← Back
Stand-alone food establishment
920 AVENUE U
BROOKLYN · BIN 3193189
💬 Discuss this project
1978Year Built
1Stories
K5Building Class
R6AZoning
4,189 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Stand-alone food establishment · Owner of record: FRANCHISE REALTY INTERSTATE CORP · 14,800 sf lot · 0.28 FAR built · Flood zone X500
Locations of Work
StructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MCDONALDS3607/08/2026
MCDONALD'S2603/22/2026
RECTENWALD CONSTRUCTION INC103/22/2026
MCDONALDS REAL ESTATE COMPANY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC105/18/2026
STV INCORPORATED309/15/2022
SWA ARCHITECTURE205/04/2021
AECOM USA, INC.109/25/2020
AECOM209/21/2020
HC ARCHITECT, PC406/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SWA ARCHITECTURE1603/21/2026
JP EXPEDITE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIVE TOWN NEON SIGN CO INScaffold807/08/2026
STAN LYUBOMUDROVElectrical303/21/2026
GUIDING LIGHT ELECTRIC INElectrical303/22/2026
LEBO ELECTRIC LLC 004796General Contractor303/22/2026
TOM RECTENWALD CONSTRUCTIGeneral Contractor207/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
AECOMGeneral Contractor203/22/2026
LEBO ELECTRIC LLCElectrical103/22/2026
RCNYC CORPGeneral Contractor107/08/2026
7 C'S PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEVIN ENGINEERING PLLC1267105/18/2026
CATALPA SPECIAL INSPECTIO2004109/21/2020
Building Lifecycle
All (86)Filed (13)Permit Issued (13)Signed Off (7)Violation (20)Inspection (2)Objection (26)Special Inspection (5)
06/16/2026
Permit issued — Mechanical Systems
B01403608-I1-MS
05/18/2026
Filed — Alteration
DISCONNECT EXISTING ROOFTOP UNIT FROM GAS SUPPLY LINE,ELECTRIC POWER AND DUCT SYSTEM. REMOVE EXISTING ROOFTOP UNITS. INSTALL PACKAGED GAS ROOFTOP UNITS ON EXISTING CURBS. CONNECT NEW ROOFTOP UNITS TO EXISTING GAS SUPPLY LINE,ELECTRIC POWER AND DUCT SYSTEM
B01403608-I1
05/09/2024
Violation issued (FDNY_NOV, closed)
06/27/2023
Violation issued (FDNY_NOV, closed)
10/05/2022
Special inspection requirement — Public Assembly Emergency Lighting
ERIC BERLENT
09/26/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Scope
09/15/2022
Filed — No Work
B00532855-P2
08/29/2022
Special inspection requirement — Public Assembly Emergency Lighting
ERIC BERLENT
08/05/2022
Objection resolved — Addressed
07/25/2022
Objection raised — Scope
07/22/2022
Filed — No Work
B00532855-P1
06/29/2022
Special inspection requirement — Public Assembly Emergency Lighting
ERIC BERLENT
10/12/2021
Signed off — Alteration
B00296187-I1
09/07/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2021
Signed off — Alteration
B00292405-I1
08/20/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/04/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/22/2021
Objection raised — Structural
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Fire_Protection
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Fire_Protection
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Fire_Protection
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Inspections
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Inspections
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Inspections
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Other
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Structural
07/22/2021
Objection resolved — Addressed
07/22/2021
Objection raised — Inspections
07/22/2021
Objection resolved — Addressed
07/21/2021
Filed — No Work
B00532855-I1
07/19/2021
Signed off — Alteration
B00177354-I1
07/19/2021
Signed off — Alteration
B00177372-I1
07/19/2021
Signed off — Alteration
B00177361-I1
07/19/2021
Signed off — Alteration
B00177379-I1
07/13/2021
Violation issued (FDNY_NOV, closed)
06/14/2021
Signed off — Alteration
installation of construction fence during exterior renovation
B00130875-I1
06/14/2021
Permit issued — Plumbing
B00292405-I1-PL
05/24/2021
Special inspection requirement — Preliminary
ERIC BERLENT
05/24/2021
Special inspection requirement — Final
ERIC BERLENT
05/04/2021
Filed — Alteration
installation of construction fence during exterior renovation
B00130875-P1
05/03/2021
Violation issued (ECB, closed)
Construction
05/03/2021
Violation issued (ECB, closed)
Unknown
05/03/2021
Violation issued (ECB, closed)
Construction
