ECB07/18/2019DEMOLITON WORK W/O REQUIRED DEMOLITION PERMIT. @TIME OF INSPECTION ON AN ACTIVE JOB SITE I OBSERVED 1 STY STRUCTURE @SITE REAR REMOVED/DEMOLISHED BASED UPON BIS RESEARCH DEMOLITION JOB WAS FILED WITH THE DEPT$1K due
Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.