← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Duncan Elder Apts
921 EAST 180TH STREET · BIN 2114117
💬 Discuss this project
1997Year Built
7Stories
D7Building Class
R7-1Zoning
98,141 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized10 Active Violations 4 likely answered ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: Daly 180 Housing Development Fund · 28,100 sf lot · 3.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRooftop condensing unit replacementUnder Construction3p · 2 filings · 12 docs
Floor 1Deli kitchen hood and ductwork installationUnder Construction15p · 3 filings · 20 docs
CellarBoiler replacement in cellar5p · 2 filings · 8 docs
Site & exteriorHeavy duty sidewalk shed installation18p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Real Estate Development for Phipps Hous403/21/2026
Phipps Houses Services209/15/2026
Daly 180 Housing Development Fun203/22/2026
Daly Avenue103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vincent J. Liotta P.E108/26/2026
Bitopi Consultants111/04/2025
Southern Associates112/22/2020
Green Design103/12/2020
Bazini Engineering201/10/2020
Syed Engineering312/06/2019
Haider Engineering, P.E103/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Haider Engineering, P.E103/21/2026
Superior Fire Control103/21/2026
Jared Development203/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G Construction ServicesScaffold607/08/2026
Parsons ConstructionScaffold407/08/2026
Paul Traktman Lic PLBRPlumbing407/08/2026
Hope Home ImprovementGeneral Contractor107/08/2026
Superior Fire ControlGeneral Contractor104/09/2026
Thompson Electrical Main ServiceElectrical103/21/2026
Afgo Mechanical Servicesspecialty_contractor109/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vincent J. Liotta P. E1974108/26/2026
Bitopi Consultants7036111/04/2025
S&S Concrete & Soil Testi1008112/22/2020
Building Lifecycle
All (126)Filed (10)Permit Issued (13)Signed Off (2)Facade (FISP) (19)Violation (60)Special Inspection (22)
09/14/2026
Permit issued — Mechanical Systems
X01420394-I1-MS
08/26/2026
Filed — Alteration
REPLACEMENT OF TWO ROOFTOP CONDENSING UNITS WITH A TOTAL CAPACITY OF 13.5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
X01420394-I1
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
06/22/2026
Special inspection requirement — Maintenance information
Vincent Liotta
06/22/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
06/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Vincent Liotta
06/22/2026
Special inspection requirement — Final
Vincent Liotta
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
11/17/2025
Permit issued — Mechanical Systems
X01164943-I1-MS
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/04/2025
Filed — Alteration
FILING TO INSTALL DELI KITCHEN HOOD AND DUCTWORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01164943-I1
09/19/2025
Violation issued (ECB, closed)
Elevators
01/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
01/09/2025
Special inspection requirement — Final
KAMRUL AHSAN
01/09/2025
Special inspection requirement — Mechanical Systems
KAMRUL AHSAN
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/13/2024
Violation issued (ECB, closed)
Elevators
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2022
Cycle 9 facade report submitted
08/30/2022
Cycle 9 facade report signed — SWARMP
08/10/2022
Cycle 9 facade inspection completed
06/02/2022
Violation issued (HPD, closed)
B
06/02/2022
Violation issued (HPD, closed)
C
06/02/2022
Violation issued (HPD, closed)
C
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/11/2021
Permit issued — Mechanical Systems
X00436657-I1-MS
12/22/2020
Filed — Alteration
REPLACEMENT OF EXISTING AIR-CONDITIONING UNITS AS PER SUBMITTED DRAWINGS.