05/03/2021
Violation issued (ECB, closed)
Construction
01/20/2021
Permit issued — Mechanical Systems
B00296187-I1-MS
09/25/2020
Filed — Alteration
B00292602-I1
09/21/2020
Filed — Alteration
B00296187-I1
09/18/2020
Permit issued — Plumbing
B00292405-I1-PL
09/14/2020
Permit issued — Construction Fence
B00130875-I1-FN
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedRCNYC CORP06/16/2026
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR06/14/2021
DOB NOWMechanical SystemsSigned-offARTUR HOME IMPROVEMENT01/20/2021
DOB NOWPlumbingSigned-off7 C'S PLBG & HTG CORP09/18/2020
DOB NOWConstruction FenceSigned-offARTUR HOME IMPROVEMENT09/14/2020
DOB NOWSignSigned-offENRICO PASSARO06/12/2020
DOB NOWSignSigned-offENRICO PASSARO06/12/2020
DOB NOWSignSigned-offENRICO PASSARO06/12/2020
DOB NOWSignSigned-offENRICO PASSARO06/12/2020
DOB NOWSignSigned-offENRICO PASSARO06/12/2019
DOB NOWSignSigned-offENRICO PASSARO06/12/2019
DOB NOWSignSigned-offENRICO PASSARO06/12/2019
DOB NOWSignSigned-offENRICO PASSARO06/12/2019
BISOTISSUEDTOM RECTENWALD CONSTRUCTI02/03/2021
BISOTISSUEDTOM RECTENWALD CONSTRUCTI02/03/2021
BISOTISSUEDTOM RECTENWALD CONSTRUCTI02/03/2021
BISOTISSUEDTOM RECTENWALD CONSTRUCTI09/18/2020
BISOTISSUEDTOM RECTENWALD CONSTRUCTI09/18/2020
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR12/10/2009
BISEQISSUEDRASCO CONTRACTING CORP12/07/2009
BISMHISSUEDRASCO CONTRACTING CORP12/07/2009
BISOTISSUEDBERGER SIGN FABRICATION INC06/11/2002
BIS—ISSUEDBERGER SIGN FABRICATION INC06/04/2002
BIS—ISSUEDBERGER SIGN FABRICATION INC06/04/2002
BISOTISSUEDCORNERSTONE CONSULTANTS INC04/15/2002
BISOTISSUEDCORNERSTONE CONSULTANTS INC04/15/2002
BISFPISSUEDSAFETY CONSULTANTS,10/17/2000
BISEQISSUEDVARDARO CONSTRUCTION CORP.08/24/2000
BISOTISSUEDBERGEN SIGN FABRICATION INC09/16/1998
BISOTISSUEDBERGER SIGN FABRICATION INC.09/14/1998
BIS—ISSUEDBERGER SIGN FSBRICATION INC08/24/1998
BIS—ISSUEDBERGER SIGN FBRICATION INC08/24/1998
BIS—ISSUEDBERGER SIGN FABRICATION INC08/24/1998
BIS—ISSUEDBERGER SIGN FABRICATION INC07/31/1998
BIS—ISSUEDBERGER SIGN FABRICATION INC07/31/1998
BIS—ISSUEDBERGER SIGN FABRICATION INC07/31/1998
BISFPISSUEDSAFETY CONSULTANTS INC09/24/1997
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR12/27/1993
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR09/20/1993
BIS—ISSUEDVARDARO CONSTR11/05/1992
+ 1 more permits on file
1 project · most recent 05/18/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Permit IssuedRCNYC CORPAir Conditioning Systems
Cooling
Johnson Controls KJ150N24R2AAAAA1A1 13 tons · Chiller ×2
KJ120N24R2AAAAA1A1 10 tons · Rooftop Unit ×1
6 projects · most recent 08/09/2021
General Wiring
FiledStatusContractorScope
08/09/2021CompleteGUIDING LIGHT ELECTRIC IN—
08/09/2021CompleteGUIDING LIGHT ELECTRIC IN—
08/09/2021CompleteGUIDING LIGHT ELECTRIC IN—
08/09/2021CompleteGUIDING LIGHT ELECTRIC IN—
06/07/2021CompleteLEBO ELECTRIC LLCGeneral Wiring
04/26/2021CancelledGUIDING LIGHT ELECTRIC INGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/07/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/05/2022Public Assembly Emergency LightingERIC BERLENTprogress
08/29/2022Public Assembly Emergency LightingERIC BERLENTprogress
06/29/2022Public Assembly Emergency LightingERIC BERLENTprogress
05/24/2021PreliminaryERIC BERLENTprogress
05/24/2021FinalERIC BERLENTprogress
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Sign4
09/02/2026B00177372-I1Request digital key ↗
09/02/2026B00177379-I1Request digital key ↗
09/02/2026B00177354-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/15/2026B00532855-P2Request digital key ↗
08/15/2026B00532855-P1Request digital key ↗
08/14/2026B00532855-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00130875-P1Request digital key ↗
08/14/2026B00130875-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/17/2026B01403608-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00292405-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00296187-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00292602-I1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION8
03/09/2021322019338Open ↗
02/10/2021322019338Open ↗
02/10/2021322019338Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
08/10/2021322019338Open ↗
10/27/2020322019338Open ↗
09/28/2020321903589Open ↗
