← Back
BuildNYC
Five to six families
921 METROPOLITAN AVENUE
BROOKLYN · BIN 3070324
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
R6BZoning
4,180 sfGross Floor Area
6Units
Rent Stabilized11 Active Violations ▸FDNY Report ↗
Five to six families · Owner of record: 921 Metro · 2,533 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior renovation1 filing · 2 docs
Floor 2Interior renovation1 filing · 2 docs
Floor 1Interior renovation1 filing · 2 docs
CellarInterior renovation1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
921 Metro203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Robert McGee210/29/2026
Jag Engineering110/16/2026
Commoncraft Architecture109/25/2026
Building Lifecycle
11/18/2026
Objection raised — Other
10/29/2026
Filed — Alteration
Propose interior renovation to combine existing apartments on the 1st & 2nd floors as per TPPN 3/97 to include minor non-bearing demolition, new partition, kitchen works, interior finished works, new exterior windows & doors.
B01446269-S3
10/29/2026
Filed — Alteration
Propose interior renovation to combine existing apartments on the 1st & 2nd floors as per TPPN 3/97 to include minor non-bearing demolition, new partition, kitchen works, interior finished works, new exterior windows & doors.
B01446269-S2
10/29/2026
Objection resolved — Resolved
10/26/2026
Objection raised — Other
59 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 10/29/2026
Steel
FiledStatusContractorScope
10/29/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
10/20/2026Maintenance information—energy_progress
10/20/2026HVAC-R and service water heating system controls—energy_progress
10/20/2026HVAC-R and service water piping design and insulation—energy_progress
10/20/2026Mechanical Systems—special
10/20/2026HVAC-R and service water heating equipment—energy_progress
10/20/2026Fire-Resistant Penetrations and Joints—special
10/20/2026Maintenance information—energy_progress
10/20/2026Duct leakage testing, insulation and design—energy_progress
10/20/2026HVAC-R and service water piping design and insulation—energy_progress
10/20/2026HVAC-R and service water heating system controls—energy_progress
10/20/2026HVAC-R and service water heating equipment—energy_progress
10/20/2026Final—progress
10/20/2026Energy Code Compliance Inspections—progress
10/15/2026Structural Steel - Details—special
10/15/2026Structural Stability – Alterations of existing buildings—special
10/15/2026Construction Operations Influencing Adjacent Structures—special
10/15/2026Post-installed Anchors—special
10/15/2026Structural Steel - High Strength Bolting—special
10/15/2026Structural Steel - Welding—special
10/15/2026Final—progress
08/16/2026Tenant Protection Plan Compliance—special
08/16/2026Air barrier - visual inspection—energy_progress
08/16/2026Insulation placement and R values—energy_progress
08/16/2026Structural Stability – Alterations of existing buildings—special
08/14/2026Fenestration areas—energy_progress
Latest 25 of 33.
2 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account