M01195856-I1-GC
03/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOHAIL HUMAYUN
02/19/2026
Special inspection requirement — Fenestration areas
SOHAIL HUMAYUN
02/19/2026
Special inspection requirement — Insulation placement and R values
SOHAIL HUMAYUN
02/19/2026
Special inspection requirement — Fenestration air leakage
SOHAIL HUMAYUN
02/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
SOHAIL HUMAYUN
02/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOHAIL HUMAYUN
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
02/17/2026
Permit issued — Mechanical Systems
M01195856-S3-MS
02/10/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Cost
02/04/2026
Permit issued — Plumbing
M01195856-S4-PL
01/27/2026
Filed — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN HOOD, IN THE CELLAR, EXHAUST FAN, MAKE-UP AIR UNIT IN THE BASEMENT, HVAC AND DUCTWORK IN THE MEZZANINE FL AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01195856-P3
01/27/2026
Special inspection requirement — Insulation placement and R values
01/27/2026
Special inspection requirement — Fenestration areas
01/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
01/27/2026
Special inspection requirement — Fenestration air leakage
01/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOHAIL HUMAYUN
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
01/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/14/2026
Filed — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN HOOD, IN THE CELLAR, EXHAUST FAN, MAKE-UP AIR UNIT IN THE BASEMENT, HVAC AND DUCTWORK IN THE MEZZANINE FL AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01195856-S4
01/06/2026
Filed — Alteration
TENANT LAUNDRY IN CELLAR. INSTALL NEW WASHING MACHINES AND DRYERS AS PER FLOOR PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00962456-P1
01/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/01/2025
Permit issued — General Construction
M01195856-I1-GC
11/24/2025
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
11/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOHAIL HUMAYUN
11/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SOHAIL HUMAYUN
11/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
SOHAIL HUMAYUN
11/24/2025
Special inspection requirement — Shutoff dampers
SOHAIL HUMAYUN
11/24/2025
Special inspection requirement — Ventilation and air distribution system
SOHAIL HUMAYUN
11/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
SOHAIL HUMAYUN
11/24/2025
Special inspection requirement — Maintenance information
SOHAIL HUMAYUN
11/21/2025
Filed — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN HOOD, IN THE CELLAR, EXHAUST FAN, MAKE-UP AIR UNIT IN THE BASEMENT, HVAC AND DUCTWORK IN THE MEZZANINE FL AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01195856-P1
11/18/2025
Filed — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN HOOD, IN THE CELLAR, EXHAUST FAN, MAKE-UP AIR UNIT IN THE BASEMENT, HVAC AND DUCTWORK IN THE MEZZANINE FL AS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THE FDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01195856-S3
11/13/2025
Permit issued — General Construction
M00962402-I1-GC
11/05/2025
Objection resolved — Addressed
10/29/2025
Objection raised — Scope
10/29/2025
Objection resolved — Addressed
10/06/2025
Violation issued (HPD, closed)
A
10/06/2025
Violation issued (HPD, closed)
C
10/06/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 190 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTAMPOPO LLC03/19/2026
DOB NOWMechanical SystemsSigned-offDONE RIGHT HOOD & FIRE SA02/17/2026
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC02/04/2026
DOB NOWGeneral ConstructionSigned-offTAMPOPO LLC12/01/2025
DOB NOWGeneral ConstructionPermit IssuedVORDONIA CONTRACTING & SU11/13/2025
DOB NOWPlumbingPermit IssuedT.N.T. PLBG & HTG, INC09/23/2025
DOB NOWMechanical SystemsPermit IssuedVORDONIA CONTRACTING & SU08/19/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/11/2024
DOB NOWGeneral ConstructionPermit IssuedVORDONIA CONTRACTING & SU09/09/2024
DOB NOWPlumbingPermit IssuedT.N.T. PLBG & HTG, INC09/05/2024
DOB NOWGeneral ConstructionSigned-offCITY LIGHTS CONSTRUCTION*08/30/2024
DOB NOWSuspended ScaffoldPermit IssuedUPHOLD CONSTRUCTION CORP05/17/2024
DOB NOWGeneral ConstructionSigned-offMASON CONSTRUCTION SERVIC04/26/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/13/2023
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC09/05/2023
DOB NOWGeneral ConstructionSigned-offMASON CONSTRUCTION SERVIC04/24/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/17/2022