Showing 3 of 7 on file for this type
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
10/16/2020322019338Open ↗
▸BISPLACE OF ASSEMBLY1
01/20/2010320121239Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISDOB - ZONING DIAGRAM (ZD1)2
10/26/2021322019338Open ↗
10/16/2020322019338Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026B00177372-I1Open ↗
09/02/2026B00177379-I1Open ↗
09/02/2026B00177354-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
12/26/2019322019338Open ↗
12/28/2018321903589Open ↗
10/24/2011320095847Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00532855-P2Open ↗
08/27/2026B00532855-P1Open ↗
08/24/2026B00130875-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/25/2009320095847Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/25/2009320095847Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
01/28/2010320095847Open ↗
▸BISSCHEDULE B - PLUMBING1
11/25/2009320095847Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
10/16/2020322019338Open ↗
09/28/2020322019338Open ↗
12/26/2019322019338Open ↗
▸BISSTREET TREE SIGNOFF1
10/16/2020322019338Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00296187-I1Open ↗
08/13/2026B00292602-I1Open ↗
08/13/2026B00292405-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
03/22/2010320121239Open ↗
01/20/2010320121239Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/25/2009320095847Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/16/2020322019338Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/26/2021322019338Open ↗
10/16/2020322019338Open ↗
10/16/2020322019338Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/26/2019322019338Open ↗
12/28/2018321903589Open ↗
▸BISINTERIOR LIGHTING POWER2
12/10/2021322019338Open ↗
11/19/2021322019338Open ↗
▸BISFENESTRATION AREAS1
12/10/2021322019338Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/10/2021322019338Open ↗
▸BISLIGHTING CONTROLS1
12/17/2021322019338Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
11/15/2021322019338Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
12/17/2021322019338Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/10/2021322019338Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/10/2021322019338Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/10/2021322019338Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
10/16/2020322019338Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/01/2021321903589Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/26/2021322019338Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/10/2021322019338Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/26/2021322019338Open ↗
10/26/2021322019338Open ↗
10/01/2021321903589Open ↗
Showing 3 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
10/16/2020322019338Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/03/2021321903589Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/24/2011320095847Open ↗
07/26/2011320121239Open ↗
07/26/2011320121239Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/22/2021322019338Open ↗
10/01/2021321903589Open ↗
10/24/2011320095847Open ↗
▸BISSUPERSEDING LETTER2
02/10/2021322019338Open ↗
02/10/2021322019338Open ↗
▸BISFINAL1
02/03/2021321903589Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/25/2009320095847Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
10/16/2020322019338Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT5
01/23/2020322019338Open ↗
12/26/2019322019338Open ↗
12/28/2018321903589Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
02/10/2021322019338Open ↗
02/10/2021322019338Open ↗
10/16/2020322019338Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
10/26/2021322019338Open ↗
10/01/2021321903589Open ↗
▸BISSTEEL AFFIDAVIT- FINAL1
10/16/2020322019338Open ↗
▸BISWELDERS AFFIDAVIT1
10/16/2020322019338Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
10/16/2020322019338Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION15
08/23/2021322019338Open ↗
08/15/2021322019338Open ↗
08/10/2021322019338Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET4
01/23/2020322019338Open ↗
12/26/2019322019338Open ↗
12/28/2018321903589Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/10/2021322019338Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/16/2020322019338Open ↗