← Back
Primarily 2 family with 1 store or office
9208 3 AVENUE
BROOKLYN · BIN 3155069
💬 Discuss this project
1910Year Built
2Stories
S2Building Class
R6BZoning
2,000 sfGross Floor Area
3Units
3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 18 docs
Floor 12p · 1 filing · 18 docs
Cellar2p · 1 filing · 18 docs
Nothing on file for this building.
Building Lifecycle
All (32)Filed (4)Permit Issued (2)Signed Off (2)Violation (7)Inspection (5)Special Inspection (12)
05/09/2025
Signed off — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls. Install exhaust system, finishing floor, walls and ceiling as per plans. No change in egress, occupancy or use is involved under this application.
B01154232-I1
05/07/2025
Signed off — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls. Install exhaust system, finishing floor, walls and ceiling as per plans. No change in egress, occupancy or use is involved under this application.
B01154232-S1
05/02/2025
Special inspection requirement — Maintenance information
James Wai
05/02/2025
Special inspection requirement — Mechanical Systems
James Wai
05/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Wai
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
05/02/2025
Special inspection requirement — Energy Code Compliance Inspections
James Wai
05/02/2025
Special inspection requirement — Final
James Wai
05/02/2025
Special inspection requirement — Interior lighting power
James Wai
05/02/2025
Special inspection requirement — Lighting controls
James Wai
05/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
James Wai
05/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
James Wai
04/30/2025
Filed — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls. Install exhaust system, finishing floor, walls and ceiling as per plans. No change in egress, occupancy or use is involved under this application.
B01154232-P2
04/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Wai
02/25/2025
Filed — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls. Install exhaust system, finishing floor, walls and ceiling as per plans. No change in egress, occupancy or use is involved under this application.
B01154232-P1
02/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Wai
02/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/18/2024
Permit issued — Plumbing
B01154232-S1-PL
12/17/2024
Permit issued — Mechanical Systems
B01154232-I1-GC-CX
12/12/2024
Filed — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls. Install exhaust system, finishing floor, walls and ceiling as per plans. No change in egress, occupancy or use is involved under this application.
B01154232-I1
12/12/2024
Filed — Alteration
Interior renovation of existing eating and drinking establishment. Remove and install partition walls. Install exhaust system, finishing floor, walls and ceiling as per plans. No change in egress, occupancy or use is involved under this application.
B01154232-S1
09/12/2022
Violation issued (ECB, open)
Construction
03/10/2005
Violation issued (ECB, closed)
Construction
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2004
Violation issued (ECB, closed)
Construction
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JANA ASS INC103/22/2026
DISH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JKW ENGINEERING, P.C.404/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JKW ENGINEERING PC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL LUXURY SRVCS INCGeneral Contractor203/21/2026
IPS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JKW ENGINEERING, P.C.1856404/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offIPS PLUMBING CORP12/18/2024
DOB NOWMechanical SystemsSigned-offGLOBAL LUXURY SRVCS12/17/2024
BISOTISSUEDHENRYSMITH PROPERTY MGMT02/21/2013
BISFPISSUEDCHIEF FIRE PREVENTION & MECHANIC10/21/2004
BISPLISSUEDFALIDERIO PLUMBING & HTG CORP08/26/2004
BISEQISSUEDH & R GLASS08/18/2004
BISOTISSUEDH & R GLASS08/18/2004
BISPLISSUEDK & BH PLUMBING & HTG INC04/09/2003
BIS—ISSUEDYU YE COSNTRUCTION INC04/03/2003
BISEQISSUEDYU YE COSNTRUCTION INC04/03/2003
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/02/2025Maintenance informationJames Waienergy_progress
05/02/2025Mechanical SystemsJames Waispecial
05/02/2025Tenant Protection Plan ComplianceJames Waispecial
05/02/2025Fire-Resistant Penetrations and JointsJames Waispecial
05/02/2025Energy Code Compliance InspectionsJames Waiprogress
05/02/2025FinalJames Waiprogress
05/02/2025Interior lighting powerJames Waienergy_progress
05/02/2025Lighting controlsJames Waienergy_progress
05/02/2025HVAC-R and service water heating system controlsJames Waienergy_progress
05/02/2025HVAC-R and service water heating equipmentJames Waienergy_progress
02/26/2025Tenant Protection Plan ComplianceJames Waispecial
02/23/2025Tenant Protection Plan ComplianceJames Waispecial
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B01154232-S1Contact architect ↗
08/23/2026B01154232-I1Contact architect ↗
08/23/2026B01154232-P2Contact architect ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/20/2013340041494Open ↗
▸BISWORK PERMIT APPLICATION1
02/20/2013340041494Open ↗
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/07/2013340041494Open ↗
05/07/2013340041494Open ↗
05/07/2013340041494Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01154232-S1Open ↗
08/23/2026B01154232-I1Open ↗
08/23/2026B01154232-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01154232-P1Open ↗
09/01/2026B01154232-I1Open ↗
09/01/2026B01154232-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01154232-I1Open ↗
09/01/2026B01154232-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/20/2013340041494Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/20/2013340041494Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/20/2013340041494Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01154232-S1Open ↗
08/23/2026B01154232-P2Open ↗
08/23/2026B01154232-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/20/2013340041494Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/07/2013340041494Open ↗
05/07/2013340041494Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/07/2013340041494Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/20/2013340041494Open ↗
▸BISNYCECC ANALYSIS1
02/20/2013340041494Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/20/2013340041494Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/20/2013340041494Open ↗
02/20/2013340041494Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/07/2013340041494Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/07/2013340041494Open ↗
02/20/2013340041494Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/20/2013340041494Open ↗