BISBLISSUEDAPPROVED OIL CO OF BKLYN02/17/2022
BISPLISSUEDBELL FUEL OIL, LLC01/08/2022
BISOTISSUEDAMERICAN VENTILATION SERV04/23/2021
BISPLISSUEDL & N PLUMBING, INC05/07/2019
BISPLISSUEDL & N PLUMBING, INC05/07/2019
BISPLISSUEDROCK E SMALL PLBG&HTG INC03/05/2019
BISOTISSUEDHAUSMANN SERVICE CORP02/04/2019
BISOTISSUEDPROGENY RESTORATION CORP01/29/2019
BISOTISSUEDC & D OF NEW YORK INC01/15/2019
BISOTISSUEDC & D OF NEW YORK INC01/15/2019
BISPLISSUEDL & N PLUMBING, INC01/10/2019
BISPLISSUEDL & N PLUMBING, INC10/18/2018
BISOTISSUEDC & D OF NEW YORK INC10/11/2018
BISPLISSUEDEZ RUNER CONSTRUCTION CORP08/01/2018
BISPLISSUEDEZ RUNER CONSTRUCTION CORP06/29/2018
BISOTISSUEDROVOLA RENOVATIONS INC05/08/2018
BISPLISSUEDJOHNNY'S P&H CONTRAC INC02/07/2018
BISPLISSUEDL & N PLUMBING, INC01/09/2018
BISOTISSUEDLAND DESIGN STUDIO INC11/21/2017
BISOTISSUEDLAND DESIGN STUDIO INC11/21/2017
BISOTISSUEDC & D OF NEW YORK INC10/27/2017
BISPLISSUEDDOUG'S PLBG & HTG SERV CO10/06/2017
BISPLISSUEDTW PLUMBING & HEATING INC09/18/2017
+ 27 more permits on file
1 job · most recent 07/08/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026Signed-offTAMPOPO LLCAir Conditioning Systems, Ventilation Systems
Cooling
Sea Breeze HSZ24H525ZMO 24,000 BTU · Condensing Unit ×1
SZ36H525ZMO 36,000 BTU · Heat Pump Outdoor ×1
Comfortmaker D5CURAH60AAK 60,000 BTU · Heat Pump Outdoor ×1
United ×1
Ventilation
Delhi BI-20RM 4,500 CFM · Kitchen Exhaust ×1
DELHI BLOWER 215 4,000 CFM · Makeup Air ×1
1 job · most recent 01/06/2026
FiledStatusContractorScope
01/06/2026——8 heads
2 jobs · most recent 07/08/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
07/08/2026Signed-offL.L.G. PLBG & HTG INCGas
01/06/2026Permit IssuedT.N.T. PLBG & HTG, INCGas, Plumbing-Sprinkler, Water/Sanitary
13 jobs · most recent 01/09/2026
General Wiring
FiledStatusContractorScope
01/09/2026Permit IssuedAPPROVED ELECTRIC CORP.General Wiring
10/10/2025Permit IssuedALLSTATE SMART ELECT LLCGeneral Wiring
08/27/2025Permit IssuedALLSTATE SMART ELECT LLCGeneral Wiring
06/13/2025Permit IssuedQEC ELECTRICAL SVCE CORPGeneral Wiring
03/13/2025Permit IssuedICON ELECTRIC INCGeneral Wiring
06/07/2024CompleteQEC ELECTRICAL SVCE CORPGeneral Wiring
05/15/2024CompleteQEC ELECTRICAL SVCE CORP—
12/23/2022CompleteTHE METRO GROUP ELECTRICGeneral Wiring
11/17/2022CompleteBRUNI ELECTRIC INCGeneral Wiring
10/01/2022CompleteBOROWIDE ELECT'L CONTR'S—
11/18/2021Permit IssuedTMF ELEC'L CONTR. INC.General Wiring
08/11/2021Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
02/18/2019CompleteINDY ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
03/30/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/04/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/18/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/11/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/24/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/24/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/09/2026Fire-Resistant Penetrations and JointsSOHAIL HUMAYUNspecial
07/09/2026Tenant Protection Plan ComplianceSOHAIL HUMAYUNspecial
07/09/2026HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
07/09/2026Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
06/12/2026Tenant Protection Plan Compliance—special
06/12/2026HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
06/12/2026Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
06/12/2026Fire-Resistant Penetrations and JointsSOHAIL HUMAYUNspecial
02/19/2026Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
02/19/2026Fenestration air leakageSOHAIL HUMAYUNenergy_progress
02/19/2026Fenestration and door U-factor and product ratingsSOHAIL HUMAYUNenergy_progress
02/19/2026Insulation placement and R valuesSOHAIL HUMAYUNenergy_progress
02/19/2026Fenestration areasSOHAIL HUMAYUNenergy_progress
02/19/2026Tenant Protection Plan ComplianceSOHAIL HUMAYUNspecial
02/19/2026Fire-Resistance Rated ConstructionSOHAIL HUMAYUNprogress
01/27/2026Fenestration and door U-factor and product ratings—energy_progress
01/27/2026Fenestration air leakage—energy_progress
01/27/2026Fenestration areas—energy_progress
01/27/2026Insulation placement and R values—energy_progress
01/26/2026Tenant Protection Plan Compliance—special
01/26/2026Fire-Resistance Rated ConstructionSOHAIL HUMAYUNprogress
01/26/2026Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
11/24/2025Shutoff dampersSOHAIL HUMAYUNenergy_progress
11/24/2025HVAC-R and service water heating equipmentSOHAIL HUMAYUNenergy_progress
11/24/2025HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
Latest 25 of 74.