X00436657-I1
12/04/2020
Special inspection requirement — Permanent certificate
GLEN LANGER
12/04/2020
Special inspection requirement — HVAC insulation and sealing
GLEN LANGER
12/04/2020
Special inspection requirement — Heating Systems
GLEN LANGER
12/04/2020
Special inspection requirement — Post-installed Anchors
GLEN LANGER
12/04/2020
Special inspection requirement — Mechanical Systems
GLEN LANGER
12/04/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
12/04/2020
Special inspection requirement — Final
GLEN LANGER
12/04/2020
Special inspection requirement — HVAC and service water heating equipment
GLEN LANGER
12/04/2020
Special inspection requirement — HVAC and service water heating system controls
GLEN LANGER
12/04/2020
Special inspection requirement — Maintenance information
GLEN LANGER
12/04/2020
Special inspection requirement — Duct leakage testing
GLEN LANGER
11/02/2020
Violation issued (HPD, closed)
B
11/02/2020
Violation issued (HPD, closed)
B
11/02/2020
Violation issued (HPD, closed)
B
11/02/2020
Violation issued (HPD, closed)
B
11/02/2020
Violation issued (HPD, closed)
A
11/02/2020
Violation issued (HPD, closed)
B
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAfgo Mechanical Services09/14/2026
DOB NOWMechanical SystemsPermit IssuedSuperior Fire Control11/17/2025
DOB NOWMechanical SystemsPermit IssuedHope Home Improvement01/11/2021
DOB NOWSidewalk ShedPermit IssuedParsons Construction10/13/2020
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services06/08/2020
DOB NOWSidewalk ShedPermit IssuedParsons Construction03/12/2020
DOB NOWBoiler EquipmentPermit IssuedPaul Traktman Lic PLBR01/29/2020
DOB NOWPlumbingSigned-offPaul Traktman Lic PLBR01/28/2020
DOB NOWBoiler EquipmentPermit IssuedPaul Traktman Lic PLBR01/10/2020
DOB NOWPlumbingSigned-offPaul Traktman Lic PLBR01/10/2020
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services06/24/2019
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services12/17/2018
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services03/30/2018
BISOTISSUEDTitan Construction Services11/24/2014
BISOTISSUEDTitan Construction Services08/12/2014
BISEQISSUEDColgate Enterprise04/02/2014
BISOTISSUEDTitan Construction Services11/15/2013
BISEQISSUEDColgate Enterprise02/26/2013
BISPLISSUEDMaxwell Plumbing Mechanical05/22/2007
BISPLISSUEDMaxwell Plumbing Mechanical05/22/2007
BISMHISSUEDMike's Awning04/23/2007
BISEQISSUEDRockledge Scaffold01/24/2007
BISPLISSUEDMaxwell Plumbing Mechanical11/14/2005
BISPLISSUEDMaxwell Plumbing Mechanical10/13/2005
BISMHISSUEDIdeal Kitchen Ventilation03/25/2005
BISPLISSUEDAuthentic Plumbing01/05/2004
BISOTISSUEDV. Cloud Painting and Con12/24/2003
BIS—ISSUEDHRH Construction03/05/1999
BISPLISSUEDTristate Plumbing Services01/15/1999
BISFPISSUEDLund Fire Products12/09/1998
BISSPISSUEDRam Fire Protection11/17/1998
BISPLISSUEDTristate Plumbing Services10/23/1998
BISOTISSUEDHRH Construction08/28/1998
BISMHISSUEDHRH Construction08/28/1998
BISSDISSUEDRam Fire Protection08/13/1998
BISSPISSUEDRam Fire Protection07/20/1998
BISEQISSUEDHRH Construction03/03/1998
BIS—ISSUEDHRH Construction03/03/1998
BISEQISSUEDHRH Construction01/21/1998
BISEQISSUEDUnited Hoisting Co09/24/1997
+ 2 more permits on file
3 projects · most recent 08/26/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2026Permit IssuedAfgo Mechanical ServicesAir Conditioning Systems
Cooling
Trane TTA072K3AAA**BS01 6 tons · Condensing Unit ×1
TTA090K3AAA**BS01 90,000 BTU · Condensing Unit ×1
11/04/2025Permit IssuedSuperior Fire ControlVentilation Systems
Ventilation
Pen Vent USBI18DD 3,500 CFM · Exhaust Fan ×1
12/22/2020Permit IssuedHope Home ImprovementAir Conditioning Systems
Cooling
Trane 4TTR3048E1000PB 1 tons · Condensing Unit ×4
2 projects · most recent 03/12/2020
FiledStatusContractorScope
03/12/2020CompleteRichard Neu—
03/30/2018Permit IssuedWCK Electric—
2 projects · most recent 03/12/2020
Sidewalk Shed
FiledStatusContractorScope
03/12/2020Permit IssuedParsons ConstructionSidewalk Shed
12/06/2019Permit IssuedJ & G Construction ServicesSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/22/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
06/22/2026Maintenance informationVincent Liottaenergy_progress
06/22/2026Mechanical SystemsVincent Liottaspecial
06/22/2026Tenant Protection Plan ComplianceVincent Liottaspecial
06/22/2026FinalVincent Liottaprogress
06/22/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
06/22/2026HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
