← Back
BuildNYC
Old law tenement
920 MELROSE AVENUE
BRONX · BIN 2001520
💬 Discuss this project
1927Year Built
4Stories
C4Building Class
R7-2Zoning
—Gross Floor Area
4Units
7 Active Violations ▸FDNY Report ↗
Old law tenement · Owner of record: MRC Melrose Housing Development Fund · 1.49 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior renovation and fixture replacement1 filing · 9 docs
Floor 4Interior renovation and fixture replacement1 filing · 9 docs
Floor 3Interior renovation and fixture replacement1 filing · 9 docs
Floor 2Interior renovation and fixture replacement1 filing · 9 docs
Floor 1Interior renovation and fixture replacement1 filing · 9 docs
CellarInterior renovation and fixture replacement1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MRC Melrose HDFC1110/07/2026
MRC Melrose Houses Ltd Prtnrsh203/21/2026
NYC Department of Housing Preservation and Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Inglese Architecture and Engineering510/06/2026
Beroa Engineering110/05/2026
SLM Architecture110/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RPJ ElectricElectrical203/21/2026
Building Lifecycle
All (71)Filed (7)Violation (33)Objection (1)Special Inspection (30)
10/07/2026
Objection raised — Other
10/06/2026
Filed — Alteration
REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363186-S2
10/05/2026
Filed — Alteration
REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363186-S1
10/05/2026
Filed — Alteration
REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363186-S6
10/05/2026
Filed — Alteration
REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363186-S4
10/02/2026
Filed — Alteration
REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363186-S5
10/02/2026
Filed — Alteration
REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363186-S3
10/01/2026
Filed — Alteration
REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363186-I1
09/24/2026
Special inspection requirement — Insulation placement and R values
09/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/23/2026
Special inspection requirement — Fenestration air leakage
09/23/2026
Special inspection requirement — Air barrier - visual inspection
09/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/23/2026
Special inspection requirement — Energy Code Compliance Inspections
09/23/2026
Special inspection requirement — Vestibules
09/23/2026
Special inspection requirement — Interior lighting power
09/23/2026
Special inspection requirement — Lighting in dwelling units
09/23/2026
Special inspection requirement — Lighting controls
09/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/23/2026
Special inspection requirement — Exterior lighting power
07/16/2026
Special inspection requirement — Masonry
06/30/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (HPD, open)
B
06/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/15/2026
Special inspection requirement — Chimneys and vents
06/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/14/2026
Special inspection requirement — Heating Systems
06/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/13/2026
Special inspection requirement — Heating Systems
06/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/03/2026
Special inspection requirement — Final
05/03/2026
Special inspection requirement — Mechanical Systems
04/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
11/11/2025
Violation issued (HPD, open)
C
11/11/2025
Violation issued (HPD, open)
C
11/11/2025
Violation issued (HPD, closed)
B
11/11/2025
Violation issued (HPD, closed)
C
11/11/2025
Violation issued (HPD, open)
B
11/11/2025
Violation issued (HPD, open)
A
11/11/2025
Violation issued (HPD, closed)
C
11/11/2025
Violation issued (HPD, closed)
A
11/11/2025
Violation issued (HPD, closed)
C
11/15/2023
Violation issued (HPD, closed)
I
11/03/2022
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
11/07/2019
Violation issued (HPD, closed)
C
09/30/2018
Violation issued (HPD, closed)
C
09/30/2018
Violation issued (HPD, closed)
C
03/17/2018
Violation issued (HPD, closed)
B
03/17/2018
Violation issued (HPD, closed)
B
03/17/2018
Violation issued (HPD, closed)
B
03/17/2018
Violation issued (HPD, closed)
B
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDShamas Contracting Co07/08/2013
BISOTISSUEDShamas Contracting Co07/05/2013
BISEQISSUEDB H & B Construction06/20/2013
BISPLISSUEDForego Plumbing & Heating06/07/1996
BISEQISSUEDFlintlock Construction01/09/1996
BIS—ISSUEDFlintlock Construction01/09/1996
BIS—ISSUEDSacco Construction Co06/02/1992
BISEQISSUEDSacco Construction Co06/02/1992
1 project · most recent 10/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/06/2026——Gas, Storm, Water/Sanitary
1 project · most recent 10/06/2026
Masonry Wood
FiledStatusContractorScope
10/06/2026——Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/24/2026Insulation placement and R values—energy_progress
09/23/2026Tenant Protection Plan Compliance—special
09/23/2026Fenestration air leakage—energy_progress
09/23/2026Air barrier - visual inspection—energy_progress
09/23/2026Fire-Resistance Rated Construction—progress
09/23/2026Fire-Resistant Penetrations and Joints—special
09/23/2026Energy Code Compliance Inspections—progress
09/23/2026Vestibules—energy_progress
09/23/2026Interior lighting power—energy_progress
09/23/2026Lighting in dwelling units—energy_progress
09/23/2026Lighting controls—energy_progress
09/23/2026Fenestration and door U-factor and product ratings—energy_progress
09/23/2026Exterior lighting power—energy_progress
07/16/2026Masonry—special
06/17/2026Tenant Protection Plan Compliance—special
06/17/2026Energy Code Compliance Inspections—progress
06/17/2026HVAC-R and service water piping design and insulation—energy_progress
06/15/2026Chimneys and vents—special
06/14/2026HVAC-R and service water heating system controls—energy_progress
06/14/2026Tenant Protection Plan Compliance—special
06/14/2026Fire-Resistant Penetrations and Joints—special
06/14/2026Heating Systems—special
06/14/2026HVAC-R and service water heating equipment—energy_progress
06/14/2026HVAC-R and service water piping design and insulation—energy_progress
06/13/2026Heating Systems—special
Latest 25 of 40.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
10/04/2026X01363186-S5Request digital key ↗
10/04/2026X01363186-S4Request digital key ↗
10/04/2026X01363186-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
07/06/2013220322504Open ↗
06/19/2013240028359Open ↗
▸BISWORK PERMIT APPLICATION2
07/06/2013220322504Open ↗
06/19/2013240028359Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
10/04/2026X01363186-S3Open ↗
10/04/2026X01363186-S4Open ↗
10/04/2026X01363186-S2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/27/2014240028359Open ↗
03/14/2014220322504Open ↗
07/06/2013220322504Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/19/2013240028359Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/06/2013220322504Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/19/2013240028359Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/19/2013240028359Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/06/2013220322504Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/19/2013240028359Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
10/04/2026X01363186-S6Open ↗
10/04/2026X01363186-S5Open ↗
10/04/2026X01363186-S4Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/27/2014240028359Open ↗
03/14/2014220322504Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/14/2014220322504Open ↗
07/06/2013220322504Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
07/06/2013220322504Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/19/2013240028359Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
10/04/2026X01363186-S1Open ↗