← Back
BuildNYC
Walk-up cooperative
92 WADSWORTH AVENUE
MANHATTAN · BIN 1063567
💬 Discuss this project
1910Year Built
5Stories
C6Building Class
R7-2Zoning
14,025 sfGross Floor Area
15Units
Rent Stabilized1 Active Violation ▸
Walk-up cooperative · Owner of record: 8693 Bay Parkway · 4,000 sf lot · 3.51 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Unit 4A, Unit 4B21p · 2 filings · 20 docs
Floor 4Unit 4A, Unit 4B10p · 2 filings · 20 docs
Floor 310p · 1 filing · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8693 Bay Parkway603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture603/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B&B Mechanical Plumbing & HeatingPlumbing507/08/2026
Bluerock Development & CoGeneral Contractor307/08/2026
Smalls Mechanical & Electrical ServiceElectrical103/22/2026
Smalls Mechanical & Electrical ServiceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sia Inspections7306603/14/2023
Building Lifecycle
04/29/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/05/2025
Boiler inspection report filed
Initial · no defects · Accepted
11/22/2024
Boiler inspection report filed
Initial · no defects · Accepted
11/06/2024
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
11/06/2024
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
HPD violation · closed
82 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBluerock Development & Co08/22/2023
DOB NOWPlumbingSigned-offTarget Piping NY04/18/2023
DOB NOWGeneral ConstructionPermit IssuedBluerock Development & Co08/16/2022
DOB NOWPlumbingSigned-offTarget Piping NY07/15/2022
DOB NOWGeneral ConstructionPermit IssuedBluerock Development & Co05/16/2022
BISBLISSUEDMarathon Mechanical11/28/2014
BISPLISSUEDMarathon Mechanical11/28/2014
BISBLISSUEDMarathon Mechanical05/24/2013
BISPLISSUEDMarathon Mechanical05/24/2013
BISEQISSUEDJ & G GNRL Contracting11/02/2011
BISBLISSUEDDual Fuel Plumbing and Heating10/20/1997
BISPLISSUEDCalaray Gas HGHT10/20/1997
BISOTISSUED9092 Wadsworth Ave07/02/1992
3 projects · most recent 12/12/2023
General Wiring
FiledStatusContractorScope
12/12/2023CompleteSmalls Mechanical & Electrical ServiceGeneral Wiring
06/14/2023CompleteSmalls Mechanical & Electrical ServiceGeneral Wiring
06/14/2023CompleteAmerican Power Electric ConsGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/06/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
03/06/2023Energy Code Compliance InspectionsJEFF AKERMANprogress
03/06/2023Fire-Resistance Rated ConstructionJEFF AKERMANprogress
03/06/2023Lighting in dwelling unitsJEFF AKERMANenergy_progress
03/06/2023Interior lighting powerJEFF AKERMANenergy_progress
02/15/2023Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
02/15/2023Energy Code Compliance InspectionsJEFF AKERMANprogress
02/15/2023Fire-Resistance Rated ConstructionJEFF AKERMANprogress
02/15/2023Interior lighting powerJEFF AKERMANenergy_progress
02/15/2023Lighting in dwelling unitsJEFF AKERMANenergy_progress
11/17/2022Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
11/13/2022Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
73 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account