01/09/2025Tenant Protection Plan ComplianceKAMRUL AHSANspecial
01/09/2025FinalKAMRUL AHSANprogress
01/09/2025Mechanical SystemsKAMRUL AHSANspecial
12/04/2020Permanent certificateGLEN LANGERenergy_progress
12/04/2020HVAC insulation and sealing GLEN LANGERenergy_progress
12/04/2020Heating SystemsGLEN LANGERspecial
12/04/2020Post-installed AnchorsGLEN LANGERspecial
12/04/2020Mechanical SystemsGLEN LANGERspecial
12/04/2020Fire-Resistant Penetrations and JointsGLEN LANGERspecial
12/04/2020FinalGLEN LANGERprogress
12/04/2020HVAC and service water heating equipment GLEN LANGERenergy_progress
12/04/2020HVAC and service water heating system controls GLEN LANGERenergy_progress
12/04/2020Maintenance informationGLEN LANGERenergy_progress
12/04/2020Duct leakage testing GLEN LANGERenergy_progress
12/30/2019HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Sidewalk Shed4
08/26/2026X00030897-P2Request digital key ↗
08/26/2026X00330866-I1Request digital key ↗
08/15/2026X00030897-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch2
08/26/2026X00030897-I1Request digital key ↗
08/18/2026X01164943-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026X00288762-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00288784-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00436657-I1Request digital key ↗
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION13
06/10/2020220706788Open ↗
06/10/2020220706788Open ↗
06/08/2020220706788Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION8
12/30/2019220706788Open ↗
06/28/2019220706788Open ↗
11/28/2014220407735Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
06/03/2019220706788Open ↗
08/16/2018220254757Open ↗
08/15/2018220254757Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026X01420394-I1Open ↗
09/23/2026X01164943-I1Open ↗
09/23/2026X00288762-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/10/2026X01420394-I1Open ↗
08/26/2026X00030897-P2Open ↗
08/26/2026X00030897-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026X01420394-I1Open ↗
09/23/2026X01164943-I1Open ↗
09/23/2026X01164943-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
06/03/2019220706788Open ↗
08/15/2018220254757Open ↗
09/30/2014220407735Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
06/03/2019220706788Open ↗
08/15/2018220254757Open ↗
09/29/2014220407735Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/26/2013220254757Open ↗
11/19/2009220038019Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE PERMITS2
05/21/2021201071838Open ↗
05/21/2021201071838Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
08/13/2026X00288762-I1Open ↗
08/13/2026X00330866-I1Open ↗
08/13/2026X00288784-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
06/03/2019220706788Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/09/2010220038019Open ↗
11/19/2009220038019Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/25/2014220344606Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01164943-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/03/2019220706788Open ↗
04/22/2015220407735Open ↗
09/30/2014220407735Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/22/2015220344606Open ↗
04/22/2015220407735Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/11/2020220706788Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00288762-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/11/2020220706788Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
06/11/2020220706788Open ↗
08/16/2018220254757Open ↗
07/07/2015220407735Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/21/2021201071838Open ↗
05/21/2021201071838Open ↗
04/22/2015220344606Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
02/26/2013220254757Open ↗
11/19/2009220038019Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/10/2026X01420394-I1Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT12
06/10/2020220706788Open ↗
06/04/2020220706788Open ↗
06/03/2019220706788Open ↗
Showing 3 of 12 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/28/2019220706788Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/11/2020220706788Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET5
06/03/2019220706788Open ↗
09/29/2014220407735Open ↗
11/13/2013220344606Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
06/10/2020220706788Open ↗
08/15/2018220254757Open ↗
08/08/2014220344606Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
08/16/2018220254757Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00030897-I1Open ↗