← Back
BuildNYC
Elevator apt, semi-fireproof without stores
921 WASHINGTON AVENUE
BROOKLYN · BIN 3029718
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
R8AZoning
80,500 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized36 Active Violations 32 unresolved · 4 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Washington Avenue Owner · 19,947 sf lot · 4.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Unit 6A, Unit 6B, Unit 6E +414p · 6 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2Grj, LLC3p · 1 filing · 4 docs
Floor 1Unit 1A, Unit 1B, Unit 1D +210p · 7 filings · 20 docs
CellarGrj, LLC1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GRJ4407/08/2026
921 Washington2103/22/2026
Washington 9211603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2018$33.2M—WASHINGTON 921 LIMITED PARTNERSHIP → 921 WASHINGTON AVENUE LLC$412/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Andrew Fredman Architect1004/23/2020
Structural Design Collaborative202/04/2020
Green Design205/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nazaret Koroglu PE603/21/2026
Arra Architecture903/21/2026
Atlantic Building Supply403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Construction XpertGeneral Contractor1007/08/2026
Village P & H NYPlumbing807/08/2026
Construction XpertScaffold603/21/2026
Construction Xpertspecialty_contractor507/08/2026
Ovq ConsolidatedGeneral Contractor203/21/2026
Environmental AppraiserGeneral Contractor203/21/2026
Foster Electrical ServiceElectrical203/22/2026
Metropolitan P HPlumbing103/21/2026
Everest ScaffoldingGeneral Contractor103/21/2026
Apical ServicesGeneral Contractor103/21/2026
Carson St EquitiesGeneral Contractor103/21/2026
DRW ConsolidatedGeneral Contractor103/21/2026
D & L Plumbing and HeatingPlumbing107/22/1991
EZ Runer ConstructionPlumbing111/17/2016
Jade RestorationGeneral Contractor106/05/2008
Jia Wei ConstructionGeneral Contractor105/24/2013
Johnny's P&HPlumbing111/13/2008
Metro Environmental ContractingGeneral Contractor111/10/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Integrity Consulting Service666804/23/2020
Building Lifecycle
06/12/2026
§27-2104(b) hmc post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the…
HPD violation · open
05/06/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/23/2026
Elevator Category 1 inspection report filed
04/23/2026
Elevator Category 5 inspection report filed
04/13/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 1st ROOM FROM…
HPD violation · open
259 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offConstruction Xpert04/29/2021
DOB NOWPlumbingSigned-offVillage P & H NY01/15/2021
DOB NOWMechanical SystemsSigned-offConstruction Xpert01/15/2021
DOB NOWStructuralSigned-offConstruction Xpert07/06/2020
DOB NOWMechanical SystemsSigned-offConstruction Xpert07/01/2020
DOB NOWSupported ScaffoldPermit IssuedConstruction Xpert06/30/2020
DOB NOWPlumbingSigned-offVillage P & H NY02/12/2020
DOB NOWPlumbingSigned-offVillage P & H NY01/23/2020
DOB NOWPlumbingSigned-offVillage P & H NY10/09/2019
DOB NOWMechanical SystemsSigned-offConstruction Xpert09/30/2019
DOB NOWSupported ScaffoldPermit IssuedConstruction Xpert12/04/2018
BISPLISSUEDVillage P & H NY04/20/2020
BISOTISSUEDConstruction Xpert03/02/2020
BISOTISSUEDConstruction Xpert02/21/2020
BISOTISSUEDConstruction Xpert01/17/2020
BISOTISSUEDConstruction Xpert09/20/2019
BISPLISSUEDVillage P & H NY09/06/2019
BISPLISSUEDVillage P & H NY03/01/2019
BISOTISSUEDConstruction Xpert02/25/2019
BISPLISSUEDVillage P & H NY02/06/2019
BISOTISSUEDConstruction Xpert01/24/2019
BISOTISSUEDConstruction Xpert01/24/2019
BISOTISSUEDConstruction Xpert12/14/2018
BISMHISSUEDConstruction Xpert12/14/2018
BISOTISSUEDConstruction Xpert12/12/2018
BISPLISSUEDVillage P & H NY08/03/2018
BISOTISSUEDConstruction Xpert07/27/2018
BISMHISSUEDConstruction Xpert07/27/2018
BISPLISSUEDEZ Runer Construction11/17/2016
BISOTISSUEDOvq Consolidated01/21/2016
BISOTISSUEDOvq Consolidated01/21/2016
BISOTISSUEDOvq Consolidated11/22/2013
BISOTISSUEDJia Wei Construction05/24/2013
BISOTISSUEDDRW Consolidated07/18/2012
BISOTISSUEDDRW Consolidated02/16/2012
BISOTISSUEDApical Services01/18/2011
BISOTISSUEDApical Services08/31/2010
BISOTISSUEDCarson St Equities01/20/2010
BISPLISSUEDMetropolitan Plumbing and Heating01/13/2010
BISEQISSUEDEverest Scaffolding03/14/2009
+ 8 more permits on file
6 projects · most recent 12/09/2020
General Wiring
FiledStatusContractorScope
12/09/2020CompleteFoster Electrical ServiceGeneral Wiring
01/31/2020Permit IssuedFoster Electrical ServiceGeneral Wiring
01/23/2020CompleteFoster Electrical ServiceGeneral Wiring
10/13/2019CompleteFoster Electrical ServiceGeneral Wiring
01/27/2019CompleteFoster Electrical ServiceGeneral Wiring
08/08/2018Permit IssuedTesta ElectricGeneral Wiring
1 project · most recent 05/29/2019
Scaffold
FiledStatusContractorScope
05/29/2019Permit IssuedConstruction XpertScaffold
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
12/20/2020Mechanical SystemsALEKSANDR LEVINspecial
04/23/2020Energy Code Compliance InspectionsALEKSANDR LEVINprogress
04/23/2020FinalALEKSANDR LEVINprogress
04/23/2020Maintenance informationALEKSANDR LEVINenergy_progress
04/23/2020HVAC insulation and sealing ALEKSANDR LEVINenergy_progress
04/17/2020Mechanical SystemsALEKSANDR LEVINspecial
04/17/2020Energy Code Compliance InspectionsALEKSANDR LEVINprogress
04/17/2020FinalALEKSANDR LEVINprogress
04/17/2020HVAC insulation and sealing ALEKSANDR LEVINenergy_progress
04/17/2020Shutoff dampersALEKSANDR LEVINenergy_progress
04/17/2020Mechanical SystemsALEKSANDR LEVINspecial
04/17/2020Maintenance informationALEKSANDR LEVINenergy_progress
04/17/2020FinalALEKSANDR LEVINprogress
04/17/2020HVAC insulation and sealing ALEKSANDR LEVINenergy_progress
04/17/2020Shutoff dampersALEKSANDR LEVINenergy_progress
04/17/2020Maintenance informationALEKSANDR LEVINenergy_progress
334 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account