▾Documents — 684 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
09/02/2026M00677507-I1Request digital key ↗
09/01/2026M08013474-I1Request digital key ↗
09/01/2026M08038392-P2Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits135
▸BISWORK PERMIT APPLICATION73
02/17/2022140839421Open ↗
01/08/2022140839421Open ↗
05/17/2021140839421Open ↗
Showing 3 of 73 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION62
10/28/2019123250560Open ↗
10/22/2019123250560Open ↗
10/17/2019123250560Open ↗
Showing 3 of 62 on file for this type
▸Seals & Professional Certifications159
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
12/23/2019123250560Open ↗
11/19/2019123125867Open ↗
06/14/2019123780907Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/23/2026M01195856-S3Open ↗
09/23/2026M01195856-S3Open ↗
09/23/2026M01195856-S3Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/02/2026M00677507-I1Open ↗
09/01/2026M08038392-I1Open ↗
09/01/2026M08038392-S1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026M01195856-S3Open ↗
09/23/2026M01195856-S3Open ↗
09/23/2026M01195856-S3Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/26/2019140839421Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
03/26/2019140839421Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
03/26/2019140839421Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment54
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE37
10/22/2019123250560Open ↗
10/17/2019123250560Open ↗
09/06/2019123154273Open ↗
Showing 3 of 37 on file for this type
▸BISSCHEDULE B - PLUMBING7
03/26/2019140839421Open ↗
Showing 1 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
03/26/2019140839421Open ↗
Showing 1 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection22
▸BISTenant Protection Plan and Notes21
06/14/2019123780907Open ↗
06/07/2019123780907Open ↗
01/11/2019123591274Open ↗
Showing 3 of 21 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos52
▸BISASBESTOS: CERTIFICATION (DEP ACP5)29
06/14/2019123780907Open ↗
06/07/2019123780907Open ↗
06/07/2019123780907Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/01/2026M08038392-I1Open ↗
09/01/2026M08038392-P1Open ↗
09/01/2026M08038392-P2Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/29/2019123549589Open ↗
▸Energy Compliance61
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS42
12/23/2019123250560Open ↗
11/19/2019123125867Open ↗
06/14/2019123780907Open ↗
Showing 3 of 42 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
12/23/2019123250560Open ↗
11/19/2019123125867Open ↗
05/28/2019123591274Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/24/2023140839421Open ↗
03/26/2019140839421Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
03/26/2019140839421Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/24/2023140839421Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
03/27/2023140839421Open ↗
03/24/2023140839421Open ↗
03/26/2019140839421Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
03/27/2023140839421Open ↗
12/23/2019123250560Open ↗
11/19/2019123125867Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/02/2026M00677507-I1Open ↗
▸Cost, Insurance & Ownership52
▸BISCOST AFFIDAVIT46
12/23/2019123250560Open ↗
11/19/2019123125867Open ↗
06/14/2019123780907Open ↗
Showing 3 of 46 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
06/29/2018140775766Open ↗
Showing 1 of 3 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
10/11/2018123125867Open ↗
Showing 1 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/24/2023140839421Open ↗
▸Filing & Intake Forms85
▸BISEFILING COVER SHEET31
06/14/2019123780907Open ↗
06/07/2019123780907Open ↗
05/28/2019123780890Open ↗
Showing 3 of 31 on file for this type
▸BISBOROUGH INTAKE FORM27
12/23/2019123250560Open ↗
11/19/2019123125867Open ↗
10/22/2019123250560Open ↗
Showing 3 of 27 on file for this type
▸BISADDITIONAL INFORMATION23
01/08/2022140839421Open ↗
05/17/2021140839421Open ↗
11/13/2019123250560Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
03/26/2019140839421Open ↗
Showing 1 of 4 on file for this type
▸Other Documents9
▸BISUnknown7
05/28/2019123780890Open ↗
05/28/2019123780890Open ↗
05/28/2019123780890Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCalculations1
08/13/2026M01036323-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01036323-I1Open